AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.

Slides:



Advertisements
Similar presentations
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
Advertisements

Code P010 Date: Installation and configuration Clarity User Training.
Module 4: Analog programming blocks. Module Objectives Analyze a control task that uses analog inputs. Connect a potentiometer to LOGO! controller and.
PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
Acknowledgements Steve Beyerlein- Faculty Advisor David Atkinson- Faculty Advisor Greg Swanson- Graduate Advisor Tye Ried- Graduate Advisor Justin Schlee-
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
Craig Chan & Mike Abidoye
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Senior Capstone Project: Fast Tuning Synthesizer Member: Nathan Roth Advisors: Dr. Huggins Dr. Shastry Mr. James Jensen Date:March 4, 2004.
HA Power Supplies - Demonstration Criteria and Status February 23, ATF2 Project HA Power Supplies Demonstration System Evaluation Criteria And Status.
Low Cost, Compact Microwave Reflectometer for Non-Destructive Testing
Introduction AD620 Instrumentation Amplifier
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Progress Report on CGSE Control System Project Team of SJTU for AMS-02 Yang Yupu AMS JSC, Jan 8-12, 2007.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
MUEV Phase III By: Kevin Jaris & Nathan Golick. Introduction Petroleum is a finite resource. Demand for clean energy is driving the increase in the production.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
1 Alpha Magnetic Spectrometer – 02 Phase III Flight Safety UPS Overview Jan John A. Heilig ESCG/Jacobs.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Compressor status AWAKE Technical Board meeting 19 August 2015.
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATI PRR CERN 4 March the Embedded Local Monitor Board ELMB Design description of the Embedded Local Monitor.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
TRD GAS Progress AMS TIM, JSC, 9-Jan-2007, Th. Siedenburg MIT-LNS Box-S/C Manifolds UG Power Supply.
AMS-02 Integration Cables Status and Electrical Integrated Testing Status Tim Urban / ESCG January 10, 2007 Alpha Magnetic Spectrometer.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
CAPS FID Interface Board Midterm Presentation I Odai Ali James Owens Joshua Roybal.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
Programmable Power Supply Characterization presentation Dec. 04, 2007 Gregory Kaplan Dmitry Babin Supervisor: Boaz Mizrahi.
P /10/2 Primarion VR Chipset Up to 2 MHz switching 1 to 6 phases Reduced output cap – 100A, 1000A/us with 500uF MLCC Current sense calibration –
Teleconf ACS – FREIA 28th March 2017
Gayle K. Martin November 14, 2016
SPF MAG Quarterly Report – Feb 2015
11T Magnet Test Plan Guram Chlachidze
Unit 45: Circuits and components Dr
Circuits and components Chapter 45
The HL-LHC Circuits: Global View and Open Questions
Unit 45: Circuits and components Dr
AEGIS Magnet System.
Spectrometer Solenoid Update
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
HO Corrector Magnets: decapole test and future plans
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Current SOC-Ground System Integration Schedule (Jan )
BLOCK DIAGRAM: Micro controller.
Unit 45: Circuits and components Dr
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz

January 2007 AMS02 CAB Status Report (JSC January 2007) 2 Table of Content 1.- Cryomagnet Current Source  CCS Electrical Tests  CCS Thermal Tests 2.- CSP System  Current Lead Detector Module 3.- Valve Electronics Status  PS module  CSP PWR DRV module  CSP TM/TC 4.- CAB Schedule

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System l Activities of the CCS Current Source  CCS Current Source tested in Thermal Vacuum Chamber at CRISA facilities  CCS Set-up preparation during Weeks 48 and 49 of 2006  Electrical and Thermal Tests of CCS Current Source performed before Christmas.

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests) CCS Electrical Test Campaign (Crisa facilities)  CCS electrical design verified at different temperatures and in Vacuum.  CCS Functionality in Vacuum conditions  Good Performances of Voltage, Power and Current control loops of the current source  CCS Current Source operating in Ramp-up Sequence and Steady State  Active Load used for CCS electrical Tests  CCS operating in Short-Circuit conditions simulating Persistent Switch closed  Measured values of the CCS power dissipation similar to the typical values of the calculated power budget of the CCS.

