INTEGRATED PROCESSES FOR TREATMENT OF BERKELEY PIT WATER ACTIVITY III, PROJECT 21.

Slides:



Advertisements
Similar presentations
Phosphate-Based Treatment of Contaminated Land in Jasper County, Missouri Missouri Department of Natural Resources –David E. Mosby, RG
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Biotechnology for Metal bearing materials in Europe
H-KNOW NMP Advanced Infrastructure for Knowledge Based Services for Buildings Restoring Project Overview FSMLR/LABEIN Dr. Mikel Sorli.
1. About us Ambiotek SpA, is a spin off from Universidad de Santiago de Chile, that develops and offers environmental solutions for the mining industry.
BoRit Superfund Site Timeline
Part III Solid Waste Engineering
SESSION: DEICER MANAGEMENT SOLUTIONS Salt Management Research in Virginia Jimmy White, Virginia Center for Transportation Innovation & Research The Virginia.
EVALUATION OF METHODS AND MODELS USED TO PREDICT WATER QUALITY AT HARDROCK MINE SITES: SOURCES OF UNCERTAINTY AND RECOMMENDATIONS FOR IMPROVEMENT Ann Maest,
Machine Learning and Data Mining Course Summary. 2 Outline  Data Mining and Society  Discrimination, Privacy, and Security  Hype Curve  Future Directions.
29 August 2013 AMD Debate Technical solutions and funding models for the Acid Mine Drainage problems of South Africa.
1 REFINERY OILY RESIDUALS COST MINIMIZATION STRATEGY DSM ENVIRONMENTAL SERVICES, INC. P.O. Box Houston, TX (281)
Green Remediation An Overview of the State of the Practice
SolidWorks Simulation. Dassault Systemes 3 – D and PLM software PLM - Product Lifecycle Management Building models on Computer Engineering Analysis and.
INDUSTRIAL & SYSTEMS ENGINEERING
Chapter 6 Database Design
Lecture 13 Revision IMS Systems Analysis and Design.
__________________ Engineering Education Systems for Environmental Project Management - Example of the Amise Simulation Program François Baillon School.
Objectives Explain the purpose and various phases of the traditional systems development life cycle (SDLC) Explain when to use an adaptive approach to.
6 Chapter 6 Database Design Hachim Haddouti. 6 2 Hachim Haddouti and Rob & Coronel, Ch6 In this chapter, you will learn: That successful database design.
Data Mining By Andrie Suherman. Agenda Introduction Major Elements Steps/ Processes Tools used for data mining Advantages and Disadvantages.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
“Advanced sorbent solutions for the environment.” © 2003, all rights reserved Demonstration of Amended Silicates™ for Mercury Control at Miami Fort Unit.
CSM/CNA UNO R&D Proposal Lee Petersen –CNA Consulting Engineers Mark Kuchta –Colorado School of Mines Requested budget: $200k/year for two years Cavern.
Overview of the Database Development Process
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
ATMOTERM Corp. 4 Langowskiego Street Opole POLAND tel fax DOWNLOAD FREE SOZAT.
IST 210 Database Design Process IST 210 Todd S. Bacastow January 2005.
1 Chapter 9 Database Design. 2 2 In this chapter, you will learn: That successful database design must reflect the information system of which the database.
Week 4 Lecture Part 3 of 3 Database Design Samuel ConnSamuel Conn, Faculty Suggestions for using the Lecture Slides.
Mining Remediation Technology Developments and Information Resources NATO Workshop: September, 2003 Walter W. Kovalick, Jr. Ph.D. Technology Innovation.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Chemical Treatment Precipitation and Reduction/Oxidation (Section 9-4)
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Evaluation of Non-Traditional Sources of Cooling Water Sujoy Roy and Michael DiFilippo Tetra Tech Inc, Lafayette, CA and MND Consulting, Berkeley, CA EPRI.
Systems Analysis and Design
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Development of Methodologies for Independent Verification and Validation of Neural Networks NAG OSMA-F001-UNCLASS Methods and Procedures.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
AWAST Kick-off meeting - Orléans, February 12-13, 2001 Workpackage WP7 Model integration Simulator development and Validation u Integration of the models.
Systems Analysis and Design in a Changing World, Fourth Edition
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Waste Program Monitoring Technology Needs and the 21M 2 Effort ETC Brownbag Thursday, May 19, 2005 Daniel Powell, U.S. EPA Office of Superfund Remediation.
Data Mining BY JEMINI ISLAM. Data Mining Outline: What is data mining? Why use data mining? How does data mining work The process of data mining Tools.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Tools and Technologies for Mining Site Remediation Michele Mahoney US Environmental Protection Agency Office of Superfund Remediation and Technology Innovation.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Covering Key Aspects  Technical  Environmental  Economic August 8, 2008 EthanolRecycle PaperRecycle.
Chapter 8 - Integrative Process
Water Quality Monitoring in Michigan, : A Decade of Program Evolution By: Gerald Saalfeld, MI Department of Environmental Quality.
Continual Service Improvement Methods & Techniques.
IST 210 Database Design Process IST 210, Section 1 Todd S. Bacastow January 2004.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Laboratory Decommissioning : Essential Tools and Lessons Learned Jim Carscadden Division of Environmental Protection Office of Research Facilities.
Brine Concentration Pilot Project (AquaSel) Update
Innovations and Demonstration of Novel Mine Water Treatment Technologies Dr Jo Burgess Research Manager: Mine Water Treatment and Management Water Research.
BANKING INFORMATION SYSTEMS
REMOVAL OF THALLIUM FROM WASTEWATER
Chapter 6 Database Design
Specialized Short Course on for Water and Wastewater Treatment
UNIT No- III- Leverging Information System ( Investing strategy )
Mageleka MagnoMeter™ XRS
Indiana Finance Authority (IFA)
Modeling Water Treatment Using the Contaminant Transport Module
Presentation transcript:

