Advanced Mud System for Microhole Coiled Tubing Drilling 16-17 August 2005 Prepared for: U. S. Department of Energy-NETL Microhole Technology Development.

Slides:



Advertisements
Similar presentations
Inverted Motors for Drilling Basic Concepts and Design US and International Patented and Patent Pendings Ken Oglesby Impact Technologies LLC PO Box
Advertisements

MDT JOB PLANNING AND INTERPRETATION
Customer Service – International Dept. The thermal solar systems  Installation  Commissioning  Maintenance.
SAND CLEANING STATFJORD C FIELD TEST Stavanger 18 – 19 January 2006 Henrik Dannström, MATOR AS.
1 TIW CORPORATION A PEARCE INDUSTRIES COMPANY P.O. Box Houston, Texas U. S. A.
Environmental Drilling By: Josh Humphreys October 8,2006.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Exploring Oil & Gas. Historical Energy Use by Type of Fuel (%)
Drilling Engineering – PE311 Circulating System
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter pages
Lesson 14 Jet Bit Nozzle Size Selection
Drilling Engineering – PE 311 Drill Bit Optimization
MFET  1. Basic Principles  2. Hardware  3. Abrasives  4. Parameters  5. Capabilities  6. Advantages  7. Disadvantages.
30529 East Mill Run Milton, Delaware Fax Bruce R. Moore.
Petroleum Engineering 406
Machine Tools And Devices For Special Technologies Ultrasound machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
NFS-Cement Shield ® Process. Description NFS-Cement Shield ® Process is a dewatering system that can be applied through the drill string into any fracture.
A Noble Drilling Corporation Subsidiary TT April 19, 2001 Coiled-Tubing High Pressure Jet Drilling System Dr. William C. Maurer.
Joy Mist Drilling System Presented By: Dave Paich Joy Mining Machinery
PETE 203 DRILLING ENGINEERING
Basics of Pump Vigyan Ashram, Pabal.
Chapter 2 Hydraulics: Major Forms of water transport Gravity Flow Pumping Water Properties incompressible liquid (constant volume) Unit wt. = 62.4 pcf.
Hydraulic Fracturing 101. What is Hydraulic Fracturing? Hydraulic fracturing, or “fracking”, is the process of drilling and injecting fluid into the ground.
Introduction to Underbalanced Drilling Technology(M2)
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Confidential to SMD JIP
Specifying Pumps. Prepared by Martin Ryan, 2013 Training Series: Using Aspen Technology Economic Evaluation Suite.
New Fluid Solutions, Inc. NFS-BlackSeal ®. Overview Generally, the types of formations that are prone to lost returns are cavernous and vugular, naturally.
DIFFERENTIAL MANOMETER
Machine Tools And Devices For Special Technologies Water Beam Machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
MER Design of Thermal Fluid Systems Pumps and Fans Professor Anderson Spring Term
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
Principal Investigators: Ding Zhu and A. D. Hill
“DRILLING” MIDDLE EAST TECHNICAL UNIVERSITY
Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System
ABRASIVE JET MACHINE.
Areas of Operations, Service Centers and Opportunities Corporate Headquarters Lafayette, LA Gulf of Mexico Support Maurice, LA
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Petroleum ExplorationPetroleum Exploration Challenges with Corrosion, Abrasion, and PressureChallenges with Corrosion, Abrasion, and Pressure Materials.
Under-balanced well bore cleanout and production evaluation technology.
NFS-Super Squeeze™ “The Hole-In-One” Process. Description NFS-Super Squeeze™ Process is a dewatering system that can be applied directly into the well.
Development of an API Specification for Float Equipment API Spec 10 F.
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 9 Gasified Liquid Hydraulics Read: UDM Chapter 2.7 pages
WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water.
Drilling fluid separation & it’s environmental issue
Hydraulic Fracturing or Fracking. Process -Drill horizontal line -Charges detonate blasting small holes in the shale -Pressurized fluids are pumped into.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Topic 8: Fluid Systems Mix and Flow of Matter. Topic 8: Fluid Systems Mix and Flow of Matter.
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
1 Teaching Innovation - Entrepreneurial - Global The Centre for Technology enabled Teaching & Learning, N Y S S, India DTEL DTEL (Department for Technology.
oil Housing Drilling Floor Derrick Conductor 30” (or 36”) (Jet Cleaning.
Click to edit Master subtitle style Fluid Power Introduction All Images reprinted with permission of National Fluid Power Association.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Group2 : liquid materials
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Hydraulic Fracturing 101.
SUSTAINABLE DRILLING OF OIL & GAS WELLS
QC checks on composition
TUHWALP Introduction Cem Sarica.
Planning, Design, and Installation of a Successful Water Management System to Support a Development Drilling and Completion Campaign D. Steven Tipton,
Water Treatment.
Сase #1 Well Pump Review Almaty 2018.
1.2 Fluids.
ME Consultancy Services
Gases Fastest Moving Particles Not definite shape Not Definite volume
QC checks on composition
Dose in l/h clean liquid
Fluid samples from gas condensate wells are needed for two main reasons: To provide PVT data for developing a fluid model such as an EOS and/or black-oil.
QC checks on composition
Presentation transcript:

Advanced Mud System for Microhole Coiled Tubing Drilling August 2005 Prepared for: U. S. Department of Energy-NETL Microhole Technology Development Prepared by: Bandera Petroleum Exploration LLC IMPACT Technologies LLC IMPACT Technologies LLC Under Contract: Solicitation No. DE-PS2-03NT15392 Contract No. DE-FC26-04NT15476 CFA No

Bandera Petroleum Exploration LLC Bruce Galbierz, P.E. - Principal Investigator X105 IMPACT Technologies LLC Ken Oglesby, P.E

Project Results (Budget Phase 1) Defined Mud Types and Properties suitable for MHT Defined Hydraulics Geometries and Conditions for MHT - Set envelope of operating parameters Developed Abrasive Slurry Jet (ASJ) Drilling System Evaluated and Identified Pumps suitable for MHT and ASJ Evaluated and Identified Mud Processing Equipment suitable for MHT and ASJ Explored non-traditional components and methods for the Mud System

and Well control

MHT Mud System Specifications Hole Specs: 3.5” hole; 5000’ TVD; 1000’ lateral Hole Specs: 3.5” hole; 5000’ TVD; 1000’ lateral Pump Flow Rate and Pressure Specs: Pump Flow Rate and Pressure Specs: psi; psi Flow Back Processing Specifications: Flow Back Processing Specifications: 500 gpm water based, oil based and gasified fluids Other Parameters: Other Parameters: Mix, circulate, clean and store 200 bbls water / diesel muds Mix, circulate, clean and store 200 bbls water / diesel muds Mud- types/function Mud- types/function Zero Discharge – “no fluids hit the ground” and Zero Discharge – “no fluids hit the ground” and “solids / liquids can be hauled” HSE Considerations HSE Considerations

Kemtron KTL48 Dual shaker Dual cones

Mud System Evolving Technologies Abrasive Slurry Jetting - ASJ High Pressure Slurry Pump Modular non-steel tank & piping Composite Coiled Tubing Sintered Carbide Surfacing Grind, Slurry & re-inject fluids & cuttings Clear water only discharge GLCC plus Horiz Directional Drilling/ Trenchless Ground TPO Liner

Results and Discussion Pumps Evaluated Kerr 3500 series National JWS185 Gardner Denver TEE series Tulsa Triplex TT series