J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.

Slides:



Advertisements
Similar presentations
Results of dosimeter readings in IR3 and IR7 DGS-RP High Level Dosimetry LHC Collimation WG meeting 03/09/2012.
Advertisements

Radiation Calendar first half 2009 (1): PSI60 MeV p March BLM electronics Automation equipment Interlocks (DRAFT description of the results in.
CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
Beam Position Monitors: Front-End Components - BPM Acquisition Architecture - Components Selection - Irradiation Tests MOPOS Radiation Tests - JL Gonzalez.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
TECHNICAL INSTALLATION RADWG - 2 APRIL /03/20091J.Lendaro EN/STI/ECE.
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
LHC Emergency Lighting jm FORAY EN/EL/BT Initial project : The current LHC emergency lighting system was designed and installed at the time of the LEP.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
CERN IT Department CH-1211 Genève 23 Switzerland t HP ProCurve 2910 Ethernet switch in CNRAD April-June 2012 RadWG Meeting Gyorgy.
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
HF FE Radiation tests at the CHARM facility Tullio Grassi 4 June 2015 Documentation on:
Spanggaard BE-BI(1)RadWG Meeting 6/ Multi-Wire Proportional Chamber and Gas Electron Multiplier Electronics in TT83 Radiation issues.
ALICE setup: update on the installation 18/10/2010 Angela Intermite.
Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT 1 Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls.
LHC Electronics irradiation tests in the CNGS side gallery September 2009 – partial results D.Kramer for the RADWG 30/9/09report to LMC Thanks to B.Todd,
CNRAD – Results CV Helmut Jena EN/CV 03/05/2010. Schneider- Télémecanique Siemens S7-315DP Siemens S7-200 CV Testplatform.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
H4IRRAD 2012 M. Calviani (EN/STI) for H4IRRAD team.
LHCf collaboration meeting, Nagoya, January 2009A. L. Perrot LHC news A. L. Perrot CERN, EN/MEF-LE LHCf collaboration meeting, Catania, 6 th July 2009.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
(1/16) 08/05/12 – RadWG meeting G. Spiezia, P. Peronnard, E. Lefteris, P. Oser, J. Mekki PSI tests - Comparator Results Devices under test and beam conditions.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
How to access CNGS Heinz Vincke for DG-SCR-SL RADWG3/4/
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Matters arising RADWG - 3 July 2009
DerivFIP – Radiation test
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
CHARM facility update 23/04/2015
Integrating part of the ATLAS Radiation Monitor will measure
Project lead by Fusion For Energy (F4E)
System layout in PS ring and possible evolution
Distributed Optical Fibre Radiation and Temperature Sensing at High Energy Accelerators and Experiments Update on installation of DOFRS in PS-Booster.
SPS dose forecast for foreseen safety installations
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
Injectors BLM system: PS Ring installation at EYETS
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
Dosimeters installation during the EYETS 28/03/17
CNRAD dosimetry and Summary of the TS
Compact readout unit for the EP-RADMON radiation monitoring sensors
WP02 PRR: Master Oscillator and RF Reference Distribution
Dose levels at the SPS, monitoring and calculation.
INRNE - Sofia AIDA - 1 RADIATION SENSORS for Integrated Dose for GIF++
Euromedim proposal (Applying HEP methods in medical imaging)
Radiation Monitoring in LHC Experiments
Main objective : Evaluate a new solution to replace SOX +DUC 18W safety lighting (env 2000 units). End of production in Developed a test bench.
Status of muon monitor R&D and construction
RADIATION induced failures in LHC 28th June 2011
Front End Driver (FED) Crates and Racks +Tracker PSU racks
500 nm WRITE VOLTAGE 0 V.
MICROFIP-Do we need further tests? 28th June 2011
RADWG Meeting February 2017
Radiation Working Group RADWG
Presentation transcript:

J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with beam started on the 15 th of March (so today !) End of beam foreseen on the 21 st of November. Next access will be between the 29 th and the 31 st of March (to be defined)

J. MEKKI (2/6) 15/03/11 – RadWG meeting CNRAD installation summary BLM detectors Station1: 3 CB50 for high voltages 2 optical fibers 1 CB50 for Remote Reset TE/EPC Station1: 1 NE48 (only for 1 st Slot?) Lanbda or Astec ? DerivFIP Station2: 1 Profibus used as a FIP Station3: 1 NE48 LED warning signs Station3: 1 NE48 Station4: 1 Ethernet connection for Webcam 1 CB50 for remote reset of the webcam Camera located below Station4 where the radiation field should be low enough to avoid radiation damage

J. MEKKI (3/6) 15/03/11 – RadWG meeting CNRAD installation summary BLM detectors Station1: 3 CB50 for high voltages 2 optical fibers 1 CB50 for Remote Reset TE/EPC Station1: 1 NE48 (only for 1 st Slot?) DerivFIP Station2: 1 Profibus used as a FIP Station3: 1 NE48 LED warning signs Station3: 1 NE48 Station4: 1 Ethernet connection for Webcam 1 CB50 for remote reset of the webcam Camera located below Station4 where the radiation field should be low enough to avoid radiation damage Cryo (Fip based) Station2: 1 NE48 Station3: WorldFIP PCI 1 MHz Next access between 29 th and 31 st of March Next Slot: 1 NE48 (setup for IGBTs ?)

J. MEKKI (4/6) 15/03/11 – RadWG meeting CNRAD installation summary Monitoring of the PMI chamber positions for comparison with RadFETs: RP placed dosimeters (RPL, Alanine, ECBs) Close to old position 452, on the wall RM11 box 5V Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 380 Gy (15 Gy < TID < 60 Gy) per Slot RM11 Dep (100 nm + 400nm) PMI 407 PMI 406 In the target area Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 26.5 kGy (1 kGy < TID < 5 kGy) per Slot RM10 Dep (100 nm + 400nm) PMI401: At the junction chamber in the target Area. Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 175 Gy Off-line Measurement 2 RadFETs ( nm) PMI403: Between TSG42 and TSG43 in the target Area Dose expected at the end of 2011 (Considering 1.5e18 pot/week) 15 kGy Off-line Measurement 2 RadFETs (100 nm)

J. MEKKI (5/6) 15/03/11 – RadWG meeting CNRAD installation summary RM7 dep BLM position Facing TSG45 400nm + 100nm RM9 box (5V) Below DerivFIP module Facing TSG45 400nm + 100nm Position of the RadMONs during the 1 st Slot RM10 box (5V) To recalibrate the position Facing TSG45 (45°) PMI 406 PMI 407 RM10 dep 400nm + 100nm RM11 box (5V) RM11 dep Facing TSG45 400nm + 100nm RM8 box (3V) Facing TSG45 (90°) 1000nm Close to the camera RM8 dep LED position 400nm RM7 box (3V) Facing TSG45 (90°) 1000nm in short circuit To be read at the end of each slot

J. MEKKI (6/6) 15/03/11 – RadWG meeting CNRAD installation summary RadWG website has been updated for 2011 (see CNRAD tag) New webpage for summarising the ongoing tests including links to reports if they exist ! CNRAD data interface is under maintenance Questions: What is the pressure of the ≠ BLM chambers ? Possibility to have online values of the BLM chambers during irradiations ? TE/EPC → 4 AC/DC to be tested (Lanbda or Astec ?) → Only 1 for the 1 st slot → Planned to stay only one slot ? Next slot Setup for the IGBTs (TE/EPC) ? Cryo should be ready.