Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
T-980 Crystal Collimation Recent Results T-980 Collaboration: FNAL, SLAC, BNL, CERN, PNPI, IHEP, INFN D. Still CM14 April 27, 2010.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
H8-RD22 Experiment to test Crystal Collimation for the LHC Organized by: Walter Scandale Conducted at CERN Geneva, 27 September 2006 Participants included:
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
THE T980 CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON 4 th Crystal Channeling Workshop CERN, Switzerland March 24-27, 2009 Nikolai Mokhov Fermilab Accelerator.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
LARP Rotatable Collimators for LHC Phase II Collimation 18 April 2007 LARP Collaboration Meeting – Fermilab Tom Markiewicz/SLAC Representing Gene Anzalone,
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
Crystal collimation for LHC Valery Biryukov IHEP Protvino Vincenzo Guidi Ferrara University and INFN Walter Scandale CERN CERN, Geneva, 24 April 2003.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 24 April 2008 LARP CM#10 Tom Markiewicz/SLAC BNL - FNAL-
Beam Rotatable Collimators as a Possible US Contribution to the LHC Luminosity Upgrade Project 20 June 2008 LARP DOE Review Tom Markiewicz/SLAC BNL - FNAL-
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
STATUS OF T980 CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON LARP Collaboration Meeting 11 Fermilab, Batavia, IL October 27-28, 2008 Nikolai Mokhov Fermilab.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
Summary Session Advanced Collimation CARE-HHH-APD BEAM'07 R. Assmann.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
LARP Contributions to LHC Phase II Collimation
T980 STATUS AND CHANGES FOR
Ti/SS transitions A.Basti INFN-PISA*
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
SLAC RC Status Report US LHC Accelerator Research Program
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Rotatable Collimator
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
Presentation transcript:

Summary of Accelerator Systems Collimation Parallel Session 19 October 2007 LARP CM#9 - SLAC Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 2 / 8 CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON Nikolai Mokhov Fermilab Mission Statement We propose an experiment at Fermilab’s Tevatron to measure the predicted improvement in collimation efficiency that could be obtained by replacing amorphous primary collimators with bent crystals. Considering the unique possibility provided by the Tevatron Collider, and having already established fruitful collaborative efforts on crystal characterization, tests and use for collimation, we propose to test and confirm models of multi-turn dynamics with crystals by exploiting channeling and newly understood phenomena such as volume reflection as well as to further study collimation.

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 3 / Tevatron Experiment (Analysis by V. Shiltsev) Channeled beam “peak” width is 22±4  rad (rms) With E03H out, LE033C BLM is proportional to nuclear interact. rate in crystal

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 4 / Installation of Shorter Crystal with Smaller Bend and 2007 Run/Analysis Original installation had misaligned crystal Angular reproducibility for a horizontal translation of the table terrible –1 mil horizontal translation can produce an angle error of 100urad Building a new goniometer with new specifications for motion tolerance and vacuum is needed 150urad 320 urad channel Into the beam Angular motion

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 5 / 8 Other Issues with 2007 Run Noisy Losses on Detectors: Noisy losses produced on the PIN and BLM monitors look like channeling signatures. These are real effects caused by motion of the beam, effects of abort gap cleaning, etc. Solutions to these are refining operational procedures and attempting to build better orbit stabilization software around the area of the bent crystal. Improving Beam Diagnostic Capabilities –Current beam diagnostics used to detect channeled and VR beam is a PIN diode system and a Tevatron ionization style BLM. (picture in next slide) –The PIN diode is reasonable for detecting the rate of nuclear interactions at the crystal. –In order to view the channeled and VR beam downstream of the crystal better diagnostics are needed. Roman Pot style detectors have been considered and offered. Noise on BLM signals

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 6 / 8 How to Meet Mission Goals? Demonstrate high efficiency volume reflection seen in RD22 extraction line experiment in collider environment using EDGE of crystal

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 7 / 8 Plans for FY 2008: 3 Choices Beam Studies: Nothing new, keep playing around Continue to use the installed crystal assembly and strip crystal to demonstrate main goals. This may require more study time due to increased setup now that problems with goniometer have been characterized. Would like to have 2 to 3 of End of Store study periods as early as Dec to demonstrate well characterized channeling from the strip crystal now that more is understood about the goniometer motion. New Goniometer(s): No new diagnostics, but replace goniometer Start specifications and engineering for new horizontal goniometer that would replace current assembly. Currently have identified a FNAL engineer to work on this. If full 2 plane crystal collimation is going to be demonstrated that would require an additional vertical goniometer to be built. A full simulation would be required for best placement of the vertical goniometer as well locations of channeled and volume reflected beams. Beam Diagnostics: The whole enchilada: Raison d’etre for collaboration Start specifications and assessing new or additional beam diagnostics that will be needed.

