SCG/7 14-15 May 2008 Item 2.2 – AP01 Deployment of the ATM Master Plan IP1 Dimitris APSOURIS EUROCONTROL DAS/SIS.

Slides:



Advertisements
Similar presentations
1 Welcome Safety Regulatory Function Handbook April 2006.
Advertisements

Work Plan Development Guidelines and Schedule.
Annual Growth Survey What is the AGS? A communication, which sets out the economic and social priorities for the EU in 2013 Launches the next European.
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Industry Viewpoint – Block 0 Carlos Cirilo Assistant Director Infrastructure Strategy 16 November 2012.
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
ESA Iris Programme workplan of activities
VARTAN – Validation Reporting Templates Jürgen Teutsch, NLR CAATS Workshop, 16-Feb-2006, Lanzarote.
1 Item 2.7 ECIP developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008.
The EUROCONTROL Validation Planning Process
European Single Sky ImPlementation ESSIP DEVELOPMENTS Reference: SCG/10/AP05 – Action Paper 05 Christian Coëffé Head of European Single Sky Implementation.
EA Demonstration Study : Dissemination Forum – 8 June Welcome Alessandro Prister CND/CoE/IM EA Unit Manager.
1 Item 2.6 SES Reporting Working Group Reference: Information Paper SCG/8/IP03 Danny DEBALS LCIP Manager SCG/8 – 14/15 th May 2008.
1 Item 4.5 LSSIP Development and SES Reporting Reference: Action Paper SCG/10/AP06 Danny DEBALS LSSIP Manager SCG/10 – 25 February 2009.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL 19 February, 2006 SESAR ATM Master Plan An introduction.
European Organisation for the Safety of Air Navigation ITEM 7 AGENCY BUSINESS PLANNING: Budget Process and Functional Budget Presented by the SCF Chairman.
NIGB NATIONAL INFORMATION GOVERNANCE BOARD FOR HEALTH AND SOCIAL CARE Moving Forward 2013 Background & Context: Key considerations Point / purpose of the.
UCET conference Birmingham November 2008 MTL: The UCET position.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
The Performance Framework Episode 3 - CAATS II Final Dissemination Event Laurent Tabernier EUROCONTROL Project Episode 3 Brussels, 13 & 14 Oct 2009.
Mission Trajectory Step 1 From planning to deployment.
ATM Master Plan Implementation Package 1 (IP1) CNS ATM Steering Group, UK CAA, 10.Feb /04/2017 EUROPEAN COMMISSION.
Table of contents 1 Manual of Operational Procedures (MOP) 2
Revision of WIPO Standard ST.14 Committee on WIPO Standards, third session Geneva 15 – 19 April 2013 Anna Graschenkova Standards Section.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Case interrelations Relationships and integration Episode 3 - CAATS II Final Dissemination Event John Harrison Hu-Tech CAATS II Brussels, 13 & 14 Oct 2009.
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Global Business Transformation Master (GBTM) Certification
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
BUSINESS CASE Episode 3 - CAATS II Final Dissemination Event Ignacio Zozaya Boeing Research & Technology Europe CAATS II Brussels, 13 & 14 Oct 2009.
SESAR Single European Sky Air traffic management Research
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
David Bowen Head of ATM Operations and Systems
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
Scene setting for CAATS II Episode 3 - CAATS II Final Dissemination Event Carlos Regidor Isdefe CAATS II Brussels, 13 & 14 Oct 2009.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion The new architecture for cohesion policy post-2013 High-Level Meeting on the.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Nigel Makins EUROCONTROL
Software Engineering - I
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Recommendations on project/action design and structure.
PG-26765: Culture and People
Kick Off Meeting Largs, Scotland
ESA Iris Programme workplan of activities
Safeguarding flight data and locating/recovering on-board recorders
WG-I #16 Meeting SESAR Security Tasks
Christian Ansorge Arona, 09/04/2014
ESS Validation State of Play and next steps
How do airports plan to solve their future ATM challenges?
"IT principles" Context, roadmap
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
Water Directors meeting
Quality Risk Management ICH Q9 Frequently Asked Questions (FAQ)
Item 7.5 (2012-ETS-16) – Statistics on Special Needs Education
Marine Strategy Framework Directive (MSFD)
WG GES: Decision review progress
ESS.VIP Validation Item 5.1
Work of the task force on future censuses Agenda point 3.9
Presentation transcript:

SCG/ May 2008 Item 2.2 – AP01 Deployment of the ATM Master Plan IP1 Dimitris APSOURIS EUROCONTROL DAS/SIS

Background : context and general objectives Consistency of CND Programme with the SESAR IP1 related activities (remaining R&D, industrialisation and deployment) Analysis of Master Plan framework and mapping of CND Work- programme activities to that Identifying additional IP1 related headlines for submission to the ECIP process (ECIP preparation addressed by WP/….).

IP1 / SESAR& Master Planning phases (Identification of needs) V0 (Concept definition) V1 (Feasibility) V2 (pre-industrial development and integration) V3 (Industrialisation) V4 (Deployment) V5 (Operations) V6 (Decommissioning) V7 Target Concept and architecture R&D « Deployment » Activities potentially under SJU (Standardisation, regulation, guidance material, particular CBAs….) IP1: SESAR Implementation Package 1 ATM capability levels (CP) & service levels (SL): 0 & 1 95 Operational Improvement Steps (OIs) and 38 Transversal Improvement Steps (TIs) for which Initial Operational Capability (IOC) is by 2013

Links of Short Term CND activities with IP1

Conclusions Initial assessment shows a good coverage of the Deployment Work Programme (IP1) OI/TI steps by the CND Work Programme activities. Further analysis is required to identify more precisely the CND activities contributing to the ATM Master Planning Framework processes (e.g. Master Plan maintenance) for IP1 and to explain as needed their contribution. The current level of description of the CND Work Programme does not always allow a clear relation to the Master planning lifecycle phases. Further analysis work is required to support decision on the eligibility of the remaining IP1 R&D work remaining (for some IP1 OIs/TIs steps) to the SJU programme. The decision above will influence potentially the CND contribution to the SJU. Until such time that this decision is known at the end of the negotiation of the CND contribution to the SJU, there is no need to review the agreed prioritisation of the 2009 CND Work Programme.

IP/1 IP/2 & IP/3 OI/TI step lifecycle phase < V5 ? Existing CND work associated ? Prerequisite * nature of work ? NOT mature enough for ECIP Existing ECIP objective ? OI/TI step 100% covered ? ECIP translation already done Candidate for ECIP (new of modification) No Yes No *prerequisite means that associated work needs to be successfully completed before Stakeholders can decide on the effective implementation Yes How to identify SESAR IP/1 candidates for ECIP

Mapping OI/TI steps to CND and to to ECIP Step 1 Step 2 Step 3

Outcome of the analysis The analysis shows a good coverage, by the ECIP , of the IP1 OI/TI steps mature for implementation. A total of 10 Improvement steps have been identified, which would potentially lead to: the creation of 2 new ECIP objectives; and the addition of SLoAs to 6 already existing ECIP objectives.

List of OI/TI steps candidates

TF/4 outcome The CND work programme is addressing IP1 and the coverage is good, but further refinement is needed to fully describe the mapping Delivery of the 2013 baseline is dependent on stakeholder commitment The ECIP process is the only currently available means for driving IP1 deployment Proposed additional IP1 related ECIP Objectives and SLOAs were supported for inclusion in the cycle, but additional justification material was needed ahead of the discussions at SCG/8 (SCG/8/FL06)

Recommendations The Members of the SCG are invited to: a)Consider the initial results of the analysis of the CND Work Programme contribution to the ATM Master Plan Implementation Package 1 (IP1). b)Note that further work is required in order to: i)better assess activities associated with the ATM Master Plan Framework supporting processes for IP1 ii)further assess the contribution of CND activities to IP1 (i.e. refine content analysis), particularly streamlining CND activities descriptions with the Master planning lifecycle phases c) Endorse the proposed way forward with regards to the integration of IP/1 related headlines into the ECIP process.