Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager

Slides:



Advertisements
Similar presentations
Role , Responsibility and achievements of SARI 145 Working Group
Advertisements

Global Aviation Safety Plan
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
JARUS A harmonized approach to UAS rulemaking. What is JARUS? JARUS is the Joint Authorities for Rulemaking on Unmanned Systems The group aims at drafting.
Unmanned Aircraft Systems EUROCONTROL ATM Integration
Federal Aviation Administration Required Communication Performance (RCP) Date:26-30 March 2007 Presented to:ICAO Worldwide Symposium on Performance of.
Overview of the interoperability Regulation
U.S. Plans for ADS-B Briefing for
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
ESA Iris Programme: status
EUROCAE WG82: Airport Data Link System ACP WGW3 IP 8 Montreal, January 2010.
PKI Trust Root Concepts ACP Working Group – I April 2009.
LINK2000+ Status Søren Dissing
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
1 INAC First Nation Education Policy Framework Regional Dialogues Coordinated by AFN and INAC Education Policy Framework - Joint Steering Committee (EPF-JSC)
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
ICH Q4B Regulatory Acceptance of Analytical Procedures and/or Acceptance Criteria (RAAPAC) Overview and Update Robert H. King, Sr. Office of Pharmaceutical.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,
24 Sept '02Page 1 FANS-1/A Accommodation in an ATN Environment.
Doc.: IEEE /1542r0 Submission Vertical Applications Technical Advisory Group Smart Grid Task Group Liaison Report Date: Slide.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
1 Global Aviation Safety Plan Capt. Len Cormier. 2 Global Aviation Safety Plan  The first edition of GASP was issued in 1997  GASP was used to guide.
SAFETY REGULATION COMMISSION SAFETY REGULATION COMMISSION Harmonisation of ATM Safety Regulation & ESARRs SAFETY REGULATION COMMISSION SAFETY REGULATION.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
25/11/2015 ITU-T NGN - Progress and Plans Brian Moore Lucent Technologies Chairman of ITU-T Study Group 13 1GSC-9, Seoul SOURCE:ITU-T TITLE:ITU-T NGN -
Tokyo 10/11/2004 ATSEP training & license: the way forward.
Workshop on How to Publish Data in VO ESAC, June 25-June Tips & tricks by the Ivoa Document Coordinator Bruno Rino
1 WG-MISD Release of Radioactive Material (RRM) Work Stream Colin Hord, UK CAA Nigel Gait UK Met Office.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
Standards Development Proposal A Suite of Framework Standards FGDC Coordination Group October 2, 2001 John Moeller.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
AIS-AIMG/1-SN No.6. 19/11/08 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)
AIS-AIMG/1-SN No.6.
Required Communication Performance (RCP)
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
WG-MISD Release of Radioactive Material (RRM) Work Stream
Overview of Documents for Third Earth Observation Summit
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
Joint IPR/DAI Workshop
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
FSMP/ 1 Report Presentation to the ANC
International Civil Aviation Organization
DG Environment, Unit D.2 Marine Environment and Water Industry
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
Chemical Monitoring mandate
Projects related to PA 10 Overview
Draft Mandate and Proposed Approach for the Drafting Group on
P AIRPORT SURFACE DATALINK
WG GES: Decision review progress
Reporting and Water Information System for Europe (WISE)
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Strategic Coordination Group
Projects related to PA 10 Overview
ICAO ACP Working Group M Iridium Sub Group Overview
Common Implementation Strategy for the
ICAO AIRM briefing for the AIXM CCB Scott WILSON
Presentation transcript:

Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager

Contents Data Link Convergence ProblemSolution StrategyGroupsIssues ADS-C

The Problem Convergence Problem EUR Data Link Mandate NAT Data Link Mandate Current Trials and Implementation Aircraft?

Step 3 Converged Single System Step 2 ATN Accomodation Step 1 FANS-1/A Accomodation Solution : 3 Step Strategy

ICAO Groups ICAO Convergence Groups DLSG ADG NAT FIG

EUR/NAT Data Link Steering Group DLSG ICAO DLSG created Under ICAO EUR/NAT Office Wide representation (UK, FR, PT, US, IS, Airbus, Boeing,…) Tasked to develop a harmonised data link service First meeting March 2005 Workshop Action Plan: Consistent with 3 steps strategy Second meeting October 2005 Creation of the ATN accommodation Drafting Group Work on future systems (Step 3)

ATN accommodation Drafting Group ADG Purpose: to study the accommodation of ATN aircraft (i.e. ED110A compliant) in the FANS-1/A environment Tasks To agree a list of technical and operational issues which could prevent accommodation of ATN aircraft in FANS-1/A airspace, and develop a set of potential resolutions to those issues. To develop a specification for a trial in a FANS-1/A environment (e.g. NAT) in order to validate the potential resolutions identified in the previous task. Develop a draft interoperability specification for the accommodation of ATN aircraft in FANS-1/A airspace for input into RTCA SC189/Eurocae WG53.

ADG Progress First Meeting April 2006 IRRF Approach Accepted Main Outcome: Identification of all known issues that could potentially prevent an ATS Provider from accommodating ATN equipped aircraft Second meeting June 2006 Main outcome: Formulation of potential resolutions to the issues identified Several issues identified to be reported to the DLSG

ADS-C Application Issue Current ADS-C SARPs version Meets most requirements but has shortcomings Airlines do not support it Improvement proposals available ADG Proposed Solution Improve ADS-C application if it is done by June 2007 Working Arrangements to be defined and accepted by DLSG ACP Coordination key element

Proposed ACP coordination Chairman of SG-N2 of the ACP WG-W joins the ADG. ADG material fed back to ACP for approval.

ADG Statement The ADG supports the publication of the ADS-C SARPS in their current from at this moment.

Thank You