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 8 / 8 Tevatron Warm Space for New Hardware Proton Set 1 D49 Tar, E03 & F172 2nd Proton Set 2 D171Tar, D173 & A0 Pbar Set 1 F49 Tar, F48 & D172 Pbar Set 2 F173 Tar, F171 & E02 F171 collimator E01 collimatorE02 collimator All these devices will have to be removed to accommodate space for new hardware These locations have additional warm space but may not be optimal.

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 9 / 8 Time Timing for Installing New Hardware: Should be stressed that any new hardware installed into the Tevatron for use in 2009 will have to be ready for the Summer 2008 shutdown. Ferrara needs 6 months minimum to fabricate goniometers and will not spend $/effort without FIRM COMMITMENT to run the experiment

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 10 / 8 COLLABORATION, LOI AND MEETING ON DEC. 6-7 Very encouraging support from LARP management Fermilab management CERN management INFN management August Accelerator Advisory Committee at Fermilab It was proposed that we prepare a Letter-of-Intent (LOI), “Crystal Collimation Experiment at the Tevatron” and form an official collaboration.

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 11 / 8 Immediate Requirement Need full realistic multi-turn simulations – for the current lattice and crystal/collimator configuration to confirm results, justify a choice of a short crystal and identify locations for comprehensive beam diagnostics (single particle tracking capability?) and second (vertical) crystal/goniometer Can this happen in time for Dec 6-7 Collaboration Meeting in sufficient detail to motivate invasive hardware installation, diagnostic construction and formation of a member international collaboration? 1)Nikolai & Sasha Drozhdin committed 2)Known to be needed in April 2007, but zero produced

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 12 / 8 Rotatable Collimators Jeff Smith beam

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 13 / 8 Design of Jaw-Shaft-Mandrel Cu coolant supply tubes twist to allow jaw rotation Hub area Glidcop Cu Mo Cantilever Mo both ends Helical cooling channels 25mm below surface 20 facets

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 14 / 8 Design of Jaw Support and Rotation Mechanism Triple Cog Geneva Drive Wheel required for 512 clicks per facet U-Joint Flexes for Shaft “sag” and “Slewing” Water Cooling Inlet and outlet

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 15 / 8 Design Complete Except for RF Features Jaw Geneva Mechanism Support Bearings Worm Gear Shaft Water Cooling Channel U-Joint Axle 1-2mm Gap Diaphragm

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 16 / 8 Current Vision of RF Transitions Spiral style backing springs reside inside “Sheath” (sheath not shown) Thin sheet metal RF “Curtain” Round to Square Transition Transition “Socket” Spherical profile “Fingers”

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 17 / 8 Up Beam end detail view away from beam side Spring flexes to maintain contact force on “Fingers” for longitudinal and lateral displacements of the Jaw ends 2 cam buttons (not shown) lift “Socket” off “Fingers” during Jaw rotation and rest in detents during collimation Jaw cooling return line

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 18 / 8

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 19 / 8 Braze Test#2 Delivered 19 Dec 2006

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 20 / 8 Vacuum Bake of Braze Test#2 Results: 4/1/07 ~3x over LHC Spec 1st Jaw Braze Test Assembly has been vacuum baked at 300 degrees C for 32 hours. LHC Requirement = 1E-7 Pa = 7.5E-10 Torr Baseline pressure of Vacuum Test Chamber: 4.3E-7 Pa (3.2E-9 Torr) Pressure w/ 200mm Jaw Assy. in Test Chamber: 4.9E-7 Pa (3.7E-9 Torr) Presumed pressure of 200mm lg. Jaw Assy.: 6.0E-8 Pa (4.5E-10 Torr) Note: above readings were from gauges in the foreline, closer to the pump than to the Test Chamber. Pressures at the part could be higher. Outcome: SLAC vacuum group has suggested longitudinal grooves be incorporated into the inner length of jaws; incorporated into next prototype

