1 Review of Recent Run L. Coney – UCR MICE CM34 – Oct 2012.

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
MICE Online Linda R. Coney UCR MICE CM30 Oxford July 2011.
1 Project Management Web Tools at the MICE Experiment Linda R. Coney – UC Riverside CHEP – May 2012.
SOFTWARE & COMPUTING Durga Rajaram MICE PROJECT BOARD Nov 24, 2014.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Project manager report paul drumm CM16 October 2006.
1 Operations Summary L. Coney – UCR MICE CM34 – Oct 2012.
1 Online Summary and MICE Operations Linda R. Coney – UCR CM35 – 16 Feb 2013.
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
MOM Report Victoria Blackmore VC /06/11 1/7.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Online Reconstruction 1M.Ellis - CM th October 2008.
National Enrolment Service (NES) Overview October 2015 – June 2016.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Linda Coney MICO June 6, 2011 MICE Online Report.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Online & Operations Summary Linda R. Coney UCR MICE CM32 – RAL Feb 2012.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Machine operation and daily maintenance management in SOLEIL
MICE Computing and Software
Status of the MICE Construction Project
Project Manager’s Report + DC/MoM Report
CLAS12 Calibration and Commissioning (CALCOM)
Controls & Monitoring in MICE
Presentation transcript:

1 Review of Recent Run L. Coney – UCR MICE CM34 – Oct 2012

2Coney - CM34 - Oct 2012Outline Organization & Preparation Organization & Preparation Shifters Shifters Goals of Run Goals of Run Issues Issues Next.. Next..

3Coney - CM34 - Oct 2012 Organization & Preparation Micemine Run Plan worked well Micemine Run Plan worked well s/wiki/RunPlan s/wiki/RunPlan s/wiki/RunPlan s/wiki/RunPlan

4Coney - CM34 - Oct 2012 Organization & Preparation Run plan continued… Run plan continued… Used to schedule shifters and software experts Used to schedule shifters and software experts Used to lay out daily plan Used to lay out daily plan

5Coney - CM34 - Oct 2012 Organization & Preparation Run plan wiki page used to define beamline configurations for data requested (although not primary goal for this run period) Run plan wiki page used to define beamline configurations for data requested (although not primary goal for this run period)

6Coney - CM34 - Oct 2012Shifters… As of CM33, we have a shifter training regime As of CM33, we have a shifter training regime And have trained some people to be qualified shifters (intro role) and Lead Shifters (more advanced) And have trained some people to be qualified shifters (intro role) and Lead Shifters (more advanced) However… However… Recent running has made the need for more qualified/trained individuals very clear Recent running has made the need for more qualified/trained individuals very clear

7Coney - CM34 - Oct 2012 Need New/More Shifters Recognized the need for training – now need to implement training Recognized the need for training – now need to implement training Difficult to do while running – difficult to properly train w/o running Difficult to do while running – difficult to properly train w/o running Need some training w/o beam but with equipment Need some training w/o beam but with equipment Develop training schedule Develop training schedule Corollary – develop training updates when new equipment arrive Corollary – develop training updates when new equipment arrive Need all MOMs able to lead/arrange training Need all MOMs able to lead/arrange training Sign up more MICE – THIS MEANS YOU! Sign up more MICE – THIS MEANS YOU! Cannot exploit tiny group of (primarily UK-based) dependable individuals Cannot exploit tiny group of (primarily UK-based) dependable individuals This becomes even more true for Step IV running This becomes even more true for Step IV running

8Coney - CM34 - Oct 2012 Goals of Running Test significant upgrades and changes to both the Online Systems and MAUS software packages – NOT to take data Test significant upgrades and changes to both the Online Systems and MAUS software packages – NOT to take data Overall Online Overall Online New OS installed on all MLCR computers New OS installed on all MLCR computers New master server, new account setups, new UPSs New master server, new account setups, new UPSs DAQ DAQ Final live data test of new DAQ system – upgraded DATE & OS Final live data test of new DAQ system – upgraded DATE & OS New interface with C&M New interface with C&M New DAQ hardware New DAQ hardware C&M C&M Full read/write from CDB Full read/write from CDB Overall system test of Step I Run Control Overall system test of Step I Run Control Expert testing/feedback on Run Control Expert testing/feedback on Run Control New HV user docs New HV user docs Software Software Online test server setup functional Online test server setup functional New control room branch of MAUS New control room branch of MAUS Improved TOF/CKOV online plots Improved TOF/CKOV online plots

