M. Silari - ARDENT Kick-off meeting 1CERN, 8 May 2012 ARDENT implementation and execution M. Silari.

Slides:



Advertisements
Similar presentations
DNV No. 1 © 2000 Det Norske Veritas D ET N ORSKE V ERITAS THEMES Plans and expected contribution WP VII - Network Management.
Advertisements

Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
Michele Togno ARDENT ESR 11 – 2D Ionization Chambers Array for Clinical Applications Michele Togno – ARDENT midterm review preparatory meeting, CERNJune,
Overview of ITN Advanced Radiation Dosimetry European Network Training initiative (ARDENT) Mid-Term review Marco Silari (CERN) on behalf of the ARDENT.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
Role of Management and Technical Coordination
H. MAINAUD DURAND PACMAN WP0 OUTLINE Project management structure Project monitoring PACMAN key milestones & deliverables Schedule Funding consideration.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
The Preparatory Phase Proposal a first draft to be discussed.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
THE ARDENT PROJECT AND NEUTRON DETECTION WITH TIMEPIX DEVICES ERLANGEN CENTER FOR ASTROPARTICLE PHYSICS, DECEMBER, 20 TH 2012.
Milestones M5 and M6 Mid-Term Review, October 2013M. Silari – ARDENT overview1 M5: comparison of detector technologies (WP1) M6: choice of detector technology.
Midterm review – ESR 12 Vijayaragavan VISWANATHAN 13/06/2013.
M. Silari - The ARDENT ITN project 1CNAO, Pavia, 19 October 2012 ARDENT February 2012 – January 2016 Advanced Radiation Dosimetry European Network Training.
THE ARDENT PROJECT AND MEDIPIX MEDIPIX MEETING, NOV 28 TH 2012.
Protect, Enhance, and Save Lives III ARDENT Annual Workshop 29/09-02/10/2014 IBA Dosimetry Francesca Bisello ESR 10.
M. Silari - The ARDENT ITN project 1EURADOS, Vienna, 7-10 February 2012 ARDENT February 2012 – January 2016 Advanced Radiation Dosimetry European Network.
Cern.ch/knowledgetransfer. Knowledge Transfer | Accelerating Innovation HEPTech Workshop on Technology Licensing CERN Knowledge Transfer Group: MEDIPIX.
M. Silari - ARDENT Kick-off meeting 1CERN, 8 May 2012 Network, common training programme and outreach M. Silari.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
TALENT Project Office Project administration TALENT Kick-off meeting CERN Hanna Juujӓrvi Training for cAreer deveLopment in high-radiation ENvironment.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
Slide 1 ACEOLE Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator ACEOLE kick-off meeting CERN 2 October 2008.
ARDENT - ESR- 12 Dr. Vijayaragavan VISWANATHAN
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
{ ARDENT –ESR3 Silvia Puddu – 13/06/2013.  About me  Experimental activity  n_TOF  CERF  Radioactive waste  Training  Conferences & Presentations.
ARDENT Advanced Radiation Dosimetry European Network Training initiative WP1: Gas Detectors S. Rollet.
19 November ITN = Initial Training Networks ITN is an FP7 Marie Curie “host-driven” action. European Commission has issued a new call (Call 3) for.
AMVA4NewPhysics Work Packages 5,6,7 Tommaso Dorigo (INFN-Sezione di Padova) CERN, Kick-Off meeting, September 16 th 2015.
IMPLEMENTATION Kick-off meeting Palma Mallorca January 24th 2013 José A. Bengoechea.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
Please always check for the latest version of this file at:
WP 9: 1 st Planning meeting summary Clarification between WP members of common objectives: Workshop planning and logistics with time- line Planning for.
EventsDuration of event (days) Dates (months after start) DeliverablesExternal participation (researcher-days, rd), total = 450 rd Kick-off meeting1m1-m2Protocol0.
TALENT Supervisory Board Meeting TALENT Kick-off meeting CERN H. Pernegger Training for cAreer deveLopment in high-radiation ENvironment Technologies.
Overview of the PicoSEC Project Etiennette Auffray, Network Coordinator CERN PH-CMX.
Introductory presentation Benedikt Bergmann Institute of Experimental and Applied Physics, Czech Technical University in Prague, Czech Republic Vienna.
WP2 status and plans First PMT meeting, May , Strasbourg Françoise Genova WP2 status and plans.
Report on WP13 Sub Task and “Tools to facilitate detector development” 1.Interfacing FE-chips specific to gas detectors to the Scalable Read-out.
Strategic Planning Process
SEEDS: Programme and Objectives SEEDS Kick-off meeting May 4, Lausanne Renate Kunz.
Slide 1 CATHI Training Seamus Hegarty Human Resources Department Marie Curie Actions administrator CATHI kick-off meeting CERN 23 May 2011.
PICOSEC : Training Etiennette Auffray, Network Coordinator CERN PH-CMX.
Neutron Dosimetry and Spectrometry in Complex Radiation Fields using CR-39 detectors This research project has been supported by the Marie Curie Initial.
M. Silari - ARDENT Kick-off meeting 1CERN, 8 May 2012 ARDENT boards M. Silari.
PicoSEC : Project Management Etiennette Auffray, Network Coordinator CERN PH-CMX.
WPO – ITN management & HR Seamus Hegarty HR-RPM 12-month review,
CONFIDENTIAL MATERIAL Michele Togno - II Annual ARDENT Meeting, Milan – October, 14 th D Ionization Chambers Array for Clinical Applications.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
The Basics Carsten P. Welsch.
ARDENT –ESR3 Silvia Puddu – 14/10/2013.
Institute of Informatics & Telecommunications
Marie Curie Research Training Networks Mid-Term Review Meeting
Annual Report Instructions
WP5: Dissemination, studies, web portal and tools
Compact readout unit for the EP-RADMON radiation monitoring sensors
BioMedBridges – Work Packages 2 & 12
MCnetITN3 Mid-Term Review
Country Report PNRI-Philippines
Presentation transcript:

