Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Advertisements

18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
BoRit Superfund Site Timeline
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Rapid and Torch Rivers August 2013 ESLA. Issue: Increasing Sediment 1993 – Aarwood to Torch River.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Assessment of gravel transport characteristics of the upper Santa Ana River Scott Wright and Toby Minear USGS California Water Science Center Sacramento,
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
USBR Updates: Forecast and Modeling Changes CRFS Meeting Nov 8, 2011.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
Agenda Item 9 Sutter Bypass CVFPB Meeting April 17, 2009.
Klamath Watershed in Perspective A Review of Historical Hydrology of Major Features of the Klamath River Watershed and Evaluation of Hardy Iron Gate Flow.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Investigate Reservoir Sediment and Watershed Erosion Using GIS Tiao J. Chang and Travis D. Bayes Department of Civil Engineering Ohio University, Athens,
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Overview of Exercise Module 1 – Geologic Setting Module 2 – Flow Regimes Module 3 – Downstream Effects.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Kansas City Industrial Council Hydrology and Hydraulics
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
Assessing the feasibility of reestablishing ecosystem processes on the Mississippi River in the Twin Cities, Minnesota Christian Lenhart 1, John L. Nieber.
Federal Columbia River Power System Operations Planning.
The NHD and the Future of Stream Mapping in West Virginia Evan Fedorko West Virginia GIS Technical Center Jackie Strager Natural Resource.
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Update on the HEC-RAS Reservoir Transport Simulation Mike Langland and Ed Koerkle 03/30/2012.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Lower Susquehanna River Watershed Assessment Citizens Advisory Committee November 29, 2012 Anna Compton USACE 1.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Subcommittee on Hydrology/ACWI New Extreme Storm Work Group Status and Plans.
Baird Claytor Hydroelectric Project Sedimentation Study.
U.S. Department of the Interior U.S. Geological Survey Simulating Temperature Management under Climate Change at Detroit Lake, OR Norman Buccola, John.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment SedFlume.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Office Of Standards, Assessment, & Reporting Update David Abrams Assistant Commissioner For Standards, Assessment and Reporting S/CDN September 23, 2004.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Bighorn Long-Term Issues Group Where Are We Going?
Estimating the Volume of Fine-Grained Sediments Behind Four Low-Head Dams, Kalamazoo River, Michigan. In cooperation with the Michigan Department of Environmental.
A Sediment Budget for Two Reaches of Alameda Creek (1900s through 2006) Paul Bigelow, Sarah Pearce, Lester McKee, and Alicia Gilbreath.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
Abstract Man-made dams influence more than just the flow of water in a river. The build up of sediments and organic matter, increased residence times,
US Army Corps of Engineers BUILDING STRONG ® Corps of Engineers Omaha District Forecast Update Brian Twombly Kellie Bergman January 2010 Jay Lincoln.
SUBCOMMITTEE ON SEDIMENTATION Proposal to become a subgroup under the ACWI September 9, 2003.
US Army Corps of Engineers BUILDING STRONG ® Proposed Floodplain Inundation Mapping on the Flathead River Travis Ball Hydraulic Engineer
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
1 US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Pool 2 Channel Management Study.
Tom Buschatzke Director Arizona Department of Water Resources
Se-Yeun Lee1, Alan F. Hamlet 1,2, Carolyn J. Fitzgerald3, Stephen J
Quantifying Flow Reduction Benefit of the Miners Ravine Off-Channel Detention Basin Using HEC-HMS
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Red River Chloride Control Project
Presentation transcript:

Big Horn Lake Sediment Management Study

US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency Agreement Compare sediment management alternatives and provide future recommendations PM/Technical Lead –Reclamation – Stephanie Hellekson –COE – Dan Pridal

US Army Corps of Engineers Omaha District Scope Initial appraisal level of detail Focus on screening and alternative comparison Highlight constraints/issues/impacts of the sediment management challenge Technical focus – define what is technically feasible

US Army Corps of Engineers Omaha District Alternatives A) Higher pool level during recreation season B) Trap sediments upstream of Horseshoe Bend C) Flush sediment through Horseshoe Bend D) Manage sediment within Horseshoe Bend E) Manage sediments within the watershed (not part of this study) F) Dredging/Removal (evaluate previous)

