Item 611 Update Performance Based Specification Hans Gucker, P.E.

Slides:



Advertisements
Similar presentations
2013 Construction and Material Specifications Hydraulics and Environmental Summary Gary Angles, Office of Construction Administration.
Advertisements

Materials Auditing on LPA Projects Experiences of one district.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Supplemental Specification 802: Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures Ted Strickland, Governor Jolene Molitoris,
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Florida Product Approval System Validator Training December 11, 2012 Florida Product Approval System Validator Training December 11, 2012 Florida Building.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Buy America Montana Department of Transportation Pat Ernst & Anson Moffett Construction Engineering Services Materials.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
PIPE INSPECTION AND REPAIR
EQUIPMENT VALIDATION.
Elements of a Good Concrete Pipe Specification David JP Matocha Technical Resource Manager Hanson Pipe & Precast.
Chemically Treated Subgrade Stabilization. ODOT Geo/Hydro/HazMat Conference Chemically Treated Subgrade Stabilization ODOT Pavement Services Rene’ A.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Placing Order Approval Process Manufacturing Delivery SUBMITTAL PROCESS.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
Module 7: Construction Phase
CONSTRUCTION SEMINAR Title 28 Professional Engineers and Land Surveyors Effective October 1, 2004.
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
How to use it to Reduce Life Cycle Costs
From Research Prototype to Production
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
LINER AND COVER CONSTRUCTION BASICS Presented by: Curt Ahrendsen, Principal American Environmental Consulting AEC.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
Sign Structures Updates: Helpful Tips for Inspectors
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
CONSTRUCTION MANAGERS MANUAL
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code Overview.
Position Statement on Sealed Truss Placement Diagrams for the State of California (including Los Angeles) Overview.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Construction Inspection for Field Office Activities Welcome by SCE Introductions Name Position (SCT, SC, DC, CET, ETC) Location Instructors 1.
Installation and Inspection of Concrete Pipe Joining / Joints
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Quality, ROTI, Processes Presented by: Mr. Dan Hohman
2016 Construction & Materials Specifications
ODOT District MS4 Liaison Training: Why are we here?
Inspector's Role and Responsibilities
Green Infrastructure Contractor Training Program 5WKS COST FREE
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Inspector's Role and Responsibilities
Ensuring a successful TPC production
Acceptance Process for Manufactured Products by Certification:
Inspector's Role and Responsibilities
2K CB FDR Overview:  Agenda, Charge, Review Process
Punch list / Close Out - Project Completion
4th Annual Construction Law Summit
Navigating FDOT Specifications and Standards
Raw Materials For Precast Concete Pipe and Box Culverts
Quality Control Personnel Training
Excavation.
Construction Considerations
2013 Construction and Material Specifications Hydraulics and Environmental Summary Gary Angles, Office of Construction Administration.
SNS PPU Helium Vessel Design and Assembly
AASHTO LRFD Section 12 Standards
Presentation transcript:

Item 611 Update Performance Based Specification Hans Gucker, P.E.

611 Spec Update Recent Spec Changes – January 2015 Require geotextile fabric over coarse aggregate backfill Final Backfill shall meet requirements of Item 203

Contractor selects conduit material Works with conduit manufacturer to develop installation plan Installs pipe & provides installation documentation Inspections Testing Provides performance evaluation Findings reviewed by 3 rd party engineer 611 Review

611 Project Submittals Shop Drawings (as required) Installation Plan Construction Inspection Forms Performance Report Critical elements of the performance spec

Shop Drawings Two cases where shop drawings get forwarded on 1.Load rating calculations (structures under ODOT road) Send to District P&E Eng. forward to OSE 2.Change in structure type – verify hydraulic design Send to District Hyd. Eng. forward to OHE Signed by registered engineer (language revised in 800 – One Engineer only) Department has 15 days for the review

Installation Plans Needs to be specific… general 8 items required – for each run Manufacturer must sign off on installation plan Revised installation method or material requires a revised plan (signed by manufacturer)

Field Observations Small culvert projects still problematic Incomplete – not all runs or structures Slow & Unorganized Backfill material or compaction changing during construction Installation Plans Manufacturers not reviewing plan

Backfill material –All backfill & bedding material required to be identified – with compaction –Structural and Final backfill now defined Bedding Structural Backfill Final Backfill Conduit/Culvert Final Backfill CMS Item 203 Manufacturers only review for structural component of conduit Installations Plans

Coarse aggregate backfill Installations –Still requires geotextile below groundwater –Geotextile fabric over course aggregate Bedding Course Aggregate #57’s Fine Graded Conduit/Culvert Geotextile fabric

Construction Inspections Performed by Contractor Documents compliance with installation plan – Quality Control Modified installation - require modified installation plan Density testing included

Construction Inspections Field Observations Poor quality or minimal inspections – untrained personnel Rubber stamped inspection forms Transfer of inspection forms has been typically slow or not occurring Modifying installation - without informing Engineer

Performance Reports Final submittal – documents performance Includes Performance Inspection Independent Engineer evaluation Location data Types A & B District should not accept work if all information is not present Evaluation needs to identify all deficiencies Performance Inspection Evaluation Recommendati ons Performance Report

Performance Inspection Only (Type A, B & C) conduits and structures Performed day after installation period – based on each conduit phase Begins after rough subgrade compaction Manual or remote – both require video Independent Engineer evaluates findings 30 day waiting period may be waived Very few instances when waiver applies No access to conduit Inspection needs to be planned into work

Performance Inspection Field Observations Only parts of a conduit inspected All joints…not only some Manual inspection not videoed Surface settlements not observed Mandrels not meeting size requirements Based on nominal pipe size reference SS902

Inspection Videos Field Observations Remote inspections require crawler mounted camera per SS902 Ability to measure cracks and joint gaps Consider how files are presented to project Organize so run can be identified by file name File size Ensure material can be retrieved CD’s with paper cover can become unreadable Project Examples… O:\Construction\Gucker\D1 Construction School\31-D6- D7.mpg O:\Construction\Gucker\D1 Construction School\31-D6- D7.mpg O:\Construction\Gucker\D1 Construction School\vertical sag _CB 3A-CB 3A_ wmv O:\Construction\Gucker\D1 Construction School\vertical sag _CB 3A-CB 3A_ wmv

Engineer Evaluations No noted deficiency in evaluation

Engineer Evaluations Vertical sag not noted in evaluation

Engineer Evaluations Horizontal deflection at beginning of pipe – not noted

Racking vs. Deflection

Questions/Disscussion?