1 CAATS Second Workshop Validation User Group VDR Survey - Results Ulrich Borkenhagen; EUROCONTROL HQ, Core Team Lanzarote, Thursday 16 th February 2006.

Slides:



Advertisements
Similar presentations
WillHelpYouOut.com Hits 1000 Let’s get Started.
Advertisements

Stop. Think. Connect. National Cybersecurity Awareness Campaign October 2010.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 1: Usability Testing.
Future Trends on Student Involvement in Quality Assurance Agencies
Advanced Grid Research Workshops through European and Asian Co-operation The Project
1 Evaluating Communication Plans Cvetina Yocheva Evaluation Unit DG REGIO 02/12/2009.
Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
VARTAN – Validation Reporting Templates Jürgen Teutsch, NLR CAATS Workshop, 16-Feb-2006, Lanzarote.
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
The EUROCONTROL Validation Planning Process
The European Organisation for the Safety of Air Navigation DQR – Roles and Responsibilities DAL/DQR Workshop Brussels, February 2013 Presented by:
Hans Koolen NMOC/CFMU Network Operations Services
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
DELOS Highlights COSTANTINO THANOS ITALIAN NATIONAL RESEARCH COUNCIL.
BEPIQUA PROJECT SURVEY RESULTS & ON-SITE VISITS.
CC Survey of IT Skills October When it comes to NOT SURE WHAT MY ADDRESS IS 1.4% 1 (TEST RESPONSE) HAVE AN ACCOUNT AND CHECK.
The IST Programme Information Society Technologies Programme (IST ) 1 FP5: IST Programme Information Society Technologies IST Programme How it works Jacques.
Rationale To encourage all students to take a full part in the life of our school, college, workplace or wider community. To provide opportunities to enable.
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
New technologies and disaster information resources Part 2. The right information, at the right time, the right way.
Outcomes-Based Accreditation: An Agent for Change and Quality Improvement in Higher Education Programs A. Erbil PAYZIN Founding Member and Past Chairman.
A Walk Through the Wiki An introduction to the Commissioning Handbook.
RALPH PRAHL CONSULTANT TO CPUC ENERGY DIVISION IEPR Workshop on 2030 Efficiency Goals JULY 6, 2015 Building a Policy Framework to Support Energy Efficiency.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
The Vision Integration Platform Change Readiness Campaign Theme “Together to the Future”
Web 2.0 for Government Knowledge Management Everyone benefits by sharing knowledge March 24, 2010 Emerging Technologies Work Group Rich Zaziski, CEO FYI.
1 SCIP Africa Summit | October , 2014 Firefighters to Futurists SCIP Africa Summit October 2014 Butterfly Effect Intelligence™: Stuart Maclachlan.
European Association of Aerospace Industries Paola Chiarini Bordeaux, 17 th January 2003 Project Manager AeroSME AeroSME Project The AeroSME Project a.
EXPECTATIONS OF TURKISH ENVIRONMENTAL SECTOR FROM INSPIRE Ministry of Environment and Forestry June, 2010 Özlem ESENGİN Ahmet ÇİVİ Tuncay DEMİR.
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative ANF IT Consolidation Website Publishing / IA Working Group Kickoff.
Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009.
1  Copyright 2005 EUROCONTROL Safety Performance Review Radu CIOPONEA Performance Review Unit EUROCONTROL.
From membership to leadership: advancing women in trade unions Working groups ETUC workshop, Berlin 28 October 2010.
CONDUCTING A PUBLIC OUTREACH CAMPAIGN IMPLEMENTING LEAPS IN CENTRAL AND EASTERN EUROPE: TRAINERS’ HANDBOOK Conducting a Public Outreach Campaign.
Introduction 1. Purpose of the Chapter 2. Institutional arrangements Country Practices 3. Legal framework Country Practices 4. Preliminary conclusions.
Edita Trečiokienė Grundtvig 3: Grants to Participate in Adult Education Training Activities The Quality of Training Activities applied for and possible.
Internet2 End-to-End Performance Initiative or Why Fat Pipes aren’t Enough Ted Hanss Director, Applications Development 16 May 2001 See
Creating Successful Theme-based Web Pages Theme-based web sites provide users with a coherent in-depth narrative on a single topic Nancy N. Soreide NOAA/PMEL.
© LAIC Aktiengesellschaft FINANCIAL MANAGEMENT SYSTEMS OVERVIEW ATRAK-AB (Aeronautical Billing) ATRAK-AS (Aeronautical Statistics) ATRAK-GTW (Data.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
ITSRM Content Management Infrastructure Coordination David Foster IT June 2010.
NCP training session 30 October 2002 Integrated information system on RTD in Europe Gwenda Jeffreys-Jones, DG RTD European Commission.
Open Archive Forum Rachel Heery UKOLN, University of Bath UKOLN is funded by Resource: The Council for Museums, Archives.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
Horizon 2020 Ian Devine European Advisor – UK Research Office University of Manchester, 11 September 2014.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision CERTIFICATION PROCESS  Peter Stastny,
7 th Grade Big6 Project Assignment: Make a children’s informational book (It can be in graphic novel format or regular picture-book format)
Design Evaluation Overview Introduction Model for Interface Design Evaluation Types of Evaluation –Conceptual Design –Usability –Learning Outcome.
Citizenship and Human Rights Education Assessing progress with the help of the Council of Europe Charter.
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Case: Taking an Existing Intelligence Operation to the Next Level Jens Thieme Head of Market and Competitive Intelligence.
CEATS Central European Air Traffic Services
Five Web Design Tips to make a Health Care Website More Attractive
Marcom International for OSHA
Christian Ansorge Arona, 09/04/2014
Strategic Prevention Framework – Capacity Building
EQAVET Annual Network Meeting
ICAO Aviation English Language Test Endorsement
Helene Skikos DG Education and Culture
Directorate-General Energy and Transport
IMPROVING PUBLIC INFORMATION
2019 CIRS survey: Methodologies to improve decision-making documentation during medicines development and review – gap analysis Do you think your current.
Presentation transcript:

