4.2 [3] How to Engage Vertical Participation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.

Slides:



Advertisements
Similar presentations
4.1 [0] Criteria for Successful Consolidation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.
Advertisements

Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Gale Lightfoot, Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS Machine-to-Machine.
1 Society Relations -- A Briefing by the Region 1 Society Liaison Gene F. Hoffnagle August 18, 2006.
Effective Service Projects–A Rotary’s Motto Service Above Self.
OpenStand and IEEE 802 Konstantinos Karachalios Managing Director, IEEE-SA 17 November 2012.
EISWG The Environmental Information Services Working Group of the NOAA Science Advisory Board Raymond J. Ban April 22, 2009.
Insert footer on Slide Master© University of Reading 2008www.reading.ac.uk Human Resources What do staff really want from a review process? Caroline Bryan,
Commonwealth Local Government Forum Freeport, Bahamas, May 13, 2009 Tim Kehoe Local Government and Aid Effectiveness.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All The Internet of Things (IoT) aka Machine 2 Machine (M2M) Bilel Jamoussi Chief, Study Groups Department.
1 [4.1]a Criteria for successful consolidation SDOThreshold/Foundation/Launch After/During Formation, Near-Term Comment Summary of discussions Verticals.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
The Vision, Process, and Requirements for Creating EarthCube Presentation at Second EarthCube WebEx Aug 22, 2011.
Developmentally Appropriate Practices (DAP)
An Introduction to the IAA Cecil Bykerk, President October 2011, Kuala Lumpur, Malaysia.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Gale Lightfoot, Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS and the Smart Grid.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Consolidated M2M standards boost the industry Li Li (Thomas) CCSA(Huawei) Document No: GSC16-PLEN-73.
4.5 [1] Types of M2M Consolidation Gerry Flynn, ATIS Delegation Verizon Communications, Director, Corporate Technology Meeting of Potential M2M Consolidation.
4.7 [5] Structure of M2M Consolidation Brian Daly – Member of ATIS Delegation (AT&T Director, Core Network & Government/Regulatory Standards) Meeting of.
The Value of Volunteering Women’s Foodservice Forum.
Broadband Forum Machine-to-Machine (M2M) Solutions Robin Mersh, CEO The information in this presentation is public.
Fostering an enabling policy environment for youth development: UNESCO’s response Section for Youth, Sport and Physical Education Division for Social Science.
1 SDOVerticals To Approach Overall Initial focus on, but not limited to: eHealth Smart Grid Transportation/Telematics Connected Home/Home Automation ARIB/TTC.
DIVISION Landstingsdirektörens stab Coral Interreg Europe proposal Project proposal addresses objective 1.2 of the Interreg Europe Programme: Improve the.
Internet 2 Corporate Value Proposition Stuart Kippelman (J&J) Jeff Lemmer (Ford) December 12, 2005.
Indicators of Success -- Applying the TOC What will change? You must be able to test your theory!
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
Empowerment Strategies for Connecting Families with Community Resources Allison LaMont, MSW, LMSW MIECHV Technical Assistance Coordinator Parents as Teachers.
Community Partner Advisory Groups An EEO/AA employer, University of Wisconsin Extension provides equal opportunities in employment and programming, including.
1 The Telecommunications Industry Association (TIA) ADVANCING GLOBAL COMMUNICATIONS Jeff Smith, Ph.D., Chief Technology Officer of Numerex (Nasdaq: nmrx)
Public Health Data Standards Consortium 2004 – 2005 Directions
Building and Sustainable Embibo Presented by Kenneth B. Mugabo April 2012 Fort Portal, Uganda.
Overview TIA TR-50 – Smart Device Communications Orlett W. Pearson March 2010.
Choosing the Route To Traveler Information Systems Deployment by ITS America ATIS Committee USDOT ITS Joint Program Office Washington State Transportation.
Public Health Data Standards Consortium
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
4.4 Timeline for M2M Consolidation Susan Miller ATIS Head of Delegation Meeting of Potential M2M Consolidation Partners #2 Washington, D.C. August 17-18,
Our LinkedIn IoT Community CHARTER (1) (who we are) We are an open community of practioners developing, deploying and operating Internet of Things (IoT)
Casualty Actuarial Society ERM for the CAS. Centennial Goal The CAS will be recognized globally as a leading resource in educating casualty actuaries.
Submission November 2011 Michael Lynch, MJ Lynch & Associates RR-TAG Opening Report Report of the September 2011 interim meeting.
4.6 [2] Stakeholders of M2M Consolidation Brian Daly – Member of ATIS Delegation (AT&T Director, Core Network & Government/Regulatory Standards) Meeting.
Responsible Research and Innovation as a part of Regional Innovation Eco-system Rhys Thomas Head of Innovation System and Engagement Pennaeth System Arloesi.
4.3 [4] Technical Scope of M2M Consolidation Brian Daly – Member of ATIS Delegation (AT&T Director, Core Network & Government/Regulatory Standards) Meeting.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
Fostering Parent and Professional Collaboration: Partnership Strategies © PACER Center, 2008.
2012 Center for Energy Workforce Development Summit November 14-16, 2012 Crystal Gateway Marriott Arlington, VA.
Bob BERSANI, GS1 Vice President Global Standards GS1 Standards Development Update.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
GEO BELIZE PROJECT Presented By: Marvin Moody/Christian Windsor/Rafael Lima April 7, 2014.
Jeju, 13 – 16 May 2013Standards for Shared ICT Telecommunications Standards for Smart Grids David Su National Institute of Standards and Technology Document.
LCC NETWORK STRATEGIC PLANNING Orientation Webinar for Strategic Planning Training and Workshop Participants July 21, 2014 Presenter: Michael Gale, LCC.
United 4 Smart Sustainable Cities: Working Group 3 Kari Aina Eik OIER Organization for International Economic Relations July 2016, Geneva First Meeting.
BLM Decision Making Process
ATIS’ Machine-to-Machine (M2M) Activity
Consolidated M2M standards boost the industry
Karen Bartleson, President, IEEE Standards Association
Driving Colorado Forward Together
U.S. Stakeholder Perspective: Information Technology Industry
HIS Smart Grid – Summary (1)
NPAIHB Quarterly Board Meeting: Accountable Communities of Health 101
IEEE Foundation: The Road Ahead
Using Service Learning in the Foreign Language Classroom
Karen Bartleson, President, IEEE Standards Association
December 9, 2016 ECTAC Quarterly Meeting
The Basics in 4 Letters Aspiration Breadth Commitments structure
The Robert Carr Fund’s Strategic Planning Exercise
Building Your Adaptive Leadership Skills
CCSA Considerations on M2M Consolidation
ATIS’ Machine-to-Machine (M2M) Activity
Presentation transcript:

