HL7 RCRIM Meeting: 9 January 2007 CDISC-RCRIM Vocab Update: Related CDISC Terminology Projects Bron Kisler, CDISC Terminology Program Director

Slides:



Advertisements
Similar presentations
HL7 January Working Group Meeting
Advertisements

Enterprise Vocabulary Services National Cancer Institute
Joint TC Meeting: EHR – RCRIM RCRIM Overview HL7 Working Group Meeting January, 2007 Presented by: Ed Tripp Program Director, eSubmissions Abbott (RCRIM.
2006 European Interchange: RCRIM Meeting RCRIM Vocab & CDISC CT Initiative: Overview and Update Bron Kisler, CDISC Terminology Team Lead.
CDISC Content to Message HL7 Development Overview Jason Rock
1 HL7 Jan 2010 Working Group MeetingsCTLAB Pharmacogenomics Update JOINT RCRIM and CG Session CTLAB Message Pharmacogenomics Results Overview.
HL7 Working Group Meeting Orlando, Florida 14 January
BRIDG Overview Clinical Observation Interoperability March 18, 2008.
Update on CDISC Terminology Activities RCRIM Vocab Session (Q4) 14 January 2009, Orlando Bron Kisler (CDISC)
What’s New with CDISC Wayne R. Kubick CDISC CTO.
An Introduction to Clinical Data Acquisition Standards Harmonization (CDASH) Loryn Thorburn © 2010 PAREXEL International | Confidential.
CMDR Plan of Action Version 3 9 th October Note This slide set is designed to facilitate discussion on the project logistics and not discuss technical.
Life Sciences Accelerated R&D Services The Science of Getting Products to Patients Faster Study Data Standardization Plan Use Case Experience Dave Izard.
Orientation to the Physical Education K to 7 Integrated Resource Package 2006.
Coaching for School Improvement: A Guide for Coaches and Their Supervisors An Overview and Brief Tour Karen Laba Indistar® Summit September 2, 2010.
Workshop on APA Style Morning Session II WSU College of Nursing October 24, 2008 Ellen Barton Linguistics/English WSU Director of Composition.
Harmonization Opportunities Russell Leftwich. Past Harmonization Efforts Consolidated CDA (C-CDA) – IHE, Health Story, HITSP 32, HL7 – 3,000 ballot comments.
Specimen-Related Classes in BRIDG BRIDG Overview for HL7 O&O WG Conference Call July 1, 2015 Wendy Ver Hoef NCI Contractor.
Bay Area CDISC Implmentation Network – July 13, 2009 How a New CDISC Domain is Made Carey Smoak Team Leader CDISC SDTM Device Team.
Diastolic Blood Pressure C25299 C25299 CDISC VSTESTCD = “DIABP” Blood Pressure C54706 The pressure of the circulating blood against the walls of the blood.
CDISC and how Stata can help us implement it
Dominic, age 8, living with epilepsy SDTM Implementation Guide : Clear as Mud Strategies for Developing Consistent Company Standards PhUSE 2011 – CD02.
Food and Nutrition Surveillance and Response in Emergencies Session 14 Data Presentation, Dissemination and Use.
Public Health Reporting Initiative October 3, 2012.
HL7 Study Data Standards Project Crystal Allard CDER Office of Computational Science Food and Drug Administration February 13,
Implementation of a harmonized, report-friendly SDTM and ADaM Data Flow General by Marie-Rose Peltier Experience by Marie Fournier Groupe Utilisateurs.
1CDISC 2002 RCRIM – Standard Domains Agenda NCI Presentation Standard Domains Working Group Goals Introduction to FDA Information Model (FIM) Discussion:
 BRIDG R3.0.2 was released in August 2010  The BRIDG Model passed the initial ISO Joint Initiative Council ballot as a Draft International Standard (DIS)
Query Health Distributed Population Queries Implementation Group Meeting November 1, 2011.
CDISC XML Technologies Standards Development An Update Sam Hume
Query Health Distributed Population Queries Implementation Group Meeting October 25, 2011.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
1 RCRIM Vocab-BRIDG Session Wednesday, Session Q2 19 September 2007.
© CDISC 2011 Joint Initiative Council 18 October 2011 Bron Kisler, VP, Strategic Initiatives, Current JIC Leader Rebecca D. Kush, PhD, President and CEO,
15th Informal US MedDRA User Group Meeting, October 28, 2011 Slide 1 Double the Impact with Half the Work: Linking MedDRA and WHO Drug Indication coding.
Public Health Reporting Initiative: Stage 2 Draft Roadmap.
Alice Chen, MD, FACP Investigational Drug Branch, CTEP, DCTD National Cancer Institute CTCAE Version 4.
1Presentation Name Pre-Marketing Safety Assessment: The Safety Review Guidance Armando Oliva, M.D. Associate Director for Policy Office of New Drugs.
RCRIM Projects: Protocol Representation and CDISC Message(s) January 2007.
Briefing: HL7 Working Group Meeting Update for the VCDE Community Dianne M. Reeves Associate Director, Biomedical Data Standards NCI CBIIT VCDE Meeting.
CIDER - Today’s research, Tomorrow’s treatments Lab-2 September 15, 2010 Bijoy George, Program Manager, CBMI
SAE data entry: Clinical versus Pharmacovigilance standards Daniel Becker Solvay Pharmaceuticals Hannover, Germany T:
Public Health Reporting Initiative April 4, 2012.
Public Health Reporting Initiative Stage 3 Sprint: Implementation Guide Development Phone: x
CDISC©2009 February CDISC INTRAchange Carey Smoak Device Team Leader Li Zheng Submission Data Standards Team Member Thurday, April 2, 2009.
From PDF to RDF – Representing the CDISC Foundational Standards
BRIDG Update January HL7 Working Group Meeting 15 January
Interchange vs Interoperability Main Entry: in·ter·op·er·a·bil·i·ty : ability of a system... to use the parts or equipment of another system Source: Merriam-Webster.
BRIDG Imaging Project Nov. 25th, Agenda Project Goals & Objectives Imaging Projects of interest Rationale for aligning with BRIDG Principles on.
CDISC – 17/12/2012 Carine Javierre Nathalie SABIN.
1 CDISC HL7 Project FDA Perspective Armando Oliva, M.D. Office of Critical Path Programs FDA.
Updates on CDISC Activities
Background The Sustainable Development Goals (SDGs), which the UN Members States jointly committed to in September 2015, provide an ambitious and long-term.
March 18th, 2005http://jhh.opi.upmc.edu/main/cabig/BestPracticesSig1 caBIG Architecture Working Group Face-To-Face Meeting Best Practices SIG March 18th,
CDISC Controlled Terminology HITSP Harm. Subcommittee 1 October 2008 Bron Kisler (CDISC)
How good is your SEND data? Timothy Kropp FDA/CDER/OCS 1.
Submission Standards: The Big Picture Gary G. Walker Associate Director, Programming Standards, Global Data Solutions, Global Data Management.
CDISC Controlled Terminology Initiative: An Overview
BRIDG Adverse Event Sub-domain Summary
CDISC Controlled Terminology
FHIR Adverse Event Resource
8. Causality assessment:
11 ii. Develop a plan for aDSM
Secondary Uses Primary Use EHR and other Auhortities Clinical Trial
Accenture Accelerated R&D Standards Metadata Management – version control and its governance Kevin Lee CDISC NJ Meeting at 01/28/2015 We help our Clients.
Strength of Evidence; Empirically Supported Treatments
Snapshot of the Clinical Trials Enterprise as revealed by ClinicalTrials.gov Content downloaded: September 2012.
Clinical Observation Interoperability March 18, 2008
CAC Meeting Tuesday, 21 June, CAC Meeting Tuesday, 21 June, 2017.
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Presentation transcript:

