September 10, 20011 TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Effective Methods for Software and Systems Integration
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 25 June, 2002WFC3 Monthly Status Review1.
November 7, Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
PRR 568 – Settlement Timeline PRR 638 – Invoice Timeline PRR 599 – Mismatch Notification COPS January 2006 Updates.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
Cosmic Origins Spectrograph
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity June 11, 2015.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
October 1, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Recommendation of Texas Test Plan Team to RMS
I&T&C Organization Chart
HITSP Project 2007/2008 Work Plan and Schedule
How many ...?.
GLAST Large Area Telescope
13-block rotation schedule
2018/2019 School Calendar July August September October November
Due Dates subject to change. Watch for dashboard updates.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
PCS Day - Feedback 23th November 2016, Vienna.
XRN Feb 19 Minor Release - Status Update
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
STScI Ground System Development Status:
Integration & Test Instrument Operations Coordination
Teleconference ACS – FREIA 19th June 2017
GLAST Large Area Telescope:
PLAYMATES LEARNING CENTER CALENDAR
2012 Safety Group Advantage Program Timeline
Budget Planning Calendar
XRN 4927 – MiR Drop 4 - Status Update
TEL031 ODL Analytics Main Activities
Presentation transcript:

September 10, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level testing– Linda K, Robert, Gavin, Allison 2.Complete build & EEPROM install – Justin, Robert 3.Update HW/SW I/F Document – Chris This build completes code & unit test for the following 4 CSCs:, - CS DCE, CS DIB, CS MCE, DIB CSCI Chris Dorato 1.Sept 14 2.Sept 21 3.Sept 21 COS FSW Build 3.2 HW needs: nothing new FSW support to MEB testing takes no more than 1 week Complete code development: 1.Mechanisms part2 – Robert, Linda 2.Diagnostics – Linda 3.Start Target Acquisition - Robert 4.Complete code walkthrough 5.Complete unit level testing 6.Complete build & EEPROM install – Justin, Linda This build completes code & unit test for the following 2 CSCs: - Mechanisms & Lamps, Diagnostics Chris Dorato 1.Oct 12 2.Oct 26 3.TBD 4.Nov 9 5.Dec 31 6.Jan 4, 2002 HST Software & Operations Task/Action Status

September 10, TaskLeadDue Dates COS FSW Build 4 HW needs: nothing new 1.Complete code development 2.Complete code walkthrough 3.Complete unit level testing 4.Complete build & EEPROM install 5.Linkfile updates & general cleanup This build completes code & unit test for the last CSC: Target Acquisition Chris Dorato 1.Feb 15, Mar 1, Apr 3, Apr 5, Apr 30, 2002 HST Software & Operations Task/Action Status

September 10, TaskLeadDue Dates COS FSW Component Testing – Build Complete Memory Load & Copy – Steve 2.Complete CS DIB – Hugh 3.Complete NED – Adam 4.Complete Memory/Image Dump – Steve 5.Complete CS DCE – Adam, Gary Denise Miller 1.Aug 22 2.Nov 30 3.Oct 5 4.TBD 5.Oct 15 COS FSW Component Testing – Build Start Diagnostics – Denise 2.Complete Mechanism & Lamps – Tina 3.Complete CS MCE – Denise 4.Complete DIB CSCI – Hugh Denise Miller 1.Aug 22 2.Aug 21 3.Nov 30 4.Oct 5 COS FSW Component Testing – Build 4 1.Complete Buffer Memory Management – Steve 2.Start Diagnostics – Denise 3.Start Target Acquisition – Hugh 4.Start System Init & Service Functions – Steve Denise Miller 1.Aug 22 2.Aug 21 3.Nov 30 4.Oct 5 HST Software & Operations Task/Action Status

September 10, ComponentTest Plan & Peer Review Test Procedure & Peer Review I&T w/FSW & Dry Run Run for Record Memory Load & Copy (SP) CS DIB (HM) NED (AT) Memory/Image Dump (SP) CS DCE (AT, GW) Diagnostics (DM) Mechanisms & Lamps (TF) CS MCE (DM) DIB CSCI (HM) Target Acquisition (HM) System Init & Service Functions (SP) HST Software & Operations Task/Action Status FSW Bld 3.1 FSW Bld 3.2 FSW Bld 4