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 21 / 8 6/25/07-7/2/07 Slice & Dice Braze Test#2 ∙ Evidence of fracturing along grain boundaries presumed due to too-rapid cooldown after braze - areas near ends and OD look better ∙ Braze of jaws to hub GOOD ∙ 3 of 4 jaw-jaw brazes GOOD Interior slice: polished & etched ∙ Same fracturing patterns as in other slice ∙ Braze of cooling coils to jaw ID good ∙ Braze of cooling coil bottom to mandrel so-so Longitudinal slice

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 22 / 8 Braze Test #3: Vacuum tests 3rd Jaw Braze Test Assembly has been vacuum baked at 300 degrees C for 32 hours. Results in slightly lower pressure. Inclusion of longitudinal grooves in the inner length of jaws for better outgasing Test Chamber setup similar to previous test. OldNew Baseline3.2E-9 Torr2.4E-9 Torr?? w/ jaw assy.3.7E-9 Torr3.4E-9 Torr Presumed jaw assy. pressure 4.5E-10 Torr10E-10 Torr?? LHC requirement 7.5E-10 Torr

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 23 / 8 Braze Test #3: Sectioning & Examination Cu grain boundary cracking during brazing Specimen 140mm OD x 60mm ID x 200mm L (¼ section shown) -one braze cycle in the 900 C range -grain boundary cracks located in interior regions -believed due to excessive heating rate -Glidcop to be tested Concerns -Effect on performance -What happens in accident case?

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 24 / 8 Glidcop Al-15 Heat sample While 1st jaw used to test thermal mechanical issues is Copper, first full 2 jaw prototype will use Glidcop 2 Heats (at Jaw brazing temperature) No grain boundary cracking is apparent Metallographic samples are being prepared for microscopic inspection

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 25 / 8 Apr 6: Cu-Mo Hub Braze Test Assembly after 3 additional heat cycles (to mimic full assembly procedure) then sectioned. Cu “finger” fractured Small holes held braze wire Grain boundary issues? Possible fracturing? Cu-Mo joints we care about 1mm expansion gap Samples sliced & polished and sent to Physical Electronics lab for analysis 4/23: Fractures evident

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 26 / 8 Compression fit for Cu-Mo joint Another option is to use a compression fit and diffusion bonding. Copper Jaw is constrained on the outside diameter with Carbon and when heated to ~ 900 degrees C is forced to yield so that upon cooling to ~ 500 degrees C the inner diameter begins to shrink onto the Mo Shaft resulting a substantial interference fit. Test hub fell apart once we made a slice!

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 27 / 8 Cu-Mo joint: Segmented Moly for expansion Another option is to use a segmented flexible molybdenum end to prevent fractures and prevent Co from pulling away from Moly. Will be cutting small samples for metallurgy tests. May make slight modifications for better braze joint

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 28 / 8 Molybdenum Half Shafts & Copper Hub Halves braze preparations Expander Plug Retainer Ring

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 29 / 8 21 Mar 2007: Full length Mandrel: In-House & Inspected –Now that shaft design complete, order to bore central hole made –Will wind with in-house copper tubing

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 30 / 8 Fixture for stacking 16 24cm-long quarter round jaws on full 960mm cooling coil wrapped mandrel (mostly catalog parts: ordered)

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 31 / 8 Up Beam Flex Mount Assembly showing Ratchet and Actuator

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 32 / 8 Up Beam Flex Mount Assembly showing Ratchet and Actuator

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 33 / 8 Agreement in Progress to Buy a damaged “TCS1” collimator and stand from CERN

LARP CM October 2007Collimation Summary - T. MarkiewiczSlide n° 34 / 8 LARP Collimator Delivery Schedule DoneBraze test #1 (short piece) & coil winding procedures/hardware Prep heaters, chillers, measurement sensors & fixtures, DAQ & lab Section Braze test #2 (200mm Cu) and examine –apply lessons Braze test #3 (200mm Cu) – apply lessons learned Fab/braze 930mm shaft, mandrel, coil & jaw pieces st full length jaw ready for thermal tests Fab 4 shaft supports with bearings & rotation mechanism Fab 2 nd 930mm jaw as above with final materials (Glidcop) and equip with rf features, cooling features, motors, etc. Modify 1 st jaw or fab a 3 rd jaw identical to 2 nd jaw, as above Mount 2 jaws in vacuum vessel with external alignment features full length jaws with full motion control in vacuum tank available for mechanical & vacuum tests in all orientations (“RC1”) Modify RC1 as required to meet requirements Final prototype (“RC2”) fully operational with final materials, LHC control system-compatible, prototype shipped to CERN to beam test