Long Range Planning Pier Oddone September 24, 2007.

Slides:



Advertisements
Similar presentations
Office of Science U.S. Department of Energy 1 DOE Office of Science High Energy Physics Biological and Environmental Research Advisory Committee April.
Advertisements

ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Position of the Czech Republic on the European Strategy in Particle Physics Current main activities in particle physics * Plans for the future Recommendations.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Department of Energy Office of Science HEP FY08 Budget Status and Issues Robin Staffin preCRB Discussion April
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Fermilab Steering Group develop roadmap for accelerator-based HEP.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
Department of Energy Office of Science Report from DOE Office of High Energy Physics Report from DOE Office of High Energy Physics Dr. Robin Staffin Associate.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
This is the last message in this gathering of North American PI’s with an interest in the INFN hosted SuperB project. I will try to deal with issues on.
TeV Particle Astrophysics 2009 Welcome & SLAC Connections David MacFarlane Associate Laboratory Director for PPA.
Office of Science U.S. Department of Energy SLAC Users Organization Meeting July 6, 2004 Dr. Robin Staffin, Associate Director Office of High Energy Physics.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
J. BrauJune 8, Fermilab Users Meeting ILC Related Talks Congressional Perspective Judy Biggert, US Congress News from the NSF Jon Kotcher, NSF ILC/T2K.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC.
The Future of the US program Pier Oddone Symposium for the 30 th anniversary celebration of the US/Japan Agreement on High Energy Physics October 21 st,
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
Long Range Plan P5 Presentation January 31 st, 2008 Pier Oddone.
Impacts of Tevatron Extension Pier Oddone P5 Meeting, October 15 th, P. Oddone, P5 Meeting, October 15, 2010.
Planning for Discoveries in Particle Physics Michael Witherell EPP2010 May 16, 2005.
Physics Priorities S. Dawson July 11, 2007 Fermilab Steering Committee Meeting.
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
CERN Strategy Group WS at Zeuthen Input from Japan Mitsuaki NOZAKI (KEK)
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Proton Plan PMG 2/22/06 E Prebys 1 Some Disclaimers I’ll be 100% honest These are my personal opinions  Pretty much in line with conversations I’ve had.
All Hands Meeting FY 2008 Budget Pier Oddone Fermilab December 20, 2007.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
Accelerators in our Future ILC and Beyond Barry Barish Caltech Neutrino Telescope - Venice 13-March-09.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Pathways to Explore Neutrino Physics Fred Gilman NuFact03 New York June 5, 2003.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Summary Comments and Discussion Pier Oddone 40 th Anniversary Users’ Meeting June 8, 2007.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Fermilab Program Overview Pier Oddone September 25, 2007.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
J. Corlett. September 24, 2007 Report of the Fermilab Accelerator Advisory Committee on the Fermilab Steering Committee Report P5 Meeting Fermilab September.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
A vision for Fermilab Presentation to P5 Fermilab 9/12/05 Pier Oddone.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Budget Outlook Glen Crawford P5 Meeting Sep
A vision for Fermilab Presentation to the National Academy Panel EPP 2010: Elementary Particle Physics In the 21 st Century Pier Oddone, 5/16/05.
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
Hitoshi Yamamoto, 2-Oct Detector Tohoku Forum for Creativity - a Pilot Program - ‘Particle Physics and Cosmology after the Discovery of the Higgs.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
Perspective on the Future of HEP By Jonathan Dorfan, SLAC Director Snowmass 2001 Sunday, July 1, 2001.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Fermilab Project Overview Michael Lindgren 2014 EVMS Surveillance Review 10-Dec-2014.
Revealing the Hidden Nature of Space and Time Charting the Course for Elementary Particle Physics (in the U.S.) Committee on Elementary Particle Physics.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Future Flavor Physics At Fermilab?
The European Strategy for Particle Physics
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Snowmass on the Mississippi
Fermilab Proton Beams: Program Perspectives Greg Bock Fermilab Science and Engineering at Henderson-DUSEL Capstone Workshop Stony Brook May 5,
Presentation transcript:

Long Range Planning Pier Oddone September 24, 2007

2 If you were Office of Science… If you were Office of Science making a ten year plan…… What would you have received as the “ships of the line” for HEP from the community? LHC Upgrades: uncertain in time scale or scope. Detectors? Accelerators? JDEM/SNAP: $400M assumed by BEPAC ILC: time scale undetermined; is 0.5 TeV enough? Size requires Presidential initiative outside of HEP

3 If you were Office of Science… What would you place in the plan? Clearly an allowance for LHC upgrades. $500M? – but lack of concrete plans and knowledge of what is needed might limit how much and when Clearly $400M for JDEM/SNAP. If selection other than SNAP, we might acquire more astronomers? Not construction $$ for ILC: if it does not happen, clearly Office of Science would not need the $$

4 If you were Office of Science… How much $$ would you put in the plan? HEP will spend >$8B in the next ten years at the present level More than enough for the program proposed - excluding the ILC Way too little for an ILC; need of a separate stream

5 Problems for P5 to solve Problems that arise from the “rules of the road” Problems that arise from competitive facilities in other regions Problems that arise from “selection” of projects as opposed to “roadmap”

6 Rules of the road Operating facilities with essential programs get top priority. Example: Tevatron running Next priority is construction projects with a budget and a schedule R&D programs are squeezable when confronted with the top priorities

7 Problem from the rules of the road We are shutting our major facilities (program done): Tevatron, B-factory, CESR We are not building any large projects. NOvA is the exception and it is modest ($260M for detector and accelerator) Problem: no driver to maintain/increase the resources for the field

8 Competitive situation Energy Frontier: Europe unique for the next one to two decades; ILC is our first priority in the US Intensity frontier: if we do nothing we will lose the lead in proton intensity to JPARC (Japan) and the SPL (Europe) and quark flavor physics to SuperB in Japan or Italy Particle Astrophysics: US has had a leading role and should maintain it with JDEM, LSST

9 Problems with competitive situation In a world with a delayed ILC or no ILC – grave risk that we are left ONLY with accelerator R&D without world leading facilities either at the energy frontier or the intensity frontier Once we are in that bucket: much harder to get out to a position to build the next global facility: the accelerator based program will be smaller

10 Problem: selection vs. roadmap We have selected the projects to start: DES, NOvA, Daya Bay – only NOvA is a “large project”. First step of a roadmap Problem: “…I want a dialog with the HEP community…” leads to “we’ll talk to you in three years when we know more….” Example: can say “wait until we know sin 2  13 ” or build a roadmap that depends on that number

11 Fermilab Steering Group Steering Group NOT to provide a plan A vs. plan B, rather an integrated roadmap with discovery opportunities in the next two decades that: supports the international R&D and engineering design for as early a start of the ILC as possible and supports the development of Fermilab as a potential host site for the ILC; develops options for an accelerator-based high energy physics program in the event the start of the ILC construction is slower than the technically-limited schedule; and

12 Fermilab Steering Group includes the steps necessary to explore higher energy colliders that might follow the ILC or be needed should the results from LHC point toward a higher energy than that planned for the ILC Broad community engagement under the leadership of deputy director Young Kee Kim

13 What we are asking P5 Take into consideration it takes a minimum of four years to break ground on any new project Need recommendations on the roadmap that take account of the full complexity of the world in which we live If the roadmap we propose is to be effective, it needs R&D support for project preparation