Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Dial Caliper. The dial Caliper has seven main components: a slide scale, lock screw, thumb adjustment wheel, measuring jaws (inside & out), dial with.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Survey(s) of TT8 10/12 TT 8 after wall1 16/12 TT 8 Standalone.
Inventor Or How to build things.
2 Post Vertical Shore/Laced Post
S.H.H.S Building Construction
1 Installation of Delphi Frame  ITS Installation.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
Walls crates cables gas chambers electronics CERN adb.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
 In ancient times, there were no machines to assist in transporting large stones for the building of pyramids  People had to get very large stones across.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Candela Display Systems 3x2 Interactive Video Wall System.
Prepared by : GRMIRZA & Co. (
Physics 111 Practice Problem Statements 12 Static Equilibrium SJ 8th Ed.: Chap 12.1 – 12.3 Contents 13-5, 13-7, 13-17*, 13-19*, 13-20, 13-23, 13-25, 13-28*,
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Precision Layout Unit 21.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
1 Photogrammetry of TT7. 2 Front view Distribution of all targets All the plots are in the magnet reference system.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
OMA To order decimals to 2dp and continue a decimal number sequence inc. negative numbers.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Measuring Instruments
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Learning Roomba Module 5 - Localization. Outline What is Localization? Why is Localization important? Why is Localization hard? Some Approaches Using.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Concept Design for LBNF Far detector (LAr single phase)
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
VIEW SERIES with Sliding Door
Baby-MIND Modules & Services
VELO-installation meeting CERN, January 17, 2006
Present status of the flux return yoke design
A. Mikhailichenko, D. Rubin
LumiCal mechanical design, integration with LDC and laser alignment
G. Carboni for the Muon Group
F.1 Social Studies Enrichment Program 4.
Hagerty Robotics Tesla Training Day.
OT Survey & Adjustment Outline: Survey technique at present
Leveling By : Parveen Kumar.
Surface Area.
Cryomodule Assembly Plan
 More Fluids  November 30,  More Fluids  November 30, 2010.
Bunker Wall Design Wall ESS
Presentation transcript:

Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position Balcony alignment Alignment system for X, Y and horizontal level Interlink of Front and Back alignment Sequence for Alignment procedures Conclusion for the M1 alignment system 22 February 20091M1 Alignment T.Schneider M1 Alignment

End of last year we had a first look on the absolute position of the M1 A and C side Looking on the beam pipe position we had to lift both sides up by about 4cm With the help of the survey team we measured the beam supporting the walls 22 February 20092M1 Alignment T.Schneider Preparation of wall position

22 February 20093M1 Alignment T.Schneider Preparation of wall position

The walls were put in a kind of “close to closed” position (25cm) With the help of a plump we aligned the inner edges of both sides vertically 22 February 20094M1 Alignment T.Schneider Alignment of A and C side in closed position

The system has been closed totally The beam pipe cut out was well adjusted in X and Y around the beam pipe This position is the starting point for our alignment. About the shape of the walls we do not care so much. We need a kind of reference system visible in open and closed position 22 February 20095M1 Alignment T.Schneider Alignment of A and C side in closed position

M1 closing

22 February M1 Alignment T.Schneider Translation of reference system to open position

22 February M1 Alignment T.Schneider Translation of reference system to open position

22 February M1 Alignment T.Schneider Translation of reference system to open position

After the opening of the system (working position) the reference system has been brought again into vertical position. This we have been done by adjusting the outer fixation screw of the walls. The resulting difference in Y has to be taken into account (A=-3.25mm,C=-4mm) For the translation in height (Y) of Survey coordinate system to the physics one a correction of 43.6mm (depending on Z of M1) is given 22 February M1 Alignment T.Schneider Transfer of reference system to open position

Using this reference system we were able to measure the end of chamber fixation rail positions All front side top and back side bottom positions were measured. Some additional ones (back top) were used for crosschecking. These coordinates once translated to absolute values for the closed position were the starting point for Wander to do the balcony alignment for the close chambers 22 February M1 Alignment T.Schneider Balcony alignment

Alignment bars with precise holes at the nominal chamber centers positions (X) have been machined 4 different types are need These bars will be fixed and well aligned on the top and bottom of the walls Precision rods will be inserted into these holes Thin wires fixed between these rods will built a kind of grid system for the X–position of the chamber centers Additional square bars on top of these rods will guarantee good reflection for the Y laser distance measurement With help of additional traces on the chambers we will be able to align the horizontal level of each chamber 22 February M1 Alignment T.Schneider Alignment for X Y and horizontal level

22 February M1 Alignment T.Schneider Alignment for X Y and horizontal level Alignment steps: Horizontal level alignment with precision water level Y-alignment measurement with laser meter to top and bottom square block X-alignment with help of wire grid

22 February M1 Alignment T.Schneider Alignment for X Y and horizontal level Calibration of new laser meter The new laser meter mode has a 0.1 mm digit compared to 1mm from the old one. It has been compared to an interferometer of the SU group. We should include a linear correction for the Y-measurement.

Important point is to interlink together Front and Back alignment in the best way possible The bottom front area is unfortunately not accessible for any survey measurement For the top bars we will link directly front and back together. This is done via additional rods passing the wall For the bottom of the wall this is unfortunately not possible due to the cable routing already done. For the bottom front ones we will also pass the wall with precision rods give access for the survey measurement 22 February M1 Alignment T.Schneider Interlink of Front and Back alignment Side view top Side view bottom Back Front

22 February M1 Alignment T.Schneider Sequence for Alignment procedure Rich detector

22 February M1 Alignment T.Schneider Sequence for Alignment procedure M1 Back side 1 st step: M1 in open position Alignment of B/C/D column

22 February M1 Alignment T.Schneider Sequence for Alignment procedure M1 back side 2 nd step : Calorimeter in open position and M1 more or less closed Alignment of A-column The access to the chamber crosses is good The walls have to be re-aligned for the horizontal level

22 February M1 Alignment T.Schneider Conclusion for the M1 Alignment system Improvements for the M1 alignment: Permanent reference system on the wall easy visible for survey Good interlink in-between reference system and alignment system Precision (+-0.1mm) alignment bars on top and bottom of the wall Front and back alignment will be well interlinked The new laser meter has one digit better resolution (1mm=>0.1mm). Measurement to top and bottom The reflection surface for the Y-measurement has been improved We have no more free hanging plumbs but a more precise and stable wire grid for the X alignment Chamber cross quality has improved Alignment with nacelle to reach each chamber -Inner part Front very bad access (not possible to climb down) -Faraday cages in the way for Y and X alignment -First align close layer and then in a 2 nd step the far one