September 10, HST Software & Operations Task/Action Status Sept Oct Nov Dec Jan Feb Mar Apr May Jun July Aug Sept Mech & Lamp (Tina) COSWFC

September 10, TaskLeadDue Dates COS Non-Flight Software 1.Get the FUV detector simulator working – Dina, Allison - verify simulator responses for Door commands + 3 others - review all needed Ops changes w/Linda R 2.Mechanism test software ready for Aperture testing – Jeff 3.CM control for non-flight software – Justin Chris Dorato 1.August 29 2.November 1 3.August 31 COS MEB Functional Test 1.Mech Sim test and certify – Mike M 2.CEDER Training - Stephane 3.Test Set Equip. (Cables, LVPS loads, etc.) – Chuck Yanoski 4.FUV Detector Simulator ready – Dina, Allison 5.Test procedure development – Sue, Tina 6.Ops product development & database certification – Linda R 7.Flight Electronics Ready ************ - Virg 8.Flight database build complete – Chris B 9.Flight software build complete – Justin, Robert 10.Dry run test on SW/Ops Test Bench – Sue, Linda, Ken, Soraya 11.Test readiness review – Sue 12.Standalone backup – Adam 13.Rebuild flight software & database if necessary 14.Load Build 3.1x onto flight hardware – Justin, Robert, Soraya Sue Ross 1.Aug 28 2.Aug 24 3.Aug 29 4.Aug 29 5.Aug 29 6.Sept 7 7.Aug 24 8.Sept 20 9.Sept Oct 5 11.Oct 5 12.Oct 8 13.Oct Oct 10 HST Software & Operations Task/Action Status

September 10, HST Software & Operations Task/Action Status TaskLeadDue Dates COS FUV ETU HW/SW Integration Test 1.Receive ETU from Berkeley – Ken 2.FSW Bld 3.02 (CS DIB) load & checkout on bench – Chris D. 3.Generate test plan – Ken 4.Complete Test #2 with new DCE & CS DCE code 5.Update both benches with DCE code - Justin 6.Send image data to STScI – Ken Ken Brownsberger 1.Aug 15 2.Aug 13 3.Aug 17 4.Aug 24 5.Sept 3 6.Sept 3 COS OSM2 I/F Test AI: GB – resolve schedule/resource conflict AI: TF – contact cleanroom people for flow bench certification AI: TF – coordinate w/Chuck Y. on cable needs HW needs: Ops test bench w/ new mech sim, Flow bench, OSM2, cable, scope (in cal) w/prob 1.OSM2 available for test (binding problem) 2.Complete test procedure and conduct peer review – Tina, Jeff 3.FSW Build 3.1 image ready – Chris D. 4.Dry run procedure 5.Run test bench certification procedure – Tina, Jeff 6.Test Readiness Review – Tina, Jeff 7.Perform test – Tina, Jeff Tina Fredo 1.Sept 20 2.Sept 7 3.Sept 21 4.Sept 24 5.Sept 27 6.Oct 1 7.Oct 1

September 10, HST Software & Operations Task/Action Status TaskLeadDue Dates COS Software & Mechanism I/F Testing 1.OSM1 – Tina, Jeff 2.Aperture – Tina, Jeff Tina Fredo 1.October 26 2.November 22 COS Documentation 1.DM-01 SI Commands List – Chris B 2.DM-02 Engineering Data List – Chris B 3.DM-03 FSW Everything Document – Chris D - Update requirements, hold CCB & re-release 4.DM-04 GSE Software – Dina 5.DM-05 Command Definition – Linda R 6.DM-06 Science Data Format – Linda K 7.DM-08 FSW Test Procedure – Denise 8.DM-14 Telemetry Calibration List – Chris B 9.OP-04 Constraints And Restrictions Document (CARD) – Hugh 10.OP-04 Operations Limitations Document (OLD) – Hugh Grant Blue 1.Sept Sept Sept 2002 Sept Sept Oct 31, Sept Dec. 15, Sept TBD 10.TBD SI Delivery Date: Sept 29, 2002

September 10, COS Action Item List 1.GB – Remind Electronics group that the Test Bench MEB must stay current with the flight MEB ** COMPLETE ** 2.GB – Get Mike Malone to update both COS Mechanism simulators. 3.JS – Learn how to modify the Mechanism simulator for future changes 4.GB – Update the plan for COS component test activities. HST Software & Operations Task/Action Status

