NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
NANPA Oversight Working Group Status Report to the NANC March 20, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Review of Fiscal Law December 18, 2002 DRAFT. Change Management Center 2 DRAFT Overview Purpose & Objective Challenges Assertions Partnership Basic Approach.
SIP/2012/ASBU/Nairobi-WP/19
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Presented to: By: Date: Federal Aviation Administration FAA VoIP- Interoperability Event Summary Report ICAO WG-I/14 July 18-20, 2011 FAA.
Overview of the interoperability Regulation
U.S. Plans for ADS-B Briefing for
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
GLOBALink/HF Data Link
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
Next Generation Air/Ground Communications (NEXCOM)
P AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013.
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
International Civil Aviation Organization
Joint FAA/Eurocontrol Future Communications Study (FCS)
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Ground Marker Regional Briefing to AWP ACP WGF10/WP14.
SATELLITE DATA LINK SYSTEM (SDLS)
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
NEXCOM by Bruce Eckstein FAA. NEXCOM The program to address NAS domestic A/G communications for voice and data The FAA established the NEXCOM Program.
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
1 Global Satellite CNS Program. 2 Background/status –Supplemental FY 2002 appropriation provided funding to explore secure global satellite CNS for air.
Aerospace Division Anastasia Project Airborne Communication and Navigation Satellite Technologies And Techniques in a System Integrated Approach Presentation.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
International Civil Aviation Organization
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Military Use of Data Link Phil Platt ATN2001, IEE, London
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Next Generation Air/Ground Communications (NEXCOM) Program Presented to Airborne Internet Collaboration Group Reston VA April 17, 2003 Dieter Thigpen Integrated.
Data Link Communications
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
Workshop on preparations for ANConf/12 − ASBU methodology
NEXCOM Next Generation Air/Ground Communications
International Civil Aviation Organization
NEXCOM Next Generation Air/Ground Communications Appendix G
International Civil Aviation Organization
NEXCOM by Bruce Eckstein FAA.
NEXCOM by Bruce Eckstein FAA.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
Joint FAA/Eurocontrol Future Communications Study (FCS)
ICAO ACP Working Group M Iridium Sub Group Overview
Presentation transcript:

NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead

2 NEXCOM Program Background NARC Recommendations & FAA Response Report on spectrum status –FAA to provide annual update of status & projected demand Continue to support VDL-2 development –FAA uses VDL-2 as incubator of datalink program and operational concept validation –FAA expects combined capacity of VDL-2 & VDL-3 required to meet RTCA Combined Operational Concept & OEP objectives Expedite system demo of VDL-3 in a certified system –FAA will demo a certifiable VDL-3 voice system and an interoperable data system by 2004 in advance of rule publication

3 NEXCOM Program Background NARC Recommendations & FAA Response Develop an alternative plan if VDL-3 proves untimely –FAA begins deployment of 8.33 capable radios in 2003 Lead development of common next generation communications system –FAA believes VDL-3 is next system through 2030 –FAA will work with ICAO to jointly study VHF architecture & critically review alternate band solutions as proposed

Operational System Demo NEXCOM System Demonstration Plan System Demo I Objective: Show VDL-3 technology is viable Demonstrates: Coverage Voice Quality Voice Override Integrated Voice and Data Objective: Show NEXCOM system architecture viability Demonstrates: Sector Handoffs ATN Network Interoperability System Management Commercial infusion Technology maturation Objective: Show commercial avionics certifiability and operational suitability Demonstrates: Operational digital voice Infosec capabilities Commercial avionics Human factors System Demo II System Demo I Equipment: Air: MITRE Prototype Ground: 99 Configuration ITT MDR with FAA Prototype RIU System Demo II Equipment: Air: MITRE & FAA Tech Center Prototypes Vendor Avionics (prototype) Ground: ITT MDR with FAA Prototype RIU Vendor Rapid Development equipment Operational System Demo Equipment: Air: Vendor Avionics Ground: ITT MDR with FAA Prototype RIU & GNI

NEXCOM Schedule Overview Demo MDR Ground System Avionics Rule Making 6/05-12/09 Airlines equip 6/05 VDL-3 Rule Published 7/01 Contract Award MDR deployment 10/03 System Demo II 10/04 Operational Demo 12/09 Operational 7/02 Prototype Contract Award 10/02 Characteristics Complete 1/04 NPRM 10/02 System Demo I 10/01 System Reqmnts Document 1/02 RTCA Principals of Use 10/02 In-Service Decision 8/04 Certified Aircraft 1/05 Full Scale Dev Contract Award Implementation 10/01 MOPS 8/03 Notice of Availability TSO Validation & Inter-Operability Tests with Airborne Avionics Analysis & rule writing

6 Avionics OTA 12/ AVIONICS MANUFACTURERS (Development/Test) 6/03 9/03 7/016/02 FAA VDL-3 TSO (AVR) Draft TSO Initiated Pub in Fed Register Disposition of Comments Complete Clearance Record Release 2/03 3/03 5/03 Disposition Closed AIR Internal Review 8/03 Notice of Availability (TSO) System Test & Integration Complete (contractor) Prelim Design Complete Prep/Sub Prelim SSA & Plan for SW Aspects of Cert 6/03 AVIONICS MANUFACTURERS (TSOA) 10/03 ACO Reviews TSO Data Pkg 11/03 TSOA AVIONICS MANUFACTURERS (Installation STC) 10/03 Prep/Submit Flight Test Plan & Balance of Design Approval Docs Pre-Production/Interoperable Avionics to WJHTC Submit Application for STC Conformity Insp & Install. Flight Test 12/03 STC 7/04 NEXCOM VDL-3 AVIONICS TIMELINE PD, SOW, OTA Template Available to Vendors 9/28/01 Discussions w/Manufacturers AEEC VDR Subcommittee 10/01 AEEC Char Available Standards/ Requirements MOPS SARPS 9/0110/01 SC 198 SPR Voice Interoperability Docs SC189 SPR Data 8/30/01 TSO Data Pkg to ACO Operational Apprvl (AFS) 20 Months 4/04 10/02 Submit to Legal Green Cover MOPS Available 4 Mos 6 Months 9/02 6/03 Legal Review 7/03 AGC Review 8/01 03 Demo - TC 04 Demo - Ops Site Certified Aircraft 10/038/ /04 5/02 10/02 9/13/01 PD (1st Industry Draft) 6/02 A Version MOPS Complete 2/04

7 NEXCOM Program Risks Issue: Certified Avionics availability Action Plan: –FAA/Airspace Users to collaborate on demo schedule & participation –FAA/Industry to develop partnership agreements to develop, install & test avionics –FAA/Users to provide in-kind support to demo operations Status: –System Architecture & Integration Committee work – complete –Characteristics development – pending AEEC General Session

8 NEXCOM Program Recommended Action: Approve initiation of VDL-3 characteristics development based upon existing 750 architecture