9Coney - CM34 - Oct 2012 Goals of Running DAQ – Yordan’s talk DAQ – Yordan’s talk C&M – Pierrick’s talk C&M – Pierrick’s talk Software – Chris Rogers’ talk this morning Software – Chris Rogers’ talk this morning Mixed results – confirm that we DO need regular running Mixed results – confirm that we DO need regular running Partially successful Partially successful Unfortunately – not smooth run – while this was expected due to the many changes, many of the problems were not anticipated Unfortunately – not smooth run – while this was expected due to the many changes, many of the problems were not anticipated No real useful data until Sunday….although this was not the goal of the run No real useful data until Sunday….although this was not the goal of the run

10Coney - CM34 - Oct 2012 Recent Run – Issues Target Target Fatal error in operation – related to laser gain Fatal error in operation – related to laser gain Discovered before frame lowered – required remote expert intervention Discovered before frame lowered – required remote expert intervention Target DAQ display (RATS) did not start correctly – would not update – required remote expert intervention Target DAQ display (RATS) did not start correctly – would not update – required remote expert intervention ISIS beam loss did not correlate – tripped ISIS (3V+) when target DAQ showed below 2V ISIS beam loss did not correlate – tripped ISIS (3V+) when target DAQ showed below 2V Needed expert every day Needed expert every day HV controls HV controls SY527 remote control not working – required C&M expert on site to fix (related to ongoing work for new HV system – interfered) SY527 remote control not working – required C&M expert on site to fix (related to ongoing work for new HV system – interfered) Luminosity monitor Luminosity monitor Power supply turned OFF incorrectly (left at 10.7 V instead of ramped down) Power supply turned OFF incorrectly (left at 10.7 V instead of ramped down) DAQ crate not turned ON DAQ crate not turned ON Suspect result of UPS installation – systems not returned to original state Suspect result of UPS installation – systems not returned to original state

11Coney - CM34 - Oct 2012 Recent Run – Issues DAQ – crashed/needed expert intervention DAQ – crashed/needed expert intervention C&M C&M Some new applications not working Some new applications not working Application launcher start issues Application launcher start issues Neutron monitor readout not working Neutron monitor readout not working All required on-site expert intervention – in addition to new systems being tested All required on-site expert intervention – in addition to new systems being tested Online Monitoring Online Monitoring Gone – result of changeover to new DAQ – will probably not be easy to resurrect Gone – result of changeover to new DAQ – will probably not be easy to resurrect Online Reco/MAUS Online Reco/MAUS Did not work – new plot upgrades could not be tested – bug, plots not filled Did not work – new plot upgrades could not be tested – bug, plots not filled Software group is assessing prep process and will debug offline Software group is assessing prep process and will debug offline Will need to test at later date Will need to test at later date Datamover Datamover Crashed first time run Crashed first time run Crashed again when attempted to fix Crashed again when attempted to fix Need expert phone or debugging documentation Need expert phone or debugging documentation

12Coney - CM34 - Oct 2012 Way Forward.. We are making progress We are making progress Previously we were focused on getting the basics going – Implementation of necessary functionality Previously we were focused on getting the basics going – Implementation of necessary functionality Now – move focus to reliability Now – move focus to reliability Need to KEEP THINGS WORKING! Need to KEEP THINGS WORKING! Schedule regular 3-day weekend runs Schedule regular 3-day weekend runs MAUS – already using “release” system of changes MAUS – already using “release” system of changes C&M C&M need do same with the controls and monitoring code need do same with the controls and monitoring code Stabilize applications Stabilize applications Development computer/system separate from iocpc1/iocpc2 Development computer/system separate from iocpc1/iocpc2 Coordination between C&M developers must happen Coordination between C&M developers must happen DAQ – staged upgrades – especially with new equipment DAQ – staged upgrades – especially with new equipment

13Coney - CM34 - Oct 2012 Regular Running Why? Why? Implement changes Implement changes Operate equipment long idle Operate equipment long idle Practice Practice Train shift personnel Train shift personnel Learn Learn NEED coordination of vital personnel NEED coordination of vital personnel Worked (almost) this time Worked (almost) this time CDB expert on leave CDB expert on leave MAUS expert in US in advance of run MAUS expert in US in advance of run Software/on call experts/remote availability Software/on call experts/remote availability If you are responsible for a system you must be contact-able If you are responsible for a system you must be contact-able

14Coney - CM34 - Oct 2012Summary While not exactly smooth…run last weekend accomplished much of what needed to do While not exactly smooth…run last weekend accomplished much of what needed to do Clear need for more trained shift personnel Clear need for more trained shift personnel Clear need for regularly scheduled running Clear need for regularly scheduled running

15Coney - CM34 - Oct 2012

16Coney - CM34 - Oct 2012 MICE Step IV Includes both Spectrometer Solenoids Includes both Spectrometer Solenoids Two trackers installed within the SS magnets Two trackers installed within the SS magnets One AFC (Focus Coil magnet & Absorber) One AFC (Focus Coil magnet & Absorber)

17Coney - CM34 - Oct 2012 New Equipment… We will have much more in the Hall! We will have much more in the Hall!

18Coney - CM34 - Oct 2012 Step IV: Operations & Online Moving toward Step IV running Moving toward Step IV running Many configurations to test/run Many configurations to test/run Long term running/every opportunity taken Long term running/every opportunity taken All ISIS cycles – every day – Differs from past Operations All ISIS cycles – every day – Differs from past Operations Develop idea of not-so-remote control room Develop idea of not-so-remote control room Develop plan for staffing & commissioning of cooling channel Develop plan for staffing & commissioning of cooling channel Develop robust system of Operations Develop robust system of Operations Includes all facets of Online Group (DAQ, C&M, Online Reconstruction/Analysis, Infrastructure) Includes all facets of Online Group (DAQ, C&M, Online Reconstruction/Analysis, Infrastructure) Goal – next phase of Operations Goal – next phase of Operations Functional Functional Safe/Secure Safe/Secure Reliable Reliable Easy to use Easy to use

19Coney - CM34 - Oct 2012 Step IV – Operations Continue: Continue: Pre-run prep Pre-run prep Further simplify running Further simplify running Improve: Improve: Automate procedures  fewer errors Automate procedures  fewer errors Move from spreadsheet  only ConfigDB Move from spreadsheet  only ConfigDB Increase Online Reconstruction capabilities Increase Online Reconstruction capabilities Complete suite of detectors, Online analysis, Global reco Complete suite of detectors, Online analysis, Global reco Reduce required number of shifters… Reduce required number of shifters… New equipment arriving – plan for support & expertise New equipment arriving – plan for support & expertise Modify procedures to include SC magnets and LH2 system Modify procedures to include SC magnets and LH2 system Train shift personnel Train shift personnel Develop plan to staff multitude of shifts Develop plan to staff multitude of shifts

20Coney - CM34 - Oct 2012 Step IV – Operations Safety Safety Need understand implications under STFC rules of new equipment Need understand implications under STFC rules of new equipment Made arrangements to meet with Jane Vickers (ISIS safety) to begin preparation/planning Made arrangements to meet with Jane Vickers (ISIS safety) to begin preparation/planning Need understand from experts what each system entails/requires for operation Need understand from experts what each system entails/requires for operation PPS PPS Need understand implementation of system with SC magnets and LH2 system Need understand implementation of system with SC magnets and LH2 system Hall Access Hall Access Limited – not every day – scheduled access only Limited – not every day – scheduled access only Increase efficiency of data-taking Increase efficiency of data-taking Hall search dropped twice in 3 days last weekend. Not acceptable. Hall search dropped twice in 3