September 10, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Flight Software Build 2.1 (finish on WFC3 Test Bench) HW needs: MEB CS (in place) 1.Execute performance testing on Operate code 2.Complete unit test documentation 3.Operate 2.1 Build, EEPROM load & verification 4.Database build & SITS install – Mike This build completes code & unit test for the following 7 CSCs: - Command, Telemetry, Error, Limits, - Memory/Image Dump, Memory Load & Copy, - Buffer Memory Management Chris Dorato 1.Aug 29 2.Aug 31 3.Aug 31 4.Aug 31 BOOT Code Development & Test HW needs: MEB CS (in place), SES1 (10/29) 1.Complete code walkthrough – Dominic 2.Complete I&T on test bench – Dominic 3.Burn PROM, install on benches and verify– Dominic, Jason This effort completes code & unit test for the BOOT CSC Chris Dorato 1.Oct 15 2.Nov 12 3.Nov 16

September 10, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Flight Software Build 2.2 HW needs: SES2 (10/19), SES3 (9/14), SES4(9/7), MecSim1 (10/1) 1.Complete code development: - Mechanisms (SOFA, Shutter, Correctors) – TBD, TBD - Service Functions - TBD 2.Complete code walkthrough – Jason, Dominic 3.Complete unit level testing – J, D, G 4.Complete build & EEPROM install – Gavin, Jason, Dominic This build completes code & unit test for the Service Functions CSC Chris Dorato 1.Oct 1 2.Oct 15 3.Nov 15 4.Nov 17 WFC3 Flight Software Build 2.3 HW needs: SES1 (10/29), SES2 (10/19), MecSim2 (11/15) 1.Complete code development: - Mechanisms (CSM, IR, FSM, Lamps) – TBD - NED – TBD - Diagnostics - TBD 2.Complete code walkthrough – J, D, G 3.Complete unit level testing – J, D, G 4.Complete build & EEPROM install – Gavin, Jason, Dominic This build completes code & unit test for the following 3 CSCs: - Mechanisms & Lamps, NED, Diagnostics Chris Dorato 1.Nov 30 2.Dec 15 3.Jan 15, Jan 17, 2002

September 10, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Flight Software Build 3 HW needs: complete test bench (December) GSE SW needs: Detector Simulator, Science Data Generator 1.Complete code development: - UVIS Detector (BOE: ACS MCE/MIE) – TBD - IR Detector – TBD 2.Complete code walkthrough – J, D, G 3.Complete unit level testing – J, D, G 4.Complete build & EEPROM install – Gavin, Jason, Dominic This build completes code & unit test for the last CSCs: - UVIS Detector, IR Detector Chris Dorato 1.Dec 31 2.Jan 15, Mar 15, Mar 30, 2002 IR: 100 days Start: 11/1/01 BOE: ACS MCE & MIE UVIS: 40 days

September 10, ComponentTest Plan & Peer Review Test Procedure & Peer Review I&T w/FSW & Dry Run Run for Record Command August 22 Steve & Chris Telemetry August 22 Steve & Chris Error November 30 Hugh & Jeff Limits November 30 Hugh & Jeff Memory/Image Dump November 30 Hugh & Jeff Memory Load & Copy November 30 Hugh & Jeff Buffer Memory Mgt October 5 Adam & TBD Boot October 5 Adam & TBD HST Software & Operations Task/Action Status FSW Bld 2.1

September 10, ComponentTest Plan & CCL Development Peer ReviewProcedure Testing Run for Record Service Functions August 22 Steve & Chris NED August 22 Steve & Chris Diagnostics November 30 Hugh & Jeff Mechanisms & Lamps October 5 Adam & TBD IR Detector TBD Steve UVIS Detector October 15 Gary & Allison HST Software & Operations Task/Action Status FSW Bld 2.3 FSW Bld 4 FSW Bld 2.2

September 10, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 FSW Component Test – Build Start Telemetry – Adam 2.Start Buffer Memory Management – Gary 3.Start Limit Checking – Denise 4.Start Memory/Image Dump – Steve 5.Complete Command – Todd, Denise 6.Complete Memory Load & Copy – Steve 7.Complete Telemetry – Adam 8.Complete Buffer Memory Management – Gary 9.Complete Limit Checking – Denise 10.Complete Error Handling – Gary 11.Complete Memory/Image Dump – Steve Denise Miller 1.TBD 2.TBD 3.TBD 4.TBD 5.October 6.October 7.October 8.October 9.October 10.October 11.October WFC3 FSW Component Test – Boot 1.Complete Boot – Denise, Todd Denise Miller 1.Dec 15