HL7 RCRIM Meeting: 9 January 2007 CDISC-RCRIM Vocab Update: Related CDISC Terminology Projects Bron Kisler, CDISC Terminology Program Director

Outline 1.Status Update on CDISC Terminology Projects (Bron) 2.Joint CDISC Terminology / RCRIM Vocabulary Meetings (Bron & Margaret) 3.EVS Overview / FDA-EVS Terminology Work (Margaret) 4.Other Vocabulary topics (Patient Safety, Clinical Genomics, etc.)

2006 Snapshot Completed 1 st production release of CDISC Terminology – SDTM Package-1 Refined collaboration processes for terminology development & production with NCI EVS Learned and thoroughly tested the NCI terminology environments – NCI Thesaurus and caDSR Conducted 1st Terminology Training Workshop in collaboration with NCI EVS and NCICB Launched new terminology projects: SDTM Labtest and SDTM Package-2 (now 2A & 2B)

CDISC Terminology Projects

CDISC Terminology Developing controlled terminology for the SDTM distributed across four project teams SDTM Package-1 Project: 30 code lists and more than 700 controlled terms in production Labtest Project: 2 code lists with 90 controlled terms SDTM Package-2A Project: 12 code lists for EG domain and 3 Interventions domains; includes large terminology set for Units of Measure SDTM Package-2B Project: 15 code lists for PE, VS, SC and AE domains; to include large terminology set for Location (LOC variables)

