VDL 2 capacity simulations Conclusions on the capacity per VDL 2 channel Presentation by P. Delhaise.

Slides:



Advertisements
Similar presentations
ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Advertisements

ICAO ACP Working Group C Meeting Toulouse October 2003 WGC6/WP29
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Steve Zaidman, AAF-1 George Sakai, ASR-1 Federal Aviation Administration Washington, DC September 16, 2003 There are no benefits to compromising safety…only.
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
GLOBALink/HF Data Link
Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
Business line or Division or Corporate Department STAR presentation Bernard MEURICHE THALES Communications September 2006.
ACARS & VDL Mode AVICOM Japan
NASA A/G Communications Technology Assessment Study First Order Analysis of Required Bandwidth for the Next-Generation Aeronautical Data Link March 14,
ACP WG B Work Program Frequency Planning Criteria
LINK2000+ Status Søren Dissing
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Frequency Management Group Chairman
Air / Ground Communications in Europe
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
ACD A Frequency Management Activities in Europe PRESENTED BY: FMG Chairman John Mettrop From UK Civil Aviation Authority.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
VDL Mode 3 Cosite Interference Testing Summary WP-WGB1701A Attachment A International Civil Aviation Organization 17th Meeting of Aeronautical Communications.
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
VDL Mode 4 Cosite Investigations ACP WG-M 9 th Meeting, Agenda item 3 Montreal, October 2004.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
Presentation by K. P. Rimal, Regional Officer of the ICAO ASIA-PACIFIC Office to the Seminar on implementation of data link and SATCOM Communications in.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
TCP / IP and ATN in Europe Danny Van Roosbroek, EATM/DAS/CSM
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
Aeronautical Communications Technologies Simulator
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Communication Domain Future Aeronautical Communications
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Future Communications Roadmap
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
Alaska Accountability Adequate Yearly Progress February 2007, Updated.
ATN99 International ConferencePage September 1999 London ATN99 INTERNATIONAL CONFERENCE September 1999 London Paul Hennig, United Airlines.
MIMO Broadcast Scheduling with Limited Feedback Student: ( ) Director: 2008/10/2 1 Communication Signal Processing Lab.
The basics for simulations
The Future of PETAL Technology
Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATM Modernisation & Network Manager Frank Brenner, Director General EUROCONTROL Airbus ProSky Symposium April 8 th – 10 th, 2014, Abu Dhabi.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN Subnetwork Implementation:
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
1 15/03/2016 VDL Mode 4 Co-Site Investigations Part I Co-Site Interference Scenarios Bertrand DESPERIER ISA TELECOMS.
Additional aviation spectrum allocation for AM®S
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
VDL 2 capacity simulations
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
SPECTRUM REQUIREMENTS FOR FUTURE AERONAUTICAL MOBILE (ROUTE) SYSTEM - AM (R )S ( Presented by Christian Pelmoine /Dale Stacey, Eurocontrol.
The Air Ground Datalink Server (AGDS)
Ground System implication for ASAS implementation
Presented at ICAO ACP WG-I By Robin Hughes
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
Communications Operating Concept & Requirements (COCR)
VDL Mode 4 Cosite Investigations
ATN Subnetwork Implementation:
VDL 2 capacity simulations
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Frequency Management Group Chairman
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Presentation transcript:

VDL 2 capacity simulations Conclusions on the capacity per VDL 2 channel Presentation by P. Delhaise

AgendaAgenda Total capacity per VDL 2 channel Comparison with Link2000+ requirements Recall on Frequency Managers deployment plan Brief look at Airborne Co-site study (integrated to ACTS simulations) Q&A

In search for total capacity/ VDL 2 channel Using peak days-peak hour air traffic records in 600 NM –radius – busiest part of Europe Applying different % of aircraft equipment with AOC and ATS (Link2000+) applications Increasing % equipped as long as QoS is OK (95% of Round Trip Tx within 8sec, as required for ACL )

Total Capacity/VDL 2 channel Up to 1220 flights operating AOC flights operating Link2000+ can be connected on a single VDL2 channel Equivalent to 100% migration of 2004-ACARS traffic + 42% of flights in UA during peak hour already running Link2000+.

Comparison with Link2000 capacity requirements (1/2) Link2000+ running on 40-45% of UA traffic : forecasted within At that time, full AOC migration (nearly) completed from ACARS to VDL 2 ? Air traffic increase for coming years =? Our best guess : 1rst Channel saturated within in busiest areas

Comparison with Link2000 capacity requirements (2/2) Final Link2000+ target: equipping 75% of UA traffic, forecasted in 2014 At that time, assume full AOC migration from ACARS to VDL 2 Peak hour ( 2004 traffic) : 75% of UA flights ~ = 1600 flights for Link +, along 1220 flights equipped with AOC Final Link2000+ (2014) deployment requires : 2 – 3(*) VDL 2 channels for busiest areas (*) Need revisiting/ simulating ENR sectors, H.O. algorithm and round-trip delay requirements to confirm

Target VDL deployment plan for ICAO FMG EUR O Ac Si AAAAAAAAA M4M2 OOO 2002 Ac Ar Migrated to MHz Migrated to MHz Oct 04- next actions are : re-allocate OPC and move M4 to MHz, and envisage next steps Since ST-15 study, coordination wih FMG EUR for provision of 4 VDL-2 channels AAAAA M2 Step b M4 - M2 AAAAA Step a M4 - M2 Ac Si - O OR AAAAA M4M M4M2 Step M2

VDL 2 Tx AM-DSB voice Rx AM-DSB voice Tx VDL 2 Rx AM-DSB voice Tx VDL 2 Tx Analysis of Airborne co-site impact (presentation to ICAO ACP end October 04) Analysis of 3 airborne interf. cases (VDL 2 VHF- voice) Analysis made use of : –Lab aircraft, –700-flight records to describe VHF voice traffic (ATC and OPC) –ACTS-simulations for impact on CPDLC applications Impact confirmed tolerable for Link2000+ or any CPDLC –like application, with significant margins Sounds really tolerable for voice operation Impact on total channel capacity ~= 1.8% of ATS traffic (unchanged AOC)

ConclusionsConclusions Detailed VDL2 simulator covering busiest part or Europe is now available and validated Results indicate that first VDL 2 channel will support full AOC migration +Link2000 traffic up to 2007 minimum Full Link2000 deployment (75% of UA traffic) requires 2 or 3 channels for busiest areas This matches expectations and ongoing channels deployment initiated at ICAO EUR FMG level since 2001 Airborne co-site issue is clarified for VDL 2 and accounted in the achieved simulations.

Questions ?

ACTS features and validation (1/2) Air traffic model in 4D-positions based on real flights records in European area VDL 2 ground-stations topology in 3D according to commercial deployments AOC data traffic model based on service providers traffic statistics in Europe. ATS data-link traffic tuneable per flight phase, based on Link2000+ requirements Multi-path VHF propagation model validated by flight trials

ACTS –features (2/2) Accurate and SARPS compliant simulations of VDL 2 physical layer, CSMA and AVLC, each one validated per specific programs with independent developments ATN overhead and signalling inserted according to live – records of service providers. Airborne co-site interference simulated with interfering voice traffic model based on live statistical records.

contactscontacts Patrick DELHAISE, Eurocontrol DAS/CSM VDL 2 Project manager Massimiliano ESPOSITO, Eurocontrol DAS/CSM VDL 2 Engineering Bertrand DESPERIER, ISA TELECOMS (ACTS – simulation designer) 38 rue des Gravilliers F PARIS France