September 10, HST Software & Operations Task/Action Status TaskLeadDates WFC3 FSW Component Test – Build Start Mechanisms & Lamps (Part 1) – Gary 2.Start Sys Init & Service Functions – Adam, Steve 3.Complete Mechanisms & Lamps (Part 1) – Gary 4.Complete Sys Init & Service Functions – Adam, Steve Denise Miller 1.TBD 2.TBD 3.January 4.January WFC3 FSW Component Test – Build Start NED – Adam 2.Start Diagnostics – Denise 3.Start Mechanisms & Lamps (Part 2) – Gary 4.Complete NED – Adam 5.Complete Diagnostics – Denise 6.Complete Mechanisms & Lamps (Part 2) – Gary Denise Miller 1.December 2.December 3.December 4.February 5.February 6.March WFC3 FSW Component Test – Build 3 1.Start IR Detector – Gary 2.Start UVIS Detector – Steve 3.Complete IR Detector – Gary 4.Complete UVIS Detector – Steve Denise Miller 1.TBD 2.TBD 3.September 4.September

September 10, TaskLeadDue Dates WFC3 Non-Flight Software 1.MEB sim CEB/DEB cmds (MEB Com board testing w/ Proto) 2.UVIS & IR Detector Sim (runs on PC in SW Test Bench) - supports HW Detector Simulator & FSW testing 3.MEB sim UVIS & IR image cmd & data capture - supports HW Detector Simulator testing using Proto 4.UVIS/IR Science Data Generator - supports FSW testing 5.Det Sim HW checkout with SES1 board (Proto sw update) 6.[DEB/CEB] Test Controller (MEB sim) – Dina - need direction from I&T to start (Mark B: “Hold off”) 7.Mech test software: UVIS Corrector – Jeff 8.Mech test software: IR Filter Wheel – Jeff 9.Mech test software: Channel Select – Jeff 10.Mech test software: UVIS Shutter – Jeff 11.Mech test software: IR Corrector – Jeff Chris Dorato 1.Aug 31 2.Sept 21 3.Sept 21 4.Dec 1 5.TBD 6.Sept 13 7.Oct 17 8.Oct 19 9.Nov Oct Oct 17 HST Software & Operations Task/Action Status Dates driven by Mech hw & test set development Current date: Oct 17

September 10, HST Software & Operations Task/Action Status TaskLeadDue Dates WFC3 Documentation 1.DM-01 SI Commands List (IR: 3/27/01) – Mike 2.DM-02 Engineering Data List – Mike 3.DM-03 FSW Design Document – Chris D 4.DM-04 GSE Software – Dina 5.DM-05 Command Definition (IR: 5/17/01) – Mike 6.DM-06 Science Data Format (IR SER: 6/29/01) – Mike 7.DM-08 FSW Test Procedure – Denise 8.DM-14 Telemetry Calibration List – Mike 9.OP-04 Constraints & Restrictions Doc (CARD) – Tim, Todd 10.OP-04 Operations Limitations Document (OLD) – Tim, Todd Grant Blue 1.Aug 15, Sept 10, Aug 29, Aug 15, Sept 30, Oct 15, TBD 8.Nov 30, TBD 10.TBD SI Delivery Date: Aug 15, 2002

September 10, TaskLeadDue Dates Schedules 1.Update Master Schedule – Grant Grant Blue 1.Aug 24 COS/WFC3 Transition Plan 1.COS/WFC3 Transition Plan: Generate Initial Release 2.STScI Memo of Understanding (COS images) Grant Blue 1.Aug 31 2.Aug 31 WFC3 Descope List: Need 6 ideas for each IPT - Cost: Low $1M High - Schedule: Low 25 days High 1.Send data to Mike Davis Grant Blue 1.Aug 30 HST Software & Operations Task/Action Status

September 10, WFC3 Action Item List 1.GB – Resolve date conflict: Build 2.3 and GB/JP replan the Mechanism test schedule 3.GB present COS/WFC3 Risk list at next staff meeting ( ) 4.GB define date for DM-08 & OP-04 HST Software & Operations Task/Action Status