4.2 [3] How to Engage Vertical Participation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners #2 Washington DC, USA August 2011 M2MCons02_08

Meeting of Potential M2M Consolidation Partners # August 2011 Leverage Regional Relationships with Verticals Participating Regional SDO’s seek to be a bridge between the M2M Global Harmonization Initiative (MGHI) and verticals. –Encourage their Participation Preferable that the VMPs be global in scope & represent industry balance –Examples include: Connected Home, Connected Vehicle/telematics, eHealth, Smart Grid, etc. Present MGHI Desire for Vertical Membership AND Participation –Agreement for equal participation, rights and position for VMPs Create environment that fosters MGHI acceptance by regional verticals Articulate Strategy and Structure for MGHI –Don’t mess with “what works” -> Address Service Layer Perspective Encourage Verticals to assist in identifying requirements relative to MGHI Gather requirements from verticals that will not be involved MGHI, while continuing to foster relationship with MGHI 2

Meeting of Potential M2M Consolidation Partners # August Seek “WIDE Spectrum” representation: Broad Regional & Industry Balance 3 3 Vertical w/Narrow “coverage” Vertical w/Broad Regional “coverage” & Industry Balance Vertical w/Regional “coverage”

Meeting of Potential M2M Consolidation Partners # August 2011 Thresholds! 4 Vertical Participation Threshold Elements: –Agreement for equal participation, rights and position for VMPs –Balance among industries represented by the VMPs is required (whether regional or global) –The ratio of regions represented by the VMPs is preferred to approximately reflect the ratios represented in M2M- Cons01(11)17 –Each regions should identify their candidate VMPs since each region has different focus, participation level, numbers of verticals, etc.