PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.

Slides:



Advertisements
Similar presentations
Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
The ATLAS Pixel Detector
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Silicon Stripixel Detector Junji Tojo RIKEN Vertex2005 Lake Chuzenji, Nikko, Japan November 7-11, 2005.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Performance of PHENIX High Momentum Muon Trigger 1.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Frontend of PHENIX Si pixel K. Tanida (RIKEN) FEM/DAQ meeting for PHENIX upgrade (10/24/02) Outline Overview of PHENIX Si pixel detector ALICE1 chip readout.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
1 Jan Conrad (CERN) PSD Liverpool, Sept (CERN) Beam Test Performance and Simulation of Prototypes for the ALICE Silicon Pixel.
Silicon Vertex Tracker (VTX) for PHENIX Experiment at RHIC Y. Akiba (RIKEN) for PHENIX collaboration Detector Advisory Committee Meeting November 22, 2003.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
BNL-Nuclear Physics Seminar Rachid Nouicer 1 Brookhaven National Laboratory Research Affiliate of RIKEN-BNL Research Center New Era of Heavy Flavor Measurements.
The PHENIX Forward Silicon Vertex Tracker Eric J. Mannel IEEE NSS/MIC October 29, 2013.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
1 Silicon Vertex Detector at PHENIX Atsushi Taketani RIKEN / RBRC 1.Physics Goal 2.Detector Concept 3.Structure 4.Pixel detector 5.Strip detector 6.Summary.
13 January 2004V. Manzari - Quark Matter Oakland1 The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Spin Physics with the PHENIX Silicon Vertex Tracker Junji Tojo RIKEN for the PHENIX Collaboration Advanced Studies Institutes - Symmetries and Spin July.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
International Workshop on Radiation Imaging Detectors, Glasgow, July 25-29, 2004 Johann M. Heuser, RIKEN for the PHENIX Collaboration - RHIC and PHENIX.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
AB c CEBAF Hall D ASIC Needs in Nuclear Science T. Ludlam Brookhaven National Lab 1 RHIC.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
Si Sensors for Additional Tracker
Progress with System Integration of the CBM Silicon Tracking Detector
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Evidence for Strongly Interacting Opaque Plasma
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
WG4 – Progress report R. Santoro and A. Tauro.
Maki KUROSAWA VTX Group 2014 Feb 20
Silicon tracker and sensor R&D for sPHENIX
TPC electronics Atsushi Taketani
The CMS Tracking Readout and Front End Driver Testing
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline 1.Detector Hardware 2.Installation and Peripheral 3.Operation and Physics result 4.Issue and repair work 5.Summary History First proposal Start Construction Beam test at FERMILAB Barrel assembly start Installed and operation start 1

Detector and Hardware 2

3 Requirements for Vertex Tracker High precision tracking for displaced vertex measurement. – c  ~ 100  m(D), ~400  m(B) Large coverage tracking capability with momentum resolution (|  |<1.2, and full azimuthally with  /P ~ 5%P) High charged particle density ‘dN/d  ’ ~  =0 ~ 2000 Tracks High Radiation Dose High Luminosity 2*10 32 cm -2 s -> High rate readout Low Material Budget <- avoid multiple scattering and photon conversion for electron measurement by outer detectors. Physics side Environment side Heavy Ion collision and polarized proton-proton up to CMS 200 / 500GeV

Silicon Vertex Tracker e+e+ ee VTX: Silicon Barrels ~ 2  Layer 0 Layer 1 Layer 2 Layer 3 Life time (c  ) D 0 : 123  m B 0 : 464  m DCA p p D B e e pixel 0 pixel 1 Strip 2 Strip 3 Berylium beam pipe Pixel : inner 2 layers and Stripixel: outer 2 layers 4

Full ladder ~4mm Pixel bus Pixel sensor modules Pixel stave (with cooling) Pixel detector = inner 2 layers of VTX 1 st layer: 10 full pixel ladders = 20 half ladders = 40 sensor modules 2 nd layer: 20 full pixel ladders = 40 half ladders = 80 sensor modules 5 Pixel Detector SPRIO 57mm (32 x 4 pixel) 13mm 256 pixel Sensor module 50  m x 425  m 5

PIXEL (Sensor and Readout, bump bonded) Pixel size(  x z ) 50 µm x 425 µm Sensor Thickness 200  m  r  = 1.28cm,  z = 1.36 cm (Active area) 256 x 32 = 8192 channel / sensor 4 chip / sensor 4 sensor / stave Total 4M Pixel Readout by ALICE_LHCB1 chip Amp + Discriminator / channel Bump bonded to each pixel Running 10MHz clock ( RHIC 106nsec ) Digital buffer for each channel > 4  sec depth Trigger capability > FAST OR logic for each crossing 4 event buffer after L1 trigger 6

Reaout overview In order to meet the PHENIX readout speed requirement, parallel readout (4 x 32 bit) was made. Analog Pilot ASIC Analog Pilot ASIC Digital Pilot ASIC Digital Pilot ASIC FPGAFPGA GOL OE / EO CTRL CLK DATA bit parallel 4 x 32 bit at 10 MHz Number of data lines is 128 ( 4 x 32 bit) Readout time is 256 (  ) x 2 chips x 10 MHz = 51.2  s Readout scheme SPIRO Module Digital Pilot Chip Receiving 4 x 32 bit data from R/O chips Sending data to FPGA Controlling R/O chips Analog Pilot Chip Supplying reference voltage for R/O chips. Monitoring supply, bias voltage and temperature on the detector. GOL : Transmit data with 1.6 Gbps FPGA Digital Pilot Analog Pilot GOL OE / EO Digital PilotAnalog Pilot GOL 7