1 CAATS Second Workshop Validation User Group VDR Survey - Results Ulrich Borkenhagen; EUROCONTROL HQ, Core Team Lanzarote, Thursday 16 th February 2006 European Organisation for the Safety of Air Navigation

2 Background The idea of a central repository for validation results dates back to the Mid 90s. Building on the approved EATMS Validation Strategy (EVAS) the EUROCONTROL Agency started more concrete development steps in After several prototyping cycles the Validation Data Repository (VDR) became publicly available via the Internet in June In October 2002 there was an agreement between EC and the Agency (annex to the general MoC) that the Agency provides the VDR. EC requested all new projects in its framework programmes to input their relevant results into the VDR. The VDR has always been a topic for the FAA/EUROCONTROL R&D collaboration.

3 Objectives of the Survey The VDR has been available for more than 3 ½ years. The readiness of projects to input their data into the VDR turned out to be low. Since the VDR was conceptualized the world has moved on: The Internet with efficient search engines is now available to everybody. What role does the VDR actually play in the day to day work of ATM R&D practitioners and managers? How should we improve the VDR?

4 Questionnaire Questionnaire addressing the entire ATM R&D community, whether VDR user or not, was developed. 8 questions for the general use of ATM R&D information and 9 VDR related questions. Sent out via to ~150 non-Agency recipients ~65 Agency staff (EHQ and EEC) 40 responses (~20%) received 24 non VDR users 16 VDR users (10 beginners, 3 experienced, 3 advanced)

5 Findings - General The limited number of responses indicates that the existence of the VDR or how to get access to it is generally not well known: It is not used and probably not even known by airlines, military, airports and industry. The VDR is known and used more or less within the classical ATM R&D Community (R&D Organisations, Institutions, ANSPs). Although the VDR has been public for more than 3 years, a positive message from the VDR users has not spread. Among the users only a few make it from a beginner to more advanced stages. This may be partly due to the HMI and comprehensibility of functionality which are not intuitive (however all in all acceptable). A majority of the users actually inputs its data into the VDR or would do so, if less effort was needed. Some users identified some additional basic and simple (from users perspective) services which would improve the VDR. The targeted audience does not consider the VDR as a day to day tool for getting information.

6 Findings – Management Although corporate managers show a high interest in the VDR they dont use it themselves. The role of 8 out of 40 participants is corporate management. 1 VDR user The reason for their awareness may be that they would appreciate a more systematic way to get consolidated information for their decisions. There are proposals for additional management level services in the direction above.

7 Findings – ATM R&D Experts VDR is mainly used by ATM R&D experts. The majority use it as one way to get info among many other ways. There appears to be a small hard core (3 out of 16) of dedicated VDR users. VDR is used more to get general information or info about a specific ATM area. It is not used to analyse problems. The VDR content is reliable, relevant and is presented appropriately. However it is not complete and current enough. HMI and functionality is not intuitive but all in all acceptable. The VDR Team support is appreciated.

8 Findings – ATM R&D Information There are very diverse practices to get ATM R&D info. Almost no practice is consistently applied by many participants. There is a certain preference for subjective practices. Most popular are webbish or personal / informal ways. Least popular are VDR and ARDEP. However for nearly all participants the dissemination of results is important. The majority of participants require dedicated project web sites together with a permanent general repository or index for the results. Search criteria should be project and area-wise. Obviously this requirement is not yet met. The VDR is not perceived as a sufficiently complete solution.

9 Here we are – where to go? A detailed evaluation report will be available at the Validation User Group Web Site: