LINK2000+ Status Søren Dissing

Slides:



Advertisements
Similar presentations
A 2030 framework for climate and energy policies Marten Westrup
Advertisements

UAS: Regulatory developments in EASA Michael Smethers Chairman of EASA Management Board 13 September 2011.
The Implementation Structure DG AGRI, October 2005
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Single European Sky Conference, Limassol Lufthansa German Airlines October 11, 2012 Page 0 Single European Sky and Performance Scheme from an European.
Direction générale de lAviation civile Limassol – October 11th, 2012 Single European Sky Conference Performance scheme Viewed from NSA France by Paul SCHWACH,
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Overview of the interoperability Regulation
U.S. Plans for ADS-B Briefing for
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
International Civil Aviation Organization
Planning and implementation
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
The Single European Sky ATM Research (SESAR) initiative
LINK update Datalink Implementation EC Regulation 29/2009
Air / Ground Communications in Europe
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
Data Communications Program
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
TCP / IP and ATN in Europe Danny Van Roosbroek, EATM/DAS/CSM
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Communication Domain Future Aeronautical Communications
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Introduction Brussels, February 2013 Presented by: Manfred Unterreiner.
Gzim Ocakoglu DG MOVE/ E2 28 May 2013
1 Item 4.5 LSSIP Development and SES Reporting Reference: Action Paper SCG/10/AP06 Danny DEBALS LSSIP Manager SCG/10 – 25 February 2009.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
International Civil Aviation Organization
Mission Trajectory Step 1 From planning to deployment.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
EU Developments Transmission Workgroup 3rd November 2011.
New EU Programme Arrangements Workers Educational Association Future Directions 20 November 2013.
AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services.
CNS/ATM SG #42 ADS-B - CASCADE Presentation Material Cologne, 15 October 2008 Jörg Steinleitner, CASCADE Infrastructure WP Lead.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Transport Revised Performance and Charging Regulations Key changes.
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
ATN Subnetwork Implementation:
FASVIG Introductory Meeting
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
Data Link Communications
Nigel Makins EUROCONTROL
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
Workshop on preparations for ANConf/12 − ASBU methodology
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ATN London - 23 September 2003 Alex Wandels
International Civil Aviation Organization
IBAC – CNS/ATM Datalink Briefing
ICAO WGN New Orleans Nov 2004
DATA LINK IMPLEMENTATION IN EUROPE
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Presentation transcript:

LINK2000+ Status Søren Dissing ICAO ACP / WG-M, Bruxelles, 4 June 2009

Overview History Status Standards Baseline Regulation Eurocontrol Specification Community Specification ESSIP This will provide a planning tool for stakeholder implementation as well as a mechanism for stakeholder implementation progress to be monitored

LINK 2000+ Objectives Implementing En-route CPDLC over ATN/VDL2 Baseline ICAO standards Forward compatible with new services/technology Programme Objectives Above FL285 ACL – ATC Clearances ACM – ATC Microphone Check ACM – ATC Communications Management This shows the scope of the LINK 2000+ Programme and the SES Datalink Implementing Rule (IR). MAAS UAC has been operational since 2003 Key IR Dates LINK Region in yellow by Feb 2013 Rest of EU by Feb 2015 New Aicraft by Jan 2011 Retrofit by Jan 2015

3 - Step Approach to Implementation Pioneers Objective: 100+ aircraft equipped/ MAAS UAC Achieved: 400+ aircraft recruited/ MAAS UAC operational Incentives Objective: accelerate Airborne equipage to gain early benefits, return on investment EU agrees in principle Mandatory Implementation (SES IR) For Operators and ANSPs Objective: more than 75% of flights in LINK airspace by 2014 Pioneers Incentives Mandate 1 2 3

Pioneer Success Lufthansa Lufthansa CityLine 15 Airlines > 400 Airframes (many more are VDL M2) Rockwell, Honeywell and Airbus all Certified

2 - Step Incentive Scheme equipage Forward fit Retro fit Mandatory Carriage 75% Incentives b – Route Charge scheme Earlier Benefits Better flight profiles Less misunderstandings Higher Productivity Less delay Pioneers 25% a – Public funds - first 25% Combined Scheme ANSPs 2008/9 2011 2013 2015

Mandatory Implementation Always part of the LINK 2000+ implementation strategy Single European Sky provided the mechanism - and it also applies to the ANSPs!

It Took 3 Years 5 Months May 2005 EC gave EUROCONTROL a Mandate to Develop an Implementing Rule (IR) for Datalink Services Adoption DELIVERY Initial Plan Feb 06 RA Consult Regulatory Approach May 06 RA Delivery Draft IR RU Update Q3 07 IR Delivery SSC LAW Q2 07 IR Consult

Done!

ANSPs LINK/Core Region IR Key Dates Aircraft Forward Fit New aircraft conform ANSPs LINK/Core Region Aircraft Retrofit Fit ANSPs Whole of EU 1st Jan 2011 7th Feb 2013 5th Feb 2015 2009 2010 2011 2012 2013 2014 2015 2016

Datalink IR Dates LINK Region Feb 2013 All of EU Feb 2015 Forward Fit Jan 2011 Retrofit Old a/c reg before Dec 97 Dec 2017 New FANS a/c Jan 2014 Transport-type State a/c Jan 2014 (if equiping)

Eurocontrol Specification Standards Baseline Doc 9705 ed. 2 with PDRs Link Baseline 1.2/1.4 Eurocontrol Specification Community Specification