© ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008.

Slides:



Advertisements
Similar presentations
A Spanish Technology Platform for Sustainable Chemistry SusChem-ES: An example of a National Technology Platform for Sustainable Chemistry. Mª Eugenia.
Advertisements

9 November 2007 Cecilia de la Rosa Head of the Internal Quality Unit How to prepare for an external review Current trends in the European Quality Assurance.
European Network on Roma Community and Social Inclusion Proposal for the Operational and Organisational Structure Sevilla, 24 & 25 January 2008.
Virtual Collaborative Social Living Community for Elderly Kick Off Event Partner Instituto Pedro Nunes Paulo Freitas – António.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Project Overview Enhancing Information and Communication system in GEFONT - Buddhi Acharya GEFONT.
© ITC-AICE, 2008 E! 3792 ENIWEP TRIBOSTAND Management issues run by the Spanish group.
Workpackage 0 (WP0): Management of project
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
© ITC-AICE E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Paris 16 th January 2009.
Decentralised and Remote Access to Confidential Data in the ESS (ESSnet DARA) Overview and State of the Art Maurice Brandt Destatis FIRST EUROPEAN DATA.
Rimantas Ramanauskas Kazys Maksvytis Alvydas Janulevičius State Enterprise Centre of Registers INTEGRATED PROCESSING OF DIGITAL CADASTRAL DATA IN LITHUANIA.
AWARE PROJECT – AGEING WORKFORCE TOWARDS AN ACTIVE RETIREMENT Alberto Ferreras-Remesal Institute of Biomechanics of Valencia IFA 2012 – Prague – May 31th.
1 ENISA’s contribution to the development of Network and Information Security within the Community By Andrea PIROTTI Executive Director ENISA Cyprus, 28.
European Association of Aerospace Industries Paola Chiarini Bordeaux, 17 th January 2003 Project Manager AeroSME AeroSME Project The AeroSME Project a.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 1 Introduction TEAMwork TEAMwork Project (IST )
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
1 Framework Programme 7 Guide for Applicants
Dr. Renke Fahl-Spiewack ]init[ AG für digitale Kommunikation SEMIC.EU – Semantic Interoperability Centre Europe.
The Preparatory Phase Proposal a first draft to be discussed.
Rome, 15 May hrs 4th ODS3F Progress Meeting, 15 May 2014, Rome ODS3F project overview Giovanni Laneve DIAEE – Università di Roma ‘La.
© GEO Secretariat Task Point of Contact: a volunteer from among the Leads, who will provide a single point of communication for all those involved in the.
Development of metadata in the National Statistical Institute of Spain Work Session on Statistical Metadata Genève, 6-8 May-2013 Ana Isabel Sánchez-Luengo.
Project NaoMitec Zbigniew Turek NCP Poland Sustainable and Safe Surface Transport Warszawa, November 22nd 2005.
Aggregate Balancing November 17, Current Process Multiple Contracts, Multiple Nominations, Multiple Imbalances and the potential for Multiple Cashouts.
Assessing The Development Needs of the Statistical System NSDS Workshop, Trinidad and Tobago, July 27-29, 2009 Presented by Barbados.
Statistics Portugal « (Quality Rome, 10 July 2008) « Simplified Business Information: « Improving quality by using administrative data in Portugal.
Validation of legal entities and financial capacity check
Third OIE Global Conference on Animal Welfare Kuala Lumpur, Malaysia The OIE PVS Pathway Dr. Mariela Varas OIE International Trade Department.
Developing Plans and Procedures
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Eurostat project Final energy consumption in households 7th meeting of Oslo Group October 2012 Helsinki, Finland.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
Aristotle University of Thessaloniki Research Committee Research Activities and Strategy 1.
Enhancing innovation in education and training for medical staff in Europe Kick-Off MEETING Želevčice, Czech Republic.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
29 January 2010 Initial Training Session for Enterprise Europe Network Members in India AGENDA Date: January 2013.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Role of the Secretariat The Secretariat will be responsible for the co-ordination and enhancement of research and networking activities within MariFish.
ACTIONS AT NATIONAL LEVEL Proposal on criteria to choose ERFP activities/projects on national (sub-regional) level Elżbieta Martyniuk on behalf of the.
Development of M.Sc. In IT Management in Construction at Damascus University Project Overview & Lessons Learned TEMPUS Project: JEP By: Dr.
Overview District Planning Local Public Health System Assessment Mark Griswold Office of Local Public Health Maine CDC, DHHS Central District Public Health.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
Carole GANDON – 6 May 2014 – Ottaxwa EAFIP Workshop The experience EAFIP Workshop d d The experience Manchester, November 24 th, 2015 Louis POTEL, Project.
MetaPlus Klas Blomqvist Statistics Sweden Research and Development – Central Methods
Sponsored by Organized by The New Zealand Aid AgencyThe Mekong Institute Khon Kaen in Thailand SME Cluster Development 14 – 25 May 2012 Compiled by Dr.
Assessment Entry Module (AEM) Kick-off November 15, 2012 interRAI Preliminary Screener Toronto Central LHIN.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
Assessment Entry Module (AEM) Kick-off November 1 or November 2, 2012.
Please read this before using presentation The Department of Mines and Petroleum (DMP) supports and encourages reuse.
Grupo de Redes y Computación de Altas Prestaciones Vicente Hernández Universidad Politécnica de Valencia Primera Reunión sobre e-Ciencia Andaluza (proyecto.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
High Level Joint Committee (HLJC) Bodies of the HLJC Main tasks and working procedures Andreas Holtkotte, Focal Area Coordinator Environment and Energy,
QUALITEASY: INTERNET SOLUTIONS FOR QUALITY MANAGEMENT University of Alcalá Universidad de Alcalá 1.
MATcHES “Roles and responsibilities of the project partners” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
PROJECT TITLE “Actions aimed to enhance the participatory role of Mediterranean small-scale fishing in the decision making and advisory processes at national.
Sales Process March 2017.
Inclusive knowledge systems for CSA
Water saving potential in agriculture in Europe
1. Mission of EGR and legal framework
Maria Teresa Capria December 15, 2009 Paris – VOPlaneto 2009
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

