NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Overview of the interoperability Regulation
U.S. Plans for ADS-B Briefing for
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
Next Generation Air/Ground Communications (NEXCOM)
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
Joint FAA/Eurocontrol Future Communications Study (FCS)
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
ACP WG B Work Program Frequency Planning Criteria
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
Data Communications Program
GLOBALink/VHF Digital Link Mode 2
SATELLITE DATA LINK SYSTEM (SDLS)
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
1 Global Satellite CNS Program. 2 Background/status –Supplemental FY 2002 appropriation provided funding to explore secure global satellite CNS for air.
Future Communications Roadmap
1 BNSC 3 Programme Aviation use of Broadband Satcom Paul Ravenhill Helios Technology.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
15. Oktober Oktober Oktober 2012.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
We are learning how to read the 24 hour clock
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
ATN Subnetwork Implementation:
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Next Generation Air/Ground Communications (NEXCOM) Program Presented to Airborne Internet Collaboration Group Reston VA April 17, 2003 Dieter Thigpen Integrated.
Data Link Communications
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
Presented to: By: Date: Federal Aviation Administration Friends and Partners in Aviation Weather Michele Merkle, Federal Aviation Administration Director.
Presented By: Peter Muraca FAA Technical Center Atlantic City, NJ USA
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
International Civil Aviation Organization
NEXCOM Next Generation Air/Ground Communications Appendix G
NEXCOM by Bruce Eckstein FAA.
NEXCOM by Bruce Eckstein FAA.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
ATN Subnetwork Implementation:
Joint FAA/Eurocontrol Future Communications Study (FCS)
Presentation transcript:

NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground Communications Product Team Lead Federal Aviation Administration

2 NEXCOM Acquisition Program Elements Multimode Digital Radio Analog & digital Ground System System Demo Program NEXCOM architecture & commercial avionics Digital capability for voice and data VHF T/R RIU GNI Avionics Analog & digital

3 NEXCOM Schedule System Demo Program 10/03 System Demo II 10/04 Operational Demo 10/02 System Demo I Multimode Digital Radio 7/01 Contract Award MDR deployment Rule Making 1/04 NPRM 6/03 Begin Formal Internal Coordination 6/04 Initiate Final Rule 6/05 Rule Published 8/03 Notice of Availability TSO 9/03 AEEC Approved Char. Avionics 8/04 Certified Aircraft 10/01 MOPS 10/02 Strawman Characteristics Complete 12/09 Operational 6/05-12/09 Aircraft equip Ground System 10/01 Sys Reqs Doc 11/02 RPDE Source Selection 1/05 Full Scale Dev Contract Award Implementation Validation & Inter-Operability Tests with Airborne Avionics 10/07 Keysite 8/03 Notice of Availability TSO 9/03 AEEC Apprvd Char. 12/01 GIAs 5/03 Begin Deployment 8-12/02 Ops Testing

4 National Airspace System Transition to Digital Communications Dem/Val Analog Voice, 25 KHz Initial Datalink (VDL-2) Full Operational Evaluation & Exercise of Digital Voice and Datalink (VDL-3) Next 5 years VDL-2 Datalink Analog Voice 5-10 years Maintain Terminal Analog Voice Implement VDL-3 Digital Voice Expand Datalink VDL-2 Applications Enroute High Airspace National Airspace RCAG ARTCC VDL-3 Link years Expand Enroute Digital Voice (VDL-3) Initiate Terminal Digital Voice (VDL-3) Increase Datalink Capacity & Capability (VDL-2 & VDL-3) Terminal Airspace years Expand Digital Voice (VDL-3) to all domains Expand Datalink Capacity in all domains and all applications (VDL-2 & VDL-3) AFSS

5 NAS Data Link Transition FAA views VDL Mode 2 and VDL Mode 3 as complementary, not competing technologies CPDLC initially will be fielded on VDL-2 –Only viable technology in required time ( ) –Stepping stone for data link use in air traffic control –FAA pays ATC message charges CPDLC available on VDL-3 in 2012 –Potential for other applications (e.g. weather) on VDL-3 Datalink applications still available to VDL-2 service providers –Users would pay any associated message charges VDL-2 remains essential for the purpose it was developed –AOC and other air traffic management functions –FAA does not plan to provide AOC-type information on VDL-3

6 International Harmonization FAA strongly supports the 1995 ICAO COM/OPS/DIV decision for digital, TDMA-based voice and data link as the future air/ground communications technology