Sixth Northwest Conservation & Electric Power Plan Proposed Combined-cycle Power Plant Capital Cost Assumptions Jeff King Northwest Power and Conservation.

Slides:



Advertisements
Similar presentations
Clean and Affordable Energy Future in Northwest U.S. Nancy Hirsh NW Energy Coalition October 1, 2014.
Advertisements

Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Sixth Northwest Conservation & Electric Power Plan Actual vs. Modeled Operation of Combined-Cycle Combustion Turbines in the Pacific Northwest Maury Galbraith.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
Copyrighted © 2000 PG&E All Rights Reserved CASE Initiative Project TDV Economic Update Brian Horii and Snuller Price Energy & Environmental Economics,
ACCOUNTING CONCEPTS. BASIC CASH FLOW MODEL  REVENUES = PRICE * VOLUME = R  SALVAGE = VALUE OF CAPITAL AT THE END OF THE PROJECT LIFE = S  PROFIT =
® Investor Meetings June 7-8, 2010 PG&E Corporation.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
Sixth Northwest Conservation & Electric Power Plan Proposed Aeroderivative Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation.
Rooftop Solar Photovoltaic Seventh Plan Approach to Analysis CRAC November 13, 2014.
Ben Fowke Chairman, President and CEO Xcel Energy Today’s Energy Outlook.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
February 10, 2008 Sixth Northwest Conservation & Electric Power Plan Woody Biomass Resource Assessment Jeff King Northwest Power and Conservation Council.
Avoided Costs of Generation
Energy Analysis Department Coal-Wind Hybrid: Assumptions & Findings Coal-Wind Hybrid: Assumptions & Findings Amol Phadke, Ph.D. Lawrence Berkeley National.
Northwest Power and Conservation Council Slide 1 The Role of Efficiency In Meeting PNW Energy Needs Tom Eckman Manager, Conservation Resources Northwest.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
Sixth Northwest Conservation & Electric Power Plan Proposed Nuclear Power Plant Planning Assumptions Jeff King Northwest Power and Conservation Council.
Wholesale Power Price Forecast 01/28/03 Current Trends Update March 11, 2003.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Sixth Northwest Electric Power and Conservation Plan Generating Resource Assessments Jeff King Northwest Power and Conservation Council Portland, OR July.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Sixth Northwest Conservation & Electric Power Plan Resource Development Parameters Jeff King Northwest Power and Conservation Council Generating Resources.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Wholesale Power Price Forecast 01/28/03 Current Trends Update Jeff King January 31, 2003.
December 9, 2008 Sixth Northwest Conservation & Electric Power Plan Integrated Coal-fired Gasification Plant Resource Assessment Jeff King Northwest Power.
Sixth Northwest Conservation & Electric Power Plan Proposed Heavy-duty Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation.
Sixth Northwest Conservation & Electric Power Plan Proposed Wind Plant Capital Cost Assumption Jeff King Northwest Power and Conservation Council Portland,
Wholesale Electricity Price Forecast Draft Current Trends Forecast Jeff King Conservation Resource Advisory Committee September 30, 2002.
Sixth Northwest Conservation & Electric Power Plan Geothermal Power Generation Resource Assessment Jeff King Northwest Power and Conservation Council Power.
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
Northwest Power and Conservation CouncilProCost Version 2.2 RTF July 2007.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Natural Gas and Power Generation The GHG Solution Is At Hand Jack Fusco President & Chief Executive Officer Calpine Corporation November 15, 2010.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
July 17, GRAC 7/17/08 - Wrap-up I 1)Are the reference plant assumptions reasonable? More or less specificity? Important variations? 2)Should other.
Rocky Mountain States Sub-Regional Transmission Study December 9, 2003 Generation Additions Strawman.
1 Proposed Input Assumptions to RTF Cost-Effectiveness Determinations February 2, 2010.
Northwest Wind Integration Action Plan Jeff King Northwest Power & Conservation Council June 27, 2007.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
An Overview of Demand Response in California July 2011.
1  Power plant costs are key factors in energy market policy decisions Key assumptions in the EIA NEMS model Input factors to all energy economic models.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Northwest Power and Conservation Council Proposed Revisions to Council’s Fuel Price Forecasts Natural Gas Advisory Committee June 27, 2007.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Rocky Mountain Area Transmission Study Overall Economics of Alternatives Steering Committee Meeting April 29, SLC.
CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla,
1 Biomass based Energy System for a Rural Area in Japan June 22-24, 2004 Toshihiko Nakata Tohoku University, Japan.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Enron Corp. Board of Directors Presentation
Northwest Power and Conservation Council
Jeff King Northwest Power and Conservation Council
Status of Northwest Gas-fired Power Plants
Economics of Electricity Transformation
Study Results Drought Scenario Study
Technical Committee Meeting March 18, 2016
Jeff King Northwest Power and Conservation Council
Steering Committee Webinar March 25, 2016
Presentation transcript:

Sixth Northwest Conservation & Electric Power Plan Proposed Combined-cycle Power Plant Capital Cost Assumptions Jeff King Northwest Power and Conservation Council Generating Resources Advisory Committee Portland, OR September 25, 2008

2 Combined-cycle cost elements Capital cost Plant development and construction ($/kW) Operating costs Fixed operation and maintenance ($/kW/yr) Variable operation and maintenance ($/MWh) Fixed fuel (capacity payments) (zone-specific) ($/kW/yr) Variable fuel (commodity payments) (zone-specific) ($/MMBtu) Transmission from point of interconnection to LSE wholesale delivery point (BPA Point to Point tariff as proxy) ($/kW/yr) Emission costs - Cost of CO2 allowances ($/tonCO2)