8 Bus structure Power 50  m Al GND 50  m Al 6 layers structure GND, Power and 4 signal lines Signal 2; (Vertical line) line connected with pixel chip with wire bonding Signal 4; (for manufacture reason) Signal-4 3  m Cu Signal-3 3  m Cu Signal-2 3  m Cu Signal 1; (for Surface Mount Device) Signal-1 to Signal-4 are connected with through hole Signal lines; 60  m pitch Material Budget; Total ~ 0.26 % Final configuration Signal-1 3  m Cu Signal 3; (Horizontal line) send signal to Pilot Module connected with vertical line with through hole Thermo-plate Sensor module Wire bonding Al Power Al GND Through hole Signal layer Total 188 lines 25cm long 1.4cm wide 8

Procedure 3 3. Align each sensor module 5μm 9

Encapsulation of wire Side view of bonding wire Wire has intermittent current due to readout synchronized the level 1 trigger. Wire vibrates in magnetic field and may break Cross section stave sensor Bonding wire barrier Potting glue 1mm No encap ~ 5.9KHz Resonance 10

Installation and Peripheral 11

12 Layer 0 (PIXEL) 5 ladders Layer 1 (PIXEL) 10 ladders Berylium beam pipe Completed and installed on

VTX System 13 Chiller Thermo - sensor FEM Optical cable Power Supply Interlock System Pixel/Strip Detectors Flow Sensor Cooling tube Power cable Sensor cable To remove power dissipation 1560W/VTX, need to cool down pixel/strip detectors. To avoid detector destruction by heating, need safety interlock system Interlock trips off power supply by temperature and flow of coolant. 13

Operation and Physics result 14

Pixel ladder as of 2011 January 15 West L0 West L1 East L0 East L1 Central Arm Acceptance East top East bottom West bottom West top Central Arm Acceptance West bottom West top East top East bottom Central Arm Compiled by H. Asano Q/A test by Asano and Akimoto 15

PHENIX-VTX in Action at RHIC VTX in Run 2011: Au+Au at 200 GeVVTX in Run 2012: p+p at 200 GeV Beam size Data: AuAu at 200 GeV Primary Vertex: BBC vs VTX  (beam) ~ 90 um x (cm) y (cm) 16

Electron Distance of Closest Approach (DCA) 17

Pixel at PHENIX VTX completed Since , Operation started. We archived Large acceptance  |  | < 1.2,  ~ 2  Primary vertex resolution(DCA)   ~ 77  m b->e and c->e separation Issues: Damage to wires of pixel detectors during 1 st run 18

Issue and repair work 19

20 Bus side Chip side Large temperature excursion due to the cooling interlock broke wires. Wire breaks at neck. -> not problem on wire bonding, problems on extra tensions 5-10deg -> -5deg for a few minibus, by turning off power ~ 1W/cm 2, but running cooling system Expansion coefficient Encapusulant ~ 300ppm/deg (Sylgard 184 and 186) Other material ( Myler, Si, Al, Cu Carbon ) 20~30ppm/deg 5mm long

Reapir 21 1.Removing encapulant 2.Clean up pad But fear to damage pad Decide wire on bond mark. After re-wire bonding, pull tests were performed. Always neck breaks with 6-8g tension.

Actions and Repairing work Fix interlock system, minimize unnecessary LV off. Operate 15-20deg, to decrease thermal shock. – No additional broken wire. Repair work 1.Remove encapsulant 2.Clean up bonding pad 3.Re-wire bonding 4.encapsulation Encapsulant – Available encapsulation material 300ppm/deg – Use soft material to minimize extra tension. Penetration 65 (JIS K2207) Survive Heat shock test ( 0 40deg 1min 50 times) 22

Summary We constructed Si Pixel detector for heavy ion collision experiments. It works and performs well for physics – Vertex resolution 77  m. Some of pixel ladders were damaged in the first run. Repair work is underway 23

Backup 24

VTXLayerR1R2R3R4 Geometrical dimensions R (cm)  z (cm) Area (cm 2 ) Channel countSensor size R  z (cm 2 ) 1.28  1.36 (256 × 32 pixels) 3.43 × 6.36 (384 × 2 strips) Channel size 50  425  m 2 80  m  3 cm (effective 80  1000  m 2 ) Sensors/ladder 4  4 56 Ladders Sensors Readout chips Readout channels1,310,7202,621,440138,240239,616 Radiation length (X/X0) Sensor0.22%0.67 % Readout0.16%0.64 % Bus0.28% Ladder & cooling0.78% Total1.44%2.1 % Pixel detectorStrip detector VTX parameters (in proposal) BEAM Strip Pixel LayerradiusDetectorOccupancy in Au+Au collision Layer 12.5 cmPixel0.53 % Layer 25.0 cmPixel0.16% Layer cmStrip4.5 % (x-strip)4.7 % (u-strip) Layer cmStrip2.5 % (x-strip)2.7 % (u-strip)

26