Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.

Slides:



Advertisements
Similar presentations
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Advertisements

Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Certification of ICAO compliant GBAS Cat-I in Australia
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Performance-based Navigation Honeywell SmartPathTM
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
Presented to: By: Date: Federal Aviation Administration FLIGHT TEST SAFETY WORKSHOP Flight Test Safety Workshop Jim Richmond Aircraft Certification Service.
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
Wide Area Augmentation System (WAAS) DAN HANLON WAAS PROGRAM MANAGER Tom Salat WAAS NAS INTEGRATION.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002 PROCEDURES FOR AIR NAVIGATION SERVICES- OPERATIONS (PANS OPS ICAO DOC. 8168) Barry Billmann Federal.
Larry Oliver FAA Flight Standards (AFS-430) Advanced Management Technology, Inc. Federal Aviation Administration GPS/WAAS.
Chapter 16 GPS/Satnav. GPS Global Positioning System Will eventually replace the older, radio/radar based systems of VOR, ILS and NDB. The US system is.
Alternative Positioning, Navigation, and Timing Initiative
Status of Operational GNSS Augmentations in United States
Federal Aviation Administration GPS Augmentation Systems Status Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) September 2009.
A ERODROME T RAINING M ODULE 5 P ART 2 Electronic Navigation Aids.
277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
Satellite Based Augmentation System (SBAS): – Augmentation of navigation satellite systems (GNSS). Operational SBAS or Systems being built (beyond study):
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
Federal Aviation Administration The Next Generation Air Transportation System – NextGen or Destination For Airports Presented to: The Eastern Region.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
Satellite Operation s Satellite Operation s TeleComm Oil Exploration Trucking & Shipping Surveying & Mapping Precision Agriculture GPS enables a diverse.
Presented to: By: Date: Federal Aviation Administration FAA GNSS Program Plans and Status Institute of Navigation NTM Leo Eldredge, FAA GNSS Group January.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Federal Aviation Administration A lternative P ositioning, N avigation, and T iming Initiative Ground Rules Mitch Narins Chief Systems Engineer FAA Navigation.
FAA GNSS Evolutionary Architecture Study
NTAS NextGen Videos  Satellite Based navigation  ADS-B ◦ In / Out  Performance Based Navigation ◦ RNP/RNAV  TBO  Data Link Communications.
Satellite Navigation Program Federal Aviation Administration.
GNSS Aviation Applications
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
Transportation Applications: Now and Future Session 1: Overview: GNSS-Based Application Areas United Nations/Zambia/ESA Regional Workshop on the Applications.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Larry Oliver FAA Flight Standards (AFS-430) GPS Technical Assistance Contract Federal Aviation Administration Everything You Wanted to Know About GPS and.
Federal Aviation Administration 0 GPS, WAAS, GBAS Overview March 8, GPS Integrity RAIM, WAAS, and GBAS: Concepts and Status Federal Aviation Administration.
Jimmy R. Snow COMMISSIONING THE WIDE AREA AUGMENTATION SYSTEM.
Federal Aviation Administration Newark Project Overview January 2009.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Overview of FAA Satellite Navigation Transition and Backup Strategies Int’l Loran Association October 28, 2002.
The Wide Area Augmentation System (WAAS) Todd Walter Stanford University Todd Walter Stanford University
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding EGNOS System Definition and Benefits.
Flight Planning and Navigation GPS Navigation © 2011 Project Lead The Way, Inc.Aerospace Engineering.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
2003 FRP User Conferences 1 FAA’s Transition Strategy for Navigation and Landing Services Dave Olsen Navigation System Engineer Architecture and Systems.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
SmartPath® Ground Based Augmentation System (GBAS) A New Era in Precision Navigation.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Performance Based Navigation Today & Tomorrow An FAA Perspective
Presentation to US Space-Based PNT Advisory Board
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager Federal Aviation Administration (FAA) ACC/AAAE Airport Planning, Design and Construction Symposium February 28, 2008

Global Navigation Satellite System (GNSS) Program Plans and Status 2 Federal Aviation Administration February 28, 2008 Peak Aircraft Traffic Over The US

Global Navigation Satellite System (GNSS) Program Plans and Status 3 Federal Aviation Administration February 28, 2008 Future Planning Assumptions By 2025, Aviation is Expected to Increase By a Factor of 2.7 The NAS Will Transition to Satellite Navigation Technology –Provide Performance-Based Navigation Services to Enable RNAV & RNP –Position Navigation Timing (PNT) is a critical enabler for NextGen –New Navigation Services Must Be Cost- Beneficial Legacy Services With Negative Benefits/Cost Will Eventually Be Removed Cost Resources Will Be Limited

Global Navigation Satellite System (GNSS) Program Plans and Status 4 Federal Aviation Administration February 28, 2008 Global Navigation Satellite System (GNSS)

