GLOBALink/VHF Digital Link Mode 2

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Introduction to Aeronautical Data Links
U.S. Plans for ADS-B Briefing for
An Airline Perspective on the implementation of new systems SEMINAR ON THE IMPLEMENTATION OF DATALINK AND SATCOM COMMUNICATIONS Bangkok Thailand,
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
Status of the ICAO Universal Safety Oversight Audit Programme Audits completed 179 * Interim reports178 Action plans173 Summary reports169 Audit follow-ups52.
GLOBALink/HF Data Link
ATS DATALINK CENTRAL REPORTING AGENCY ACTIVITIES
ACARS & VDL Mode AVICOM Japan
International Civil Aviation Organization
A 1 GLOBALink/HF Data Link ink SM GLOBAL Program Update Prepared For: ICAO WG-M December 2000 AMCPWGM1- WP20.
Voice and Data Operations in the North Atlantic
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
GLOBALink (HFDL and SATCOM)
United States of America (USA) Plans for ADS-B Briefing for Seminar on Implementation of Data Link and SATCOM Communications November 2003 Bangkok,
Presentation by K. P. Rimal, Regional Officer of the ICAO ASIA-PACIFIC Office to the Seminar on implementation of data link and SATCOM Communications in.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
Phillipe Renaud and Nikos Fistas
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
0 - 0.
Addition Facts
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
ATN2002 IEE, London Providing Communications Services to Support ATC Applications Akhil Sharma Senior Manager AIRCOM Service Development.
By: Tony Diana, Date: September 19, 2005 File: apo130\ASPMDocs\ASPM Presentation 05.ppt Federal Aviation Administration Presentation of the.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
GateFusion Wireless Content Delivery
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Military Use of Data Link Phil Platt ATN2001, IEE, London
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN/VDL Mode 2 Implementation Status
ATN Subnetwork Implementation:
ARINC PETAL IIe VDL Mode 2, ATN …and beyond
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
ATN September 2001 American Airlines Data Link... Frank Cheshire / Andy Fry.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Making VDL Mode 4 a Reality Bengt Moberg C.N.S. Systems AB ATN 2002 September 25th, 2002.
ATN2003 IEE, London CNS Infrastructure Partnerships Akhil Sharma Senior Manager AIRCOM Service Development.
GLOBALink/HF Data Link
Workshop on preparations for ANConf/12 − ASBU methodology
AERONAUTICAL COMMUNICATIONS PANEL (ACP)   SEVENTEENTH MEETING OF THE WORKING GROUP M   Bangkok, Thailand 31 January – 1 February 2011 INFORMATION PAPER.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ATN/VDL Mode 2 Implementation Status
ATN Subnetwork Implementation:
Presentation transcript:

GLOBALink/VHF Digital Link Mode 2 ICAO Seminar on Implementation of Data Link and SATCOM Communications Bangkok, Thailand 17-19 November 2003 Vic Nagowski of ARINC Industry Activities presenter ARINC Industry Activities is responsible for the development of avionics standards for the aeronautical community Material being presented provided by the ARINC Aviation and Air Traffic Division who is responsible for all ARINC air/ground voice and data link services Copyright © 2003 ARINC Incorporated, 2551 Riva Road, Annapolis, Maryland, 21401. All rights reserved. No part of this publication may be reproduced without written permission of the publisher.

GLOBALink Services Overview Airline Host System Satcom ARINC Ground Network (AviNet®) Aviation Communication Services HFDL FAA/CAA Tower Systems ARINC Central Processing System (CPS) High level picture of the services offered by ARINC under the GLOBALink name This presentation will be providing the status of the ARINC VHF Digital Link Mode 2 (VDLM2) services ACARS/AOA VHF Air Traffic Service Provider ATN Air/Ground Router

ARINC Status of VDLM2 Services Two VDLM2 Services Offered AOA: ACARS Over AVLC (Aviation VHF Link Control) Operational November 2000 ATN: Aeronautical Telecommunication Network Supports Controller Pilot Data Link Communications (CPDLC) Operational September 2002 ARINC Providing VDLM2 Products/Service Globally North America AOA ATN-FAA CPDLC Build 1 Program Europe ATN-EUROCONTROL Link 2000+ Asia AOA -AVICOM (Japan) 2 VDLM2 services are being offered AOA supporting legacy ACARS applications ATN supporting CPDLC SAS support in Europe

ACARS Technology Limitations ACARS has 2.4 kbps air-to-ground data link Current traffic reaching capacity of available frequencies at busiest airports Limits data link speed and volume Data link growth continues regardless of economy Cannot continue to meet airlines demand New applications are data intensive New aircraft are data intensive ACARS Lack of frequencies to support ACARS Performance limited due to a/g data link speed and protocol Airlines/CAAs continuing to use data link for more applications New aircraft are more data intensive

