1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.

Slides:



Advertisements
Similar presentations
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
/18 Yasuaki Ushio Hiroshima University The result of cavity compton experiment.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Experience at ATF To get a low emittance beam Junji Urakawa KEK Circumference: m Arc Cell Type: FOBO Number of Arc Cells: 36 Energy: GeV.
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Compton Experiment at ATF Tohru Takahashi Hiroshima University for Collaborators (particularly Omori san for slides)
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
PULSE LASER WIRE Laser pulse storage in an optical cavity as a beam monitor & an X-ray source Kaori Takezawa Kyoto Univ. 2nd Mini-Workshop on Nano Project.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Compton Experiment at ATF Compton Meeting at LAL Orsey 2-Dec-2008 Tsunehiko OMORI (KEK) with many thanks to Compton collaborators.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF Damping Ring in 2010 autumn Multibunch instability study Measurement (S. Kuroda, T. Naito and K. Kubo) and Calculation of ion trapping (Kubo)
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Laserwire: high resolution non-invasive beam profiling
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
Pol. positron generation scheme for ILC
ATF Intrabeam Scattering Results
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Junji Urakawa ( for collaborators ) March KEK at LNF
Instability measurement plans at ATF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping Rings R&D Workshop – ILCDR06, Cornell University

2 Pulse generator Specifications Amplitude at 50 ohm : 5 kV Rise time : ns Pulse width at 50% of amplitude : 2-3 ns Maximum Pulse Repetition Frequency in burst mode : 3 MHz FID Technology has very fast and high repetition rate pulse generators. The specification meets our requirements for the high voltage pulse source. We tested the kicker performance by using the pulse PS.

3 Beam kick experiment at ATF DR The kicker pulse is applied to the strip-line electrode when the beam goes through the electrode. The beam kick is observed by a turn-by-turn BPM as the amplitude of the oscillation of the betatron frequency component. The kick effect is measured by scanning the pulse timing precisely.

4 Measurement result of FPG5-3000M The achieved resolution is 0.2  rad. Rise time~3.2ns Kick angle ~91  rad (calc.94.7  rad) Expanded horizontal scale

5

6 After tuning of the circuit,

7

8 ATF Introduction E=1.3GeV, N e =3x10 10 e - /bunch 1 ~ 20 bunches, Rep=3.125Hz X emit=2.5x10 -6 ( at 0 intensity) Y emit=1.0x10 -8 ( at 0 intensity) -  2.5x10 -9 in Future Emittance status

9 ATF Damping Ring BPM Electronics: single pass detection for 96 BPMs

10 Spectrum of DR BPM Signal peak at ~ 1GHz Resolution Improvement Min. resolution ~ 2µm Turn by Turn and Bunch by Bunch Signal at 1GHz

11 Laser wire beam size monitor in DR 14.7µm laser wire for X scan 5.7µm for Y scan (whole scan: 15min for X, 6min for Y) 300mW 532nm Solid-state Laser Fed into optical cavity

12 Experimental setup 1. laserwire 2. detector and collimator 3. data taking system

13 Laserwire setup horizontal wire vertical wire

14 Detector Compton scattering 28.6 MeV (max gamma energy) 23.0 MeV ( 0.2 mrad scattering angle ) gamma ray detector [70 mm ×70 mm ×300 mm ] CsI(pure) crystal 2” photo-multiplier time resolution PMT signal leading edge 0.56 nsec resolution (signal energy region) enough to separate 2.8ns spacing bunches

15 Beam profile by Laser wire  e 2 =  meas 2 -  lw 2  =  e 2 – [  (  p/p)] 2  :measured by Q-trim excitation

16 Emittance by Laser wire < 0.5% y/x emittance ratio Y emittance =4pm at small intensity

17 Beam kick experiment at ATF DR The kicker pulse is applied to the strip-line electrode when the beam goes through the electrode. The beam kick is observed by a turn-by-turn BPM as the amplitude of the oscillation of the betatron frequency component. The kick effect is measured by scanning the pulse timing precisely.

18

19 Tektronix DPO GS/s Powerful Lap-top PC with huge memory National Instruments GPIB- Enet/100 DCCT, ICT DR Trigger System DR BPM Interface to transfer lots of related data ATF local network DAQ which will be made soon. ATF DR tunnelATF Assembly hall New powerful data acquisition system Transverse emittance, bunch length, tune, vacuum level, COD, energy spread, temperature, Acceleration Voltage

20 New powerful data acquisition system will be installed in Nov.. Tektronix, DPO7000, 20GS/sec, 500MHz to 7.25GHz, 1msec continuous signal measurements just after triggering by the step of 100psec for fast kicker study. (time resolution less than 1psec)

21

22

23

24

25 Experimental Plan for study on fast kicker with multi-bunch The range from several 10 9 to 3x10 10 electrons/bunch Until 20 bunches/train, changeable from 1 to 20. Precise emittance growth measurements bunch-by bunch. Accurate beam position measurement during 1msec by the step of 100psec ; huge data will be obtained. We will start this R&D from end of Nov. in this year because new instrumentation require the check and fine tuning for one month from mid. of Oct. and fast kicker R&D has first priority. Anyway, I want to finish this study until 2007 at ATF.