SDTM Package-1 (N=30) Action Taken with Study Treatment Age Span Age Units Category for Inclusion/Exclusion Country Dictionary Name Diagnosis Group Domain Abbreviation Dose Form Ethnicity No / Yes/ Unknown Answers Not Done or Null Answer Outcome of Event Reason for Non- Completion Relation to Reference Period Route of Administration AE Severity Sex Sex of Participants Size Toxicity Grade System Organ Class Trial Blinding Schema Trial Indication Type Trial Phase Trial Summary Parameter Type of Control Type of Trial Units for Vital Signs Results Vital Signs Test Name

SDTM Package-1 Project August: Package-1 Terminology finalized and final concepts created in NCI EVS (NCIt) September: Moved to NCI public servers in “Pre-Release” status October: FINAL production terminology formally released in EVS environment To Do: Move Package-1 from “Draft New” to “Released” status in caDSR; Finalize User Workflow Documents; Education & Training; Change Control / Support & Maintenance NCIt = NCI ThesauruscaDSR = Cancer Data Standards Repository

SDTM Labtest Project Q2 2006: Completed public review of Labtest terms (N=90) Q3-Q4 2006: Vetted public comments; conducted analysis with existing NCI EVS terms; assigned definitions and finalized CDISC Labtest work Q1 2007: Create final concepts in EVS (NCIt) and move to production servers To Do: Formally release production terminology; Determine link with LOINC tables; Begin development of next set of Labtest terms

SDTM Package-2A CMDOSFRQ (Dosing Frequency per Interval) CMDOSU (Dose Units) EXDOSFRQ (Dosing Frequency per Interval) EXDOSU (Dose Units) SUDOSFRQ (Use Frequency per Interval) SUDOSU (Consumption Units) EGTESTCD (ECG Test or Examination Short Name) EGTEST (ECG Test or Examination Name) EGPOS (ECG Position of Subject) EGSTRESC (Character Result or Finding in Std Format) EGSTRESU (Standard Units) EGMETHOD (Method of ECG Test) EG Domain Interventions Domains EG = ECG Test Results CM = Concomitant Medications EX = Exposure SU = Substance Use

SDTM Package-2A Project Q4 2006: Established Package-2A project team; Conducted analysis with NCI EVS terms; Completed terminology set with definitions Q1 2007: Post for public review in accordance with CDISC Standards Development Process Q2 2007: Vet public comments and finalize CDISC work on terminology set Q3 2007: Create final concepts in EVS (NCIt) and move to production servers

SDTM Package-2B PE DomainVS Domain PE = Physical Examination PETESTCD (Body System Examined Short Name) PETEST (Body System Examined) PECAT (Category of Examination) PEBODSYS (Body System or Organ Class) PESTRESU (Standard Units) PESEV (Severity / Intensity) PELOC (Location of Physical Exam Finding) VSPOS (Vital Signs Position of Subject) VSORRESU (Original Units) VSSTRESU (Standard Units) VSLOC (Location of Vital Signs Measurement) SCTESTCD (Subject Characteristics Short Name) SCTEST (Subject Characteristics) AEREL (Causality) / deferred from Package-1 project? AEPATT (Pattern of Event) AELOC (Location of the Reaction) VS = Vital SignsSC = Subject Characteristics SC & AE Domains

SDTM Package-2B Project Q1 2007: Kick-off new Package-2A project team and pull together terminology set with definitions Q2 2007: Post for public review in accordance with CDISC Standards Development Process Q3 2007: Vet public comments and finalize CDISC work on terminology set Q4 2007: Create final concepts in EVS (NCIt) and move to production servers

2007 Priorities Finalize “Terminology” production release for 3 active projects (Labtest, Package-2A, & 2B) Kick-off terminology implementation project team Document detailed process for terminology development and production (CDISC Ops Procedure) Document process for change control and support & maintenance Further develop Education and Training Course Identify what’s left and begin developing final primary SDTM Terminology Package Other terminology priorities for CDISC, SDTM and RCRIM? BRIDG, Microbiology and Pharmacogenomics

Joint Meetings

Joint Terminology Meetings September WG Meeting…RCRIM agreed to combining CDISC Terminology & RCRIM Vocabulary team calls –Has improved participation in combined activity with team members from both CDISC & RCRIM –Has promoted RCRIM education and information sharing (e.g. SPL, ICSR) across large CDISC team –Ultimately encourages “dual citizenship” across CDISC & RCRIM and cross fertilization of vocabulary activities –Additional Thoughts?

Strategy for 2007 Continue to increase joint team membership to expand terminology workload, accelerate workflow and improve cross project efficiency Shift and more evenly distribute work across CDISC terminology projects and RCRIM Vocab Continue to leverage NCI EVS environment for terminology harmonization Encourage more cross education and training (CDISC, HL7 and RCRIM) Continue to run call scheduling through CDISC mechanism…?