ACP WG B Work Program Frequency Planning Criteria

Slides:



Advertisements
Similar presentations
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Advertisements

Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
1 Regulatory Reform of Domestic Regulations in the Telecommunications Sector - Japanese Experience- FURUICHI, Hirohisa Senior Advisor General Affairs Division.
Wiktor Sęga, Office of Electronic Communications, Poland
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Frequency Management In Europe Presented by John Mettrop
Introduction to Aeronautical Data Links
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
ACD A Presented By John Mettrop Directorate of Airspace Policy Surveillance & Spectrum Management World Radiocommunications Conference CEPT.
Nairobi, Kenya September 2007 Preparations for WRC-07 Proposals from the Asia-Pacific Telecommunity (APT) Presented by Robert Witzen Technical Officer,
CITEL Preparation World Radiocommunication Conference (WRC-12) Fortaleza Brazil August, 2010.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
DESIGN OF A SPECIFIC CDMA SYSTEM FOR AIR TRAFFIC CONTROL APPLICATIONS UNIVERSIDAD DE LAS PALMAS DE GRAN CANARIA UNIVERSIDAD POLITÉCNICA DE MADRID.
Frequency Management in the AFI Region Presented by A. Sene, RO/CNS, Nairobi Aeronautical Frequency Management Seminar (Nairobi, 17 – 19 February 2004)
ITU-R Working Party 8D Status Update Inte rnational Civil Aviation Organization Regional Preparatory Group (RPG) Meeting for World Radiocommunication Conference.
Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
Nav, Spectrum & Surveillance RPG for WRC-2007, ACP WGs B&F and NSP SSG, Bangkok Feb 2005 International Civil Aviation Organization Regional Preparatory.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Frequency Management Group Chairman
International Civil Aviation Organization
ACD A Frequency Management Activities in Europe PRESENTED BY: FMG Chairman John Mettrop From UK Civil Aviation Authority.
ACD A ITU Working Party 8B Activities Presented By John Mettrop UK Civil Aviation Authority.
The Air-ground VHF Communication System of Japan Teruaki Nagasawa Mobile Satellite Communication Division Telecommunications Bureau Ministry of Internal.
FMG/5 september 2001 International Civil Aviation Organization 17th Meeting of Aeronautical Communications Panel Working Group B (ACP WG-B) Montreal, Canada.
VDL Mode 3 Cosite Interference Testing Summary WP-WGB1701A Attachment A International Civil Aviation Organization 17th Meeting of Aeronautical Communications.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004.
WGM 8 meeting / November EUROCONTROL VDL Mode 4 Airborne Architecture Study (VM4AAS) Study Overview and Conclusions Nikos Fistas EATMP / EUROCONTROL.
Presentation by K. P. Rimal, Regional Officer of the ICAO ASIA-PACIFIC Office to the Seminar on implementation of data link and SATCOM Communications in.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
B-VHF Final Project Results – Brussels – 19. September 2006 Page: 1 Air Ground Communication Focus Group Meeting Brussels, 19. September 2006 B-VHF – Final.
Break Time Remaining 10:00.
Regional Preparatory Workshop for the ITU WRC-2015
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
15. Oktober Oktober Oktober 2012.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
International Civil Aviation Organization
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Status of ITU-R Work On Agenda Item 1.6 M. Biggs.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Clock will move after 1 minute
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
EMF Working meeting Madrid 8-9 March kHz VHF Radio Louis BERGER.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
ICAO Position for ITU WRC-15
VDL Mode 3 Cosite Interference Testing Summary
The air-ground VHF communication system of Japan
Thailand, Bangkok, 18 – 21 October 2016
SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK
International Civil Aviation Organization
VDL Mode 4 Cosite Investigations
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002
SADC WRC-15 Preparatory Meeting
Draft ICAO Position for ITU WRC-15
Frequency Management Group Chairman
International Civil Aviation Organization
International Civil Aviation Organization
Draft ICAO Position for ITU WRC-15
Presentation transcript:

ACP WG B Work Program Frequency Planning Criteria VDL Mode 2 VDL Mode 3 VDL Mode 4 VDL Mode 4 Global Signaling Channel On-board aircraft compatibility

Papers for WG B 18TH Meeting, 17-25 February 2005 Bangkok, Thailand Working Paper 9, Report of VDL Mode 3 Voice Quality Tests With Radio Interference, by Yasuyoshi Nakatani, Japan

VDL Frequency Planning WGB/17 completed the frequency assignment planning material, including relevant guidance material, for VHF digital link (VDL) Modes 2 VDL Mode 3 could operate on the fourth adjacent 25 kHz channel from a DSB-AM assignment and on the second adjacent 25 kHz channel from a VDL Mode 3 assignment. Test planning for VDL Mode 4, including the need for an assignment in the 112-117.975 MHz band is on-going. Excerpt From ACP-Memo/02, 14/01/05, from ACP Secretary to Members, Aeronautical Communications Panel (ACP)

Summary VDL Mode 2 Frequency Planning Criteria1 Number of Channels for no planning Note: 1. WGB16/WP14 Appendix (after Tokyo) from AMCP/8-WP/66 5J-20 Appendix J to the Report on Agenda Item 5.

Vs Interference Source DSB-AM VDL M3 A G 1 - 42 2 22 Summary VDL Mode 3 Frequency Planning Criteria1 Number of Channels for no planning Vs Interference Source DSB-AM VDL M3 A G Victim 1 - 42 2 22 Notes: 1. WP-WGB17 Document 08, 17th Meeting of Aeronautical Communications Panel Working Group B (ACP WG-B) Montreal, Canada, 20 to 25 October 2004 and 26 to 28 October 2004, VDL Mode 3 to VDL Mode 3 Avionics Interference Testing, Agenda Item 4: VDL frequency assignment planning criteria for VDL Mode 3, Presented by the United States of America.  2. ACP-Memo/02, 14/01/05, Ref SP 62/2, To Members, Aeronautical Communications Panel (ACP), From ACP Secretary, Progress of Aeronautical Communications Panel (ACP) Subject, To note and provide comments by 15 February 2005.

Status Frequency Planning Criteria VDL Mode 4 Test Plan Presented to WG B Testing according to the test plan is planned for early next year. Reference: ACP (WG B), 17th Meeting, 20 – 25th of October 2004, Montreal, Canada Signalling Channels for VDL Mode 4, F. Lindblom, Swedish CAA, Sweden

VDL Band implementation target plan agreed by the EANPG FMG. Reference: ACP (WG B), 17th Meeting, 20 – 25th of October 2004, Montreal, Canada Signalling Channels for VDL Mode 4, F. Lindblom, Swedish CAA, Sweden

Future Work VDL Mode 4 Global Signaling Channel Further work was needed to complete the the work on Frequency Planning Criteria. VDL Mode 3 to VDL Mode 2 VDL Mode 4 to VDL Mode 2 Guidance material on 8.33 kHz and 50 kHz radios. There are currently no plans to provide further guidance material on 50 kHz radios, unless required. Note: 1. Report of the 17th Meeting of Aeronautical Communications Panel (ACP) Working Group B, 20 to 25 October, 2004, Montreal, Canada VDL Mode 4 Global Signaling Channel On-board aircraft EMC is ongoing