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests) CCS Vacuum and Thermal Test Campaign (Crisa facilities)  CCS Thermal Design Validation as main objective  Hottest temperature Monitoring during Ramp-up sequence and Steady State  Additional Thermocouples included to monitor the hottest points of CCS  CCS Thermal Test Report, including description of the Thermal Model used and the correlation with CAB detailed Thermal Model, is under preparation. It will be distributed to TWG for review.

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Vacuum and Thermal Tests)

January 2007 AMS02 CAB Status Report (JSC January 2007) CCS System (CCS Pending Actions)  Protections at CCS board level  OC Protection Circuitry of the of the SR Power Supply of the 28V Interpoint CV modules  Update the UV protection values at 109V instead of 95V  Current Limitation at 95A for each CCS converter board  Add TVS at the input stage of the SC SW Protection circuitry Design, Manufacturing and Tests foreseen between Jan_07 and Apr_07  Protections at the CCS output  Crisa has assessed the need of adding TVS “Transient Voltage Suppressors” at CCS output  To foresee Transient voltages when opening the Persistent Switch at the end of Ramp up sequence or opening the SC SW in case of aborting the Ramp up sequence during a power loss  Objective: To protect the Mosfet of the SC SW during the Ramp up sequence  Electrical design is available  Physical design is on going  Calibration Procedure of the CCS Current Shunt (200  )

January 2007 AMS02 CAB Status Report (JSC January 2007) CSP system (CSP_CL_DET Board & CSP_DET_CV Board)

January 2007 AMS02 CAB Status Report (JSC January 2007) CSP system (CSP_CL_DET Board & CSP_DET_CV Board) Detection Function of the CL Voltages and Temperatures New threshold values for CL voltages and temperatures defined by SCL WARNING LEVEL (the user has time to discharge the magnet manually) l Current lead cold side: 15 mV (instead of 80mV) l Current lead warm side: 75 mV (instead of 80mV) l Current lead temperature: 155 K (instead of 250K) ALARM LEVEL (triggers a quench autonomously) l Current lead cold side: 45 mV (instead of 100mV) l Current lead warm side: 110 mV (instead of 100mV)

January 2007 AMS02 CAB Status Report (JSC January 2007) Valve Electronics Status CCSC Power Switches module  Electrical definition  Pressure and Vacuum sensors  Valve Configuration  Valve Control and Timing  Valve Power & Monitoring  External I/F  Block Diagrams of the valve control architecture  Preliminary Schematics  On going Tasks (Electrical Design Revision, WCA, PSA) in Dec06 and Jan07  PCB Physical design foreseen in Jan/Feb 2007  PCB Manufacturing in Feb/March 2007  Board Population in March 2007  CCSC Power Switches board Tests in April 2007

January 2007 AMS02 CAB Status Report (JSC January 2007) Valve Electronics Status  CSP Power Drivers module  CSP TM/TC module  Electrical definition  Valve Configuration (Control, Timing, Power and Monitoring)  External I/F for the valves  Block Diagrams of the valve control architecture  Preliminary Schematics  RDS and AQS sequences updated  Update of the FPGA_CSP technical Specification in Dec06/Jan07  Power control of the CD & CL TMP heaters  CSP PWR DRV module  Design of the FPGA_CSP foreseen for Feb/March 2007  Pending Tasks (Electrical Design Revision, WCA, PSA) in Jan 2007  PCB Physical design foreseen in Feb 2007  PCB Manufacturing in Mar 2007  Board Population in Apr 2007  CSP board Tests in May 2007

January 2007 AMS02 CAB Status Report (JSC January 2007) CAB Schedule  The current schedule provides the following delivery dates  CAB EM pending boards  To be finished May 2007  CAB EM model: 31 July 2007  CAB EM model Integration Tests at Culham, from 17th Sep 2007 (TBC)  CAB Flight model: 20th May 2008

January 2007 AMS02 CAB Status Report (JSC January 2007) CAB Schedule