Global Navigation Satellite System (GNSS) Program Plans and Status 5 Federal Aviation Administration February 28, 2008 Global Positioning System (GPS) Space Segment 24 Orbit Slots 6 Orbital Planes 4 Satellites Per Plane (Nominal) 55 Degrees Inclination Orbit at 10,800 Miles Orbits Once Every 12 Hours Control Segment 5 GPS Monitor Sites 13 NGA Monitor Sites 2 Operational Control Centers User Segment Military & Civil Receivers Precise Positioning Service (PPS) Standard Positioning Service (SPS)

Global Navigation Satellite System (GNSS) Program Plans and Status 6 Federal Aviation Administration February 28, 2008 FAA Satellite Navigation Program

Global Navigation Satellite System (GNSS) Program Plans and Status 7 Federal Aviation Administration February 28, 2008 WAAS Architecture 38 Reference Stations 3 Master Stations 4 Ground Earth Stations 2 Geostationary Satellite Links 2 Operational Control Centers

Global Navigation Satellite System (GNSS) Program Plans and Status 8 Federal Aviation Administration February 28, 2008 WAAS Vertical Service Coverage

Global Navigation Satellite System (GNSS) Program Plans and Status 9 Federal Aviation Administration February 28, 2008 WAAS Approach Procedures LPVs: 1028 LNAV/VNAVs: 1275 (as of February 14, 2008) WAAS Procedures to be Published to All Instrument Runways in the NAS by 2018

Global Navigation Satellite System (GNSS) Program Plans and Status 10 Federal Aviation Administration February 28, 2008 Summary of RNAV(GPS) - Minima LPV - Localizer Performance with Vertical WAAS avionics minima LNAV/VNAV – Lateral Navigation With Vertical Baro-VNAV, or WAAS Avionics LNAV - Lateral Navigation Non-Precision Approach (NPA)

Global Navigation Satellite System (GNSS) Program Plans and Status 11 Federal Aviation Administration February 28, 2008 WAAS Avionics Status General Aviation –Garmin WAAS Receivers Sold ~26,000 –Bendix-King Bringing Products to Market Business & Regional Aircraft FMS Avionics –Rockwell-Collins: Expecting CRJ/Canadair 604 STC approval in FY‘08 –Canadian Marconi Corporation (CMC): Integrate WAAS Into Honeywell Primus 2000 FMS by December –Universal Navigation Systems (UNS) Avionics: WAAS- Enabled Capability in Dual Thread UNS-1 FMS TSO in 2007 Air Carrier & Cargo Aircraft –Southwest Airlines Equipping 200 Boeing 737 with Rockwell Collins' GPS-4000S for Required Navigational Performance (RNP) operations –Federal Express (FEDEX) Equipping 253 Cessna Caravan Aircraft with Garmin GNS- 530W WAAS avionics and GMX-200 multi-function displays Starting to equip 48 Q400s with Universal UNS-1F avionics Helicopter Aircraft Implementing WAAS

Global Navigation Satellite System (GNSS) Program Plans and Status 12 Federal Aviation Administration February 28, 2008 Preparing Airports for WAAS Steps To Prepare Airport 1.Review information on getting an instrument approach at: 2.Contact Airport District Office to determine Infrastructure requirements/improvements 3.Contact the ADO or FPO to determine survey needs and/or check the status of FAA-sponsored surveys at: Airport Infrastructure Needed –Paved Runways Over 3200 Ft. Long By 60 Ft. Wide –Non-precision Runway Markings (Or Better) –Runway Safety Zone Airport Infrastructure Recommended To Obtain The Lowest Possible Minima –Parallel Taxiway (Reduces Decision Height, But Not Mandatory) –Medium Intensity Runway Lights (Reduces Visibility And Provides For Night Operations)

Global Navigation Satellite System (GNSS) Program Plans and Status 13 Federal Aviation Administration February 28, 2008 Local Area Augmentation System (LAAS) Precision Approach For CAT- I, II, III Multiple Runway Coverage At An Airport Terminal Area Procedures for Arrival and Departure

Global Navigation Satellite System (GNSS) Program Plans and Status 14 Federal Aviation Administration February 28, 2008 Current Activities Integrity Analysis and Prototype Development LAAS System Design Approval (SDA) Process LAAS Operational Implementation at Memphis Airport International Cooperation and Development CAT-III Research & Development Activities

Global Navigation Satellite System (GNSS) Program Plans and Status 15 Federal Aviation Administration February 28, 2008 Agana, Guam Frankfurt, Germany Rio De Janeiro, Brazil Malaga, Spain LAAS/GBAS International Efforts Sydney, Australia Bremen, Germany

Global Navigation Satellite System (GNSS) Program Plans and Status 16 Federal Aviation Administration February 28, 2008 Summary The FAA is Implementing Satellite Navigation Systems Needed to Support Performance Based Navigation and NextGen The WAAS Program Has Matured Through Development and is Rapidly Progressing Through Operational Implementation The First Certified LAAS is Expected In Late 2008 Satellite Navigation is a Cornerstone of the Next Generation Air Transportation System (NextGen)

Global Navigation Satellite System (GNSS) Program Plans and Status 17 Federal Aviation Administration February 28, 2008 Questions