US Army Corps of Engineers Omaha District Progress Update Completed items include background report review, site visit, alternative development, meetings/coordination Ongoing efforts on HEC-RAS model development for base and alternative conditions Some study delay, about 4 weeks

US Army Corps of Engineers Omaha District Schedule Kickoff Meeting – Jan 2008 Site Visit and Data Collection – May 2008 Initial model assembly – June 2008 (revised to September)60% Alternatives Analysis – August 2008 (revised to September) 90% Draft Report – October 2008 Study Complete – November 2008

Questions ?

Delta Formation Overview

Alternative A A) Higher pool levels during recreation season Change Yellowtail operation to alter pool level – examine past records with respect to pool level vs. sediment inflow Modifies deposition location, probably increase in southern end of reservoir, eventually worsen conditions at Horseshoe Bend Does not solve problem but may buy some time for Horseshoe Bend

US Army Corps of Engineers Omaha District Alternative B B) Trap sediments upstream of Horseshoe Bend Alter causeway east of Lovell to serve as impoundment Area is wide and shallow, more effective for coarse material than fine Trapped sediment could be removed if funds available Identify construction issues, policy issues, O&M

US Army Corps of Engineers Omaha District Alternative C C) Flush sediment through Horseshoe Bend Maintain lower pool level during high sediment runoff period to flush sediment past Horseshoe Bend Likely some deposition still occurs within Horseshoe Bend Does not solve sediment problem but spreads to entire project to buy time, long term impact may be detrimental and worse than without change Risk that pool may be impacted during lower runoff years, other similar impacts

US Army Corps of Engineers Omaha District Alternative D D) Manage sediment within Horseshoe Bend Implement local features to control and alter sediment deposition and transport through Horseshoe Bend May require berm construction to separate flowing river from recreation area Sediments move past Horseshoe Bend with minimal impact to recreation area Alternative is most independent of other actives, least impacted by hydrology Other alternatives may also require some implementation of local sediment management activities

Evaluation Method Collect available data Construct hydraulic model Verify model with existing conditions Modify model for alternative Evaluate and compare Basis for recommendations

US Army Corps of Engineers Omaha District Modeling Options Simple sediment transport for a cross section HEC-RAS / HEC-6 / GSTARS Hydraulic Models More complex models (2d and 3d) Model complexity and analysis limited Will select model consistent with alternatives and available data

US Army Corps of Engineers Omaha District Model Input Hydraulic Model Data Requirements –River/Reservoir Geometry Data –Roughness and Loss Coefficients –Bed Gradation Data for River and Reservoir Reaches –Upstream Inflow –Sediment Inflow and Gradation –Pool Level

US Army Corps of Engineers Omaha District Data Sources Reservoir rangeline surveys (numerous years) Sediment sampling USGS gage stations Other Agencies –Sediment data? –Historical topo data? –Aerial photos? –Previous Studies

Reclamation Range Line Location Horseshoe Bend Vicinity

D/S Horseshoe Bend Summer – Top of Joint Use 2000 Bighorn Lake Sed. Survey – Reclamation Sed. Group Safe Launch Elev at Horseshoe Bend

Lower Horseshoe Bend 2000 Bighorn Lake Sed. Survey – Reclamation Sed. Group Summer – Top of Joint Use Safe Launch Elev at Horseshoe Bend

Upper Horseshoe Bend 2000 Bighorn Lake Sed. Survey – Reclamation Sed. Group Summer – Top of Joint Use Safe Launch Elev at Horseshoe Bend

Example Delta Progression at Gavins Point Dam

US Army Corps of Engineers Omaha District Schedule Kickoff Meeting – Jan 2008 Site Visit and Data Collection – Spring 2008 Initial model assembly – June % Alternatives Analysis – August % Draft Report – October 2008 Study Complete – November 2008

US Army Corps of Engineers Omaha District Summary Compare Sediment Management Alternatives Initial assessment level of detail to screen and compare alternatives Provide technical report and recommendations