September 25, Assessing combined-cycle capital costs Problems: Rapid escalation of plant capital costs in recent years Variety of plant configurations and features Sensitivity of output to elevation, ambient temperature and certain features Several recently reported costs are for completions of suspended projects Reported costs are poorly documented more often than not. Sources: Primary: Reported costs for actual and proposed plants Supplementary: Other surveys and estimates

September 25, Establishing comparability I Initial screen to identify representative projects Omit completions of suspended projects Limit to "F, G & H" technology Omit unusually large (3 & 4 plant) projects Omit unusual configurations (e.g., 3x1) Focus on post-2004 completions; closely focus on 2006 & later Adjust costs to baseload technology w/evaporative cooling Deduct for dry cooling costs (-6% total cost) Deduct for fired HSRG (duct firing MW ~ 30% cost of baseload MW)

September 25, Establishing comparability II Normalize capacity to lifecycle ISO conditions at the point of interconnection Problem - reported capacity may be site-rated or nominal, winter or summer, typically not reported Use OEM reference plant ISO ratings from GTW (new & clean nominal capacity, unfired HSRG, wet cooling, adjusted for auxiliary loads) Reduce capacity 0.5% for main transformer losses (post-analysis) Reduce capacity 2.7% for lifecycle aging losses (post-analysis) Normalize to "overnight" cost in 2006 dollar values IPP projects: Assume reported costs are EPC costs, add owner's cost allowance (5%); development cost allowance (1.4%); financing costs (2% of debt); back-calculate overnight cost for service year using MICROFIN Utility projects: Assume reported costs are "all-in", back-calculate overnight cost for service year using MICROFIN

September 25, Assign a vintage to the samples Problem: Environment w/significant annual escalation Objective: Cost of project w/2010 service Reported all-in costs - MICROFIN yields a comparable constant dollar overnight cost for constructing a project for service in year x. Cost estimates - generally, costs at time of estimate plus an contingency for anticipated escalation to a future expenditure date - and allowance which may not prove accurate. Vintage is time of cost estimate release. Plot all-in and estimates separately - will illustrate changing perception of escalation.

September 25, Useable reported costs ProjectServiceStateConfigurationRaw $/kW Type of Est Arlington Valley (Maricopa) IAug-02AZ2x1 GE7FA$439Preconstruction announcement Coyote Springs 2Jun-02OR1x1 GE7FA$641Preconstruction announcement Otay Mesa (Original estimate)P2002CA2x1 Unannounced$539Preconstruction announcement Grays Harbor (Original est.)P2003WA2x1 GE7FA$462Preconstruction announcement Goldendale Energy CenterSep-04WA1x1 GE7FA$531Preconstruction announcement Rocky Mountain Energy CenterJun-04CO2x1 SW 501F$580Preconstruction announcement Blythe Energy Project IIP2004CA2x1 SWV84.3a$481Preconstruction announcement Silver BowP2004MT2x1 SW 501F$680Preconstruction announcement Blythe Energy Project IJan-04CA2x1 SWV84.3a$673As-built Arlington Valley (Maricopa) IIDec-05AZ2x1 GE7FA$333Preconstruction announcement Chuck Lenzie (ex Moapa) IJan-06NV2x1 GE7FA$481Preconst comp. est + acquisition Chuck Lenzie (ex Moapa) IIMay-06NV2x1 GE7FA$481Preconst comp. est + acquisition Cosumnes Phase IMar-06CA2x1 GE7FA$870Projected at 95% complete. Current CreekApr-06UT2x1 GE7FA$684Ratebase capitalization Lake SideJul-07UT2x1 SW SCC6 5000F$650Ratebase capitalization Port WestwardJun-07OR1x1 MHI 501G$657As-built Tracy CCP2008NV2x1 GE7FA$778Nevada Power SEC 10-K San Gabrial (Low)P2010CA2x1 SW SCC6 5000F$762Preconstruction announcement San Gabrial (High)P2010CA2x1 SW SCC6 5000F$776Preconstruction announcement Colusa (Low)P2010CA2x1 GE7FA$685Preconstruction announcement Colusa (High)P2010CA2x1 GE7FA$761Preconstruction announcement Avenal Energy ProjectP2012CA2x1 GE7FA$833Preconstruction announcement

September 25, Normalized combined-cycle project cost

September 25, Other surveys and estimates EIA 2008 Annual Energy Outlook (Jun 2008) NETL Cost & Performance Baseline for Fossil Energy Plants (Aug 2007) CEC Comparative costs of California Central Station Electricity Generation Technologies (Jun 2007) Lazard Levelized Cost of Energy Analysis (Jan 2008)

September 25, Comparison to other surveys & estimates CEC based on survey of projects constructed between 2001 & 06

September 25, Proposed Sixth Plan costs

September 25, Adjustments to model input values Overnight (2006$) Derate 0.5% to Station Busbar (2006) Derate 2.7% for Lifecycle Aging (2006$) All-in, 2010 service b (Nominal$) 5 th Plan, 2x1 540MW Base + 70 MW DF $591$657 Proposed 6 th Plan, 2x1 540MW Base, no DF $850$854$877$976 Proposed 6 th Plan, 2x1 540MW Base + 70 MW DF $782 a $786$807$897 a.540 $850/MW /MW b.IOU financing

September 25, Cost of baseload energy (Point of interconnection) IOU financing 2010 service Westside NG, 2007 NPCC forecast CapFac ~ 90% of baseload rating

September 25, Where things stand 2010 service Point of interconnection (wind incl. R & LF) 2008 Federal production tax credits Baseload operation Bingaman/Specter CO2 capping cost