INTEGRATED PROCESSES FOR TREATMENT OF BERKELEY PIT WATER ACTIVITY III, PROJECT 21

BACKGROUND  The Berkeley Pit (Butte, Montana) - is currently filling at a rate of 3 million gallons per day of acidic, metals laden water  EPA issued a Record of Decision in 1994; the Berkeley Pit will be allowed to fill until approximately 2021, at which time the water level will approach the Critical Water Level

BACKGROUND (cont.)  Treatment technologies will be revisited approximately 2009; treatment required essentially forever  ROD designated hydroxide precipitation with aeration (followed by reverse osmosis if necessary) as preferred treatment technology  Over 1000 tons per day of dewatered sludge will be produced

PROJECT CONCEPT  Value of contained metals presents opportunity for offsetting treatment costs via product recovery/resale  Acid mine drainage a worldwide problem  Project will evaluate both proven and new technologies for optimizing overall economics of producing compliant water

PROJECT CONCEPT (Cont’d.)  All aspects of problem will be included  Challenges Distance of Butte, Montana from markets Dilute feed stream (though extremely contaminated) Low-value base metals present

CURRENT PROJECT SCOPE  Develop two optimized flowsheets Water Treatment-Only Water Treatment-Plus-Product Recovery If results economically attractive, pursue pilot testing of optimized product recovery process at Berkeley Pit

CURRENT PROJECT SCOPE (Cont’d.)  Major Tasks Prepare standardized cost-estimating methodology Develop optimization strategy (identify/prioritize potential process improvements )

PROJECT STATUS AS OF APRIL 2000  Work plan complete  Conceptual design of sludge repository complete  Cost estimating methodology document complete  Document verifying technical and cost aspects of reference flowsheets complete  Optimization strategy in development  Preliminary optimization efforts underway (gathering cost/technical data applicable to both flowsheets)

PROJECT SCHEDULE  Final report describing optimized flowsheets due for publication in November 2000

IMPROVEMENTS IN ENGINEERED BIOREMEDIATION OF ACID MINE DRAINAGE A ctivity III, Project 24

Project Objectives Objectives for improvements of engineered features of a passive SRB-bioreactor include:  Selection of media  Design of a permeability and contact time enhancing system (PACTES),  Design of an organic carbon replaceable cartridge system (RCS),  Development of computer software to model SRB bioremedial processes in the bioreactor.

Scope of Work The scope of work of the project includes seven tasks: Task I Selection of organic carbon media that:  is permeable when saturated with water,  contains sufficient mass of organic carbon to minimize treatment rates, and  Could be economically used for passive SRB bioreactors.

Scope of Work, cont. Task II PACTES design, evaluation through a bench test study, and implementing it in the field. Task III Designing of an organic carbon RCS that would be easy to install and replace in a bioreactor at a remote location.

Scope of Work, cont. Task IV Development or adaptation of computer software to model SRB bioremedial processes in the bioreactor. This task includes efforts on:  Software development and validation  Lab experiments for bioreaction kinetics

Scope of Work, cont. Task V Implementation of the results of the four previous tasks in a bioreactor constructed for this purpose. Task VI Project management activities. Task VII Site selection and characterization

Status of Work (as of 03/31/00) Task I was initiated in February,  Data base structure is 60% developed.  Search of information is advanced approximately 30%.

SLUDGE STABILIZATION Activity IV ; Project 2

OBJECTIVE  Formation, properties and stability of sludge generated during treatment of acid mine waste water  Physically and chemically characterize sludges  Study the stability of sludges created by treatment techniques  Apply to acid mine water Point source Non-point source

Stabilization Techniques will be Developed for Hazardous Sludge  Commonly used additives for metallurgical waste solids  Thermal Processing Effective for arsenic bearing waste  Recovery of metal values or removal of hazardous constituent/recycling to metallurgical processes In particular, sulfide sludge

DEMONSTRATION OF ARSENIC REMOVAL TECHNOLOGY Activity IV ; Project 5

OBJECTIVES  Remove Arsenic from Solution  Characterize Solid Products  Determine Stability During Storage

CONCEPT  Produce an apatite mineral-like structure with the substitution of arsenate for phosphate in the structure

REMOVAL OF ARSENIC FROM WASTE SOLUTIONS WHAT IS WRONG WITH SIMPLE LIME PRECIPITATION??

EPA’s BDAT FOR As BEARING WASTEWATERS  Ferrihydrite precipitation is an adsorption phenomena  Potential Problem Long-term storage

ASARCO DEMO RESULTS  Scrubber Blowdown Water >3,000,000 ppb As to <10ppb As  Thickener Overflow 6,000 ppb As to <15 ppb  Long-term Aging Presently Being Conducted (ASARCO and Mineral Hill Products)

MINE WASTE BERKLEY PIT LAKE CHARACTERIZATION PROJECT Activity IV ; Project 8

CHARACTERIZATION PROJECTS  DEPTH PROFILES  ORGANIC CARBON  SRB ACTIVITY IN SEDIMENTS  SURFACE WATER REACTION KINETICS

SUMMARY  Berkley Pit Lake system is complex and requires much more research to fully understand  Knowledge gained through work on Berkley Pit may be used on other pit lakes through out the world

Artificial Neural Networks As An Analysis Tool for Geochemical Data Activity IV ; Project 14

WHY USE NEURAL NETWORK? TO SORT THROUGH OR ANALYZE VERY LARGE DATA VOLUMES NN’s basically think like the human brain

ALGAL REMEDIATION DATA OF BERKELEY PIT  4 Classes of Data with 15 Samples  Within each class, 5 subclasses exist with 3 samples each

Self- Organizing Map  Groups Data According to Trends Within the Data  For Algae, the SOM Output Compared to Known Data Classes NOTE: Neural Networks can also be used to predict data

Future Possibilities for NN Analysis of Algae  Look for behavior trend within Algae species  Compare similarities and differences  Train network to recognize different Algae species and concentrations  Develop network to predict Algae types and concentrations from pit-water metal concentrations