EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC,

Slides:



Advertisements
Similar presentations
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Advertisements

International Atomic Energy Agency IX.4.3. Waste management.
Seminar on ESS29 November Seminar on neutron research centre in the Øresund region (European Spallation Source) 29 November 2002.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
1 RADIOACTIVE WASTE MANAGEMENT (PART 1) A RAHMAN RWE NUKEM Ltd (UK)
Radioactive Waste Management Problems and Trends of Development (Georgian case) Giorgi Nabakhtiani Georgian-German Science Bridge, Workshop 6-12July, Tbilisi,
Legacy Waste Retrieval And Treatment Processing Methods At RSRL Harwell Site Author : Marc Rigby Presented by : Malcolm Adam 28 th May 2009.
Life Cycle Assessment (LCA)
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
1 Financial Aspects of a Decommissioning Project Massaut Vincent, Noynaert Luc SCKCEN Noynaert Luc, SCKCEN, chapter 5.
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the contracts TW5- TSW-001 and -002 Garching. January 17 th, 2006 Final Meeting of the contracts.
Update on progress with development of DS459
Life Cycle Analysis. Topics  Definition  Use  Process  Limitations.
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
SAFESPUR 9/7/08 1 Innovation in Nuclear Decommissioning: New Technologies and Research, SAFESPUR Forum, July 9, 2008 G.R. Elder Bradtec Decon Technologies.
TW4-TSW-002/D4: Studies on possible concrete detritiation Johan Braet, John Seghers, Kris Dylst Final Meeting of contracts TW3 and TW4 17 January 2005.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Rank the picture below the Core on the template slide Slide title 36pt Slide subtitle 18pt Safespur Presentation Johan Langham, Project Engineer, Studsvik.
Vincent MASSAUT Meeting 28/03/ Meeting on Revision of the Occupational Radiation Exposure assessment for the Port-Interfacing Systems (WBS5.0) Garching.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
KoM meeting 09 Oct 06 Kick-off-meeting of EFDA TW6-TSL-002 contracts , , , Oct 2006 Kick-off-meeting of EFDA TW6-TSL-002.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
Study on recycling of fusion activated materials: Identify activation levels, characteristics and decay time requirements of irradiated material (deliverable.
1 TW4-TSW-001/D1c: Watching brief activities in the field of radioactive waste management: Detritiation K. Dylst, J. Braet, A. Bruggeman SCKCEN Final meeting.
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 Design for Remanufacturing and Reverse Logistics
PRODUCTION LOGISTICS Introduction Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Auto Sector Life Cycle Management Methodology Presented by William E. Franklin and Beverly J. Sauer.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the Tasks TW5-TSW-001, 001B, October 2006, UKAEA, Culham, UK Final meeting tasks TW5-TSW-001,
8/18/2010Robert Fairchild LBNL Metals Moratorium Robert Fairchild Lawrence Berkeley National Lab Radiation Protection Group ASW-2010 Metals Moratorium.
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
MONITORING MEETING EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste Management TW5-TSW-001 Mol, June.
Vincent MASSAUT 24/10/ of ? slides Final meeting tasks TW5-TSW-001, -001B, -002 Recycling issues Introduction V. Massaut October 2006 UKAEA,
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK,
CS451 Software Implementation and Integration Yugi Lee STB #555 (816) Note: This lecture was designed.
Safety-related Issues for the Disposal of Intermediate Level Waste (ILW) Dr. Jürgen Wollrath Federal Office for Radiation Protection (BfS) Department Safety.
1 TW6-TSW-003 Kick off meeting EFDA Garching October 9 th, Kick off meeting TW6-TSW-003-D1 Watching activities: Study and analysis of detritiation.
International Atomic Energy Agency IX.4.2. Principles of radioactive waste management Basic technical management solutions: concentrate and contain, storage.
1 CIWMB E-Waste Update CIWMB Working Group December 2001.
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin.
TDR CH 12 PUNCHLINES D. Ene TDR INTERNAL REVIEW Lund, Sweden
Revision of ORE assessment for port-interfacing systems – Garching, Comments from EFDA Physics Integration 1 Main recommendations Comments from.
DRAFT REGULATIONS ON END-OF-LIFE VEHICLES Public Consultation Waste Management Unit Malta Environment & Planning Authority (MEPA) End-of-Life Vehicles.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Garching, January 17th, 2006: L. Ooms EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste management.
HISER-project WP4 – case studies Task 4.3 Subtask Eric van Roekel (STRUK) General Assembly Orleans 18 and 19 February 2016.
Preliminary Decommissioning Plan for the Canadian Light Source
Management of Radioactive Waste
Update of 2017 Activities of the ENVIRONET NORM Project
Consultants’ Meeting to develop a guidance document on management of large amounts of radioactive waste after an emergency situation 04, Feb. – 08, Feb.
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
LIFE CYCLE ASSESSMENT.
GNI Advanced Reactors Safeguards Analysis & Findings
Partner Implications from Seminar: New Approaches to Capacity Development Break-out Group: Role of Assessment frameworks.
Introduction: IAEA activities / Documents on human intrusion
TM TM on the Safe Disposal of Intermediate Level Waste
Presentation transcript:

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC, STUDSVIK, SCKCEN, UKAEA EFDA-CSU Garching

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 2 Aims of the meeting For task -001B (art.5.1.b): q to define how the results will be reached For task -001 (art.5.1.a): q To define clearly what is expected from this task q To review the work already done in the past q To coordinate the different subtasks and deliverables q To define how the results will be reached for each subtask q To try to detect potential difficulties q Planning, schedule, reference documents, actions For task -002 (art.5.1.a): q D1: (changes in IAEA clearance ref. doc) : reference documents, way of action q D2: (3D Alara planning tool): definition of the tools, needs and applications; how to apply it for a fusion example

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 3 Task TSW-001: Recycling Fuel cycle Secondary Waste Contaminated materials Decontaminate Detritiate Secondary Waste Recycle Free release Activated materials Waste Disposal Storage Recycle Secondary Waste Detritiate maybe need to detritiate here

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 4 Feasibility of recycling what are the issues ? It is not obvious that all the materials and parts can be recycled The radioactivity is not the only parameter leading to recycle or not Recycling “noble” or valuable materials involves also other challenges (separation, metallurgy, refining, machining, joining, leak-tightness, changes in properties,…) What is the experience in remote handling for all these steps (dismantling – separation – raw material processing – machining and fabrication) Are there needs for further R&D (like e.g. mechanical testing of reused material)

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 5 Therefore it was proposed to work in steps Define components and materials involved; Determine volumes & masses+ properties + main boundary conditions Define activity limits for the dismantling, (melting), fabrication or reuse (&waste ) Define duration before recycling, activation of materials and decay time (depending on parts & components concerned) Estimate storage capacity needed or limits. Compare with existing storage facilities. Summarize the whole process and cycle Category of wastes (based on international standards) and on results of the cycle analysis Define the categories of materials based on the different routes in the cycle Define the needed R&D

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 6 How are the steps linked together ? Store for decay Recycle How long? waste Sort & separate how to manufacture? radioactive buildup? mech & phys properties changes? secondary waste How? selective decay? capacity Refine, Manufacture, Assemble, Test, Qualify Detritiation to be foreseen somewhere

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 7 The waste and recycling aspect is of very high strategic importance the claim on low radioactive waste production from fusion must be substantiated and based on solid analysis the recycling process is the main part of the waste minimization process recycling materials always produces secondary waste; it should be interesting to know which proportion these waste represent the sorting and classification of materials cannot be based on the radiation level alone

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 8 Agenda of the meeting 9:00Welcome and presentation of the meeting objectives and agendaW. Gulden, V.Massaut, EFDA 9:15Clarification of the intended task 2005 objective and outcomeV.Massaut, EFDA Task TW5-TSW-001: Recycling 9:30Complex Recycling of fusion rector material (Art.5.1.b)R. Pampin (UKAEA) R. Bestwick (NNC) 9:50ENEA part of the Art.5.1.a. task, and reminder of former results and reportsL. DiPace, ENEA 10:15 Coffee Break 10:30SCK part of the Art.5.1.a. taskL.Ooms, SCK 10:50VR part of the Art.5.1.a. taskK. Brodén, VR 11:10UKAEA part of the Art.5.1.a. taskR. Pampin, UKAEA 11:30Methodology of work – Reference documentsAll 12:00Planning, Schedule, Summary, ActionsAll 12:30Lunch 13:30Concluding results from the morning sessionAll Task TW5-TSW-002: Watching Brief Activities 13:45 D1: Implications from differences between IAEA TECDOC 855 and RS-G-1.7K. Brodén, VR 14:05 D2: Report on Alara planning tool in decommissioning & applicability to fusionF. Vermeersch, SCK 14:45Methodology of work – Reference documentsAll 15:10Planning, Schedule, Summary, ActionsAll 15:30Review of all actions and plans; Wrap upAll 16:00Closure of the meeting