© ITC-AICE, 2007 E! 3792 ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21 st January 2008

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Meeting agenda 8:30 - 9:00Registration 9:00 - 9:15Welcome and introductory remarks, agenda presentation 9: :00Project overview. Presentation of the project program, review of technical objectives, activities, Gantt 10: :00Organisation and communication within the consortium and work groups, review of management structure 11: :15Coffee break 11: :00Current situation of the administrative and technical work carried out 12: :30Workpackages timetable, spacially for the first year. Meetings schedule 12: :30General conclusions

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Project overview PROBLEM: Same property measured in different laboratories with different means gives: DIFFERENT RESULTS OBJECTIVES: To yield a group of common test protocols, which will allow for obtaining the same results, under the same conditions, at any laboratory that has the required means. Once these protocols have been obtained and their validity and traceability verified, a tribological analysis and test service will be established and will enable companies from different sectors to solve their problems at any member centre of the service.

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Partners Instituto de Tecnología Cerámica (ITC-AICE) (Spain) Tekniker (Spain) Asociación de las Industrias Navarras (AIN) (Spain) Fritta S.A. (Spain) Falex (Belgium) Katholieke Universiteit Leuven (Belgium) Centrale Recherche SA - Ecole Centrale Paris (CRSA-ECP) (France) Tribotechnic (France) Departamento de Ingeniería Mecánica - Universidad de Coimbra (Portugal) Instituto Pedro Nunes - Associaçao para a inovaçao e desenvolvimento en ciência e tecnologia (Portugal) Laboratorie Dubois, S.A (*) (Switzerland) National Physical Laboratory (**) (England)

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Project diagram 1 Bibliographic search 2 Selection of tests 5 Start-up of service 6.1 Submission of protocols 6.2 Dissemination of results 7 Project management 4 Study of the tests 3 Selection of equipment and samples

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 1. Bibliographic search Compilation of standards and regulations related to the methods under study

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 2. Selection of tests Each partner to supply a list of its own non-standardised tests to be included in the project. Result of activities 1 and 2: Join list of tests to be studied

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 3. Selection of equipment and samples for performance of the tests Task 3.1List of equipment available in each Research Centre Task 3.2Round-robin intercomparison of standard materials to validate the results of all the available equipment Task 3.3Selection of samples of different types and properties to be tested by the protocols listed in activity 2 (bulk materials, coatings, different roughness, different properties, etc.)

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activities 4. Study of the tests (one per test) Task 4.1Study of the different variables affecting the results. Selection of the best values of these variables by the responsible of the test Task 4.2Testing of samples with the conditions established in 4.1 Task 4.3Round-robin intercomparison among the centres which have the technique available Task 4.4Results analysis and uncertainty calculation where applicable Task 4.5Drawing up of a common definitive protocol

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 5. Start-up of a test service Launching of a external tribological test service Creation of a Website through which the requests for tests by clients can be channelled. Creation of a catalogue detailing the tests capabilities of each member of the consortium

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 6. Dissemination of results Task 6.1Submission of protocols to standardisation committees: The relevant protocols of the tests included in the service will be submitted to the corresponding standardization committees

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 6. Dissemination of results Task 6.2Dissemination of the project results: The results obtained will be disseminated by different channels (scientific publications, conferences, fairs, ENIWEP website, etc.)

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 7. Project management Facilitate administrative tasks and notifying the consortium of due dates Preparation of technical and cost justification reports Acting as a permanent contact point for all partners and maintaining a high level of communication in the consortium Coordination of meetings Operation of a project website with a restricted area for the consortium members. At the end of the project, it will be the tool for the tests service

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Gantt diagram TASK QUARTERS OF THE YEAR First yearSecond yearThird yearFourth year H1 3.1H1 3.2H2H H4 5H H1: Tests and equipment list H2: Standards for verification of equipment. H3: Testing materials H4: Test protocols H5: Tribological analysis and test service

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Organization and communication among the consortium

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activity 4 Organization Test 1 sub-consortium Test 2 sub-consortium Test 3 sub-consortium Test “n” sub-consortium Coordinator of test 1 (tasks 4.1 to 4.5) Coordinator of test 2 (tasks 4.1 to 4.5) Coordinator of test 3 (tasks 4.1 to 4.5) Coordinator of test “n” (tasks n.1 to n.5) Coordinator of activity 4

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activities distribution suggestion 1 Bibliographic search Instituto Pedro Nunes 2 Selection of tests Department of Metallurgy and Materials Engineering –KUL 3 Selection of equipment and samples Asociación de las Industrias Navarras (AIN) 4 Study of the tests Facultade de Ciencias e Tecnologia – UC

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Activities distribution suggestion 5 Start-up of a tests service (website launche) ITC 6.1 Submission of protocols to standardisation comitees TEKNIKER 6.2 Dissemination of the project results Central Recherche S.A. – ACP 7 Project management ITC

E!3792 – ENIWEP TRIBOSTAND Kick-off meeting Castellón, 21st January 2008 |© ITC-AICE, 2007 Next meeting Coinciding with next ENIWEP general meeting?

Thanks for your attention