VDLM2 VDLM2 has 31.5 kbps air-to-ground data link >10X the throughput and speed of ACARS Enables data intensive applications Complies with ICAO SARPS for worldwide harmonization Eliminates radio frequency congestion Designed to meet demanding requirements of Air Traffic Services (ATS) communications Scalable system Expandable with demand Easily integrated with existing data link systems 10X due to higher air/ground speed and improved protocol Bit-oriented protocol vs. character-oriented (ACARS) Designed to meet more stringent ATC requirements (latency and availability) which results in better AOC performance Modular system growth to support future requirements

ARINC VDLM2 Coverage for CPDLC Build 1 AOA & ATN Service 13 Stations; fully redundant system; 24/7 ops CPDLC – Controller-Pilot Data Link Communications 13 ground stations operational today Operational since September 2002 Unprecedented operational availability being achieved Integrated into ARINC’s GLOBALink Service

Airlines / Operators Will Benefit from ARINC’s Operational VDLM2/ATN Service American Airlines Continental Airlines Delta Air Lines Federal Express US Air Force AAL – 26 aircraft CAL – 4 ac (certified but not operational) DAL – 4 ac planned FEX – 8 ac planned USAF - 1 ac

ARINC’s VDLM2/ATN Service Today ARINC won EUROCONTROL’s competition to be their LINK 2000+ ATN/CPDLC Service Provider Where: Maastricht UAC When: Fall 2003 through 2007 LINK 2000+ ARINC won Eurocontrol competition for LINK 2000+ Maastricht Upper Airspace Center ARINC system deployed in October 2003, actual operation is pending certification flights AAL scheduling cert flights SAS operational scheduled for February 2004 13 ground stations - 9 ground stations support LINK 2000+ - 3 ground stations support Airbus certification Eurocontrol has plans to mandate VDLM2/ATN in 2009 for forward fit aircraft and allow 5 additional years for retrofit aircraft

ARINC VDLM2 in Europe 2003 Coverage for: Link 2000+ CPDLC AOA & ATN Service ATN coverage AOA current coverage and planned coverage (5 year plan) Planned Coverage for: AOA Service

Airlines/Operators to Benefit from ARINC’s Operational VDLM2/ATN Service SAS Lufthansa ATI American Airlines Others expected to announce their participation shortly Eurocontrol offering incentives to airlines to join the CPDLC program - Assistance with avionics procurement - Reduced over flight fees

ARINC Provides Turnkey AOA / VDLM2 System to AVICOM Narita (NRT) - 1 Haneda (HND) - 3 Kansai (KIX) - 2 Kagoshima (KOJ) - 8 Fukuoka (FUK) - 9 Nigata (KIJ) - 7 Chitose (CTS) - 4 Kushiro (KUH) - 5 Sendai (SDJ) - 6 Naha/Okinawa (OKA) - 10 AVICOM service operational Sept 2003 AVICOM Japan has procured VDLM2 AOA system from ARINC 2 ground stations operational Purchased 10 ground stations in initial procurement More details on this system to be provided later by Matsuzaki san of AVICOM

VDLM2 Available and Planned Coverage 148 ground stations operational to date Expect 160 by end of 2003

Performance of VDLM2 AOA ATN 50 aircraft regularly using service Expect 100 aircraft by end of year 147 VDLM2 stations operational 160+ VDLM2 stations planned by EOY 2003 >100,000 messages monthly >99% Uplink success rate Response time (round trip) Average 1.35 seconds ATN 30+ Aircraft using service 13 stations operational ~10,000 CPDLC messages monthly ARINC service availability 99.999% - Domestic 99.86% - Caribbean Here are the some of the performance parameters Performance parameters are better than ACARS performance Latency measurements better than expected and meeting ATC requirements Southwest airlines is starting to equip with VDLM2 avionics and should have entire fleet equipped by EOY 2004 - ARINC estimates 500 aircraft total using system by EOY 2004

AOA VHF Traffic AOA VHF Traffic # COMMUNICATING AIRCRAFT AOA VHF Traffic Number of Aircraft This graph provides the AOA traffic uplink and downlink data by month Downlinks are normally 2/3 of the traffic while uplink messages are longer in length It also provides the number of aircraft using the system per month

VDLM 2 Summary VDLM2 AOA and ATN networks are operational VDLM2 avionics for AOA and ATN are available ATN service is operational for CPDLC in Miami ARTCC over ARINC VDLM2 ATN European service for CPDLC operational by EOY 2003 VDLM2 is achieving promised performance ARINC ATN router product available to support air/ground and ground/ground implementations CNS/ATM Regional Implementation Seminar sponsored by Aerothai/ASA/ARINC in March 2004

Summary (cont.) For questions or additional information please contact: Dan Pendergast Director, GLOBALink Services dpenderg@arinc.com 410 266-2267 For addition information on the ARINC VDLM2 system please contact