M. Silari - ARDENT Kick-off meeting 1CERN, 8 May 2012 ARDENT implementation and execution M. Silari

M. Silari - ARDENT Kick-off meeting 2CERN, 8 May 2012 Links of research projects to WPs ESR number Individual Research project (title) Link with WPs Host Institution Fellow months ESR 1Development of compact neutron spectrometer1, 2, 4, 5, 6CERN36 ESR 2Dosimetry in mixed fields with Medipix and RP training2, 4, 5, 6CERN36 ESR 3Dosimetry in mixed fields with GEM and TEPC1, 4, 5, 6CERN36 ESR 4Medical applications of Si detectors2, 4, 5, 6CERN36 ESR 5Characterisation of TEPC for space and medical applications1, 4, 5, 6AIT36 ESR 6Development of nano dosimeter1, 4, 5, 6AIT36 ESR 7Development of radiation-hard radiation field monitor2, 4, 5, 6CTU36 ESR 8Development of Medipix-based educational tool2, 4, 5, 6CTU36 ESR 9Optimization of mixed-field data evaluation2, 4, 5, 6CTU36 ESR 10Development of detector system for medical Quality Assurance2, 4, 5, 6IBA36 ESR 11Mixed field dose determination with pixel detectors2, 4, 5, 6IBA36 ESR 12Development of Medipix-based radiation monitoring system2, 4, 5, 6Jablotron36 ESR 13Neutron dosimetry and spectrometry with CR-393, 4, 5, 6MI.AM36 ESR 14Solid state microdosimetry2, 4, 5, 6POLIMI36 ESR 15CR-39 and active detector for pulsed neutron fields1, 3, 4, 5, 6POLIMI36

M. Silari - ARDENT Kick-off meeting 3CERN, 8 May 2012 Secondments (CERN)

M. Silari - ARDENT Kick-off meeting 4CERN, 8 May 2012 Secondments (AIT)

M. Silari - ARDENT Kick-off meeting 5CERN, 8 May 2012 Secondments (CTU)

M. Silari - ARDENT Kick-off meeting 6CERN, 8 May 2012 Secondments (IBA)

M. Silari - ARDENT Kick-off meeting 7CERN, 8 May 2012 Secondments (Jablotron – MI.AM)

M. Silari - ARDENT Kick-off meeting 8CERN, 8 May 2012 Secondments (POLIMI)

M. Silari - ARDENT Kick-off meeting 9CERN, 8 May 2012 ESR career development plan Career Development Plan Pre-assessment (at the time of appointment) Personal Career Development Plan (PCDP) - Include PhD! Progress monitoring and evaluation (every 6 months) Towards the next employment

M. Silari - ARDENT Kick-off meeting 10CERN, 8 May 2012 Supervisory Board (SB) Technical Training Board (Leaders WP 1-4) Administrative support unit (CERN) Selection Committees Dissemination and Outreach Board (WP 6) Training Board (WP 5) ITN Management Office Scientist in Charge ARDENT Structure

M. Silari - ARDENT Kick-off meeting 11CERN, 8 May 2012 Meeting no. Tentative timing, i.e. after month X = end of a reporting period NatureComments 1After project month: 3 (April)Kick-offAll partners 2After project month: 4 (May)MO, TTB, TB, DOBIndividual meetings, webcast 3After project month: 6 (July)SB, MO, TTB, TB, DOBIndividual meetings 4After project month: 8 (September)MO, TTB, TB, DOBIndividual meetings, webcast 5After project month: 10 (November)SB, MO, TTB, TB, DOB Individual meetings during 1 st Workshop 6After project month: 12 (January)SB, MO, TTB, TB, DOBIndividual meetings, webcast Management meeting schedule First year SB = Supervisory Board, MO = ITN Management Office, TTB = Technical Training Board, TB = Training Board, DOB = Dissemination and Outreach Board

M. Silari - ARDENT Kick-off meeting 12CERN, 8 May 2012 Selected milestones WPN°MilestoneLead beneficiaryMonth WP7M1Kick-off meetingCERN4 WP6M2WEB page availabilityAIT3 WP7M3/8/13/14Annual SB meetingsCERN12/24/36/48 WP2M4Timepix based systemJablotron15 WP1M5Comparison of detector technologiesAIT18 WP1/2M6Choice of detector technologyCERN18 WP2M7Single wire interfaceCTU21 WP5M9Survey on formal trainingIBA26 WP2M10 Comparison of different data evaluation approaches CTU28 WP2M11Si microdosimeter characterisationPOLIMI28 WP3M12LET spectrometry with CR39POLIMI30 WP4M13Instrument intercomparisonCERN30

M. Silari - ARDENT Kick-off meeting 13CERN, 8 May 2012 Deliverables (first 24 months) WPN°DeliverableLead beneficiaryMonth 6D6.1ARDENT web site platformJablotron3 5D5.1-4Workshop and training coursesIBA10/22/34/46 6D6.2-5Educational materialJablotron10/22/34/46 7D7.1/3/5/7Annual SB meetingsCERN12/24/36/48 7D7.2/4/6/8Progress/periodic reportsCERN12/24/36/48 1D1.1Report on measurements (ESR5)AIT15 2D2.1Prototype of Timepix based system (ESR12) CTU 15 3D3.1Report 1 st pulsed field measurements (ESR15) POLIMI 15 2D2.2Report on first version of exercises (ESR8) CTU 18 6D6.6POLIMI 150 th anniversaryJablotron18 1D1.2Report 1 st prototype test measurements (ESR3) AIT 21 2D2.3Personal dosimeter prototype (ESR11)CTU21 2D2.4First prototype of single wire interface (ESR7) CTU 21 3D3.2Report on preliminary measurements in complex field (ESR13) POLIMI 21 2D2.5Reports on measurements (ESR2)CTU24 2D2.6Reports on measurements (ESR4)CTU24 3D3.3Intermediate report on feasibility study for nanodosimeter (ESR6) POLIMI 24 6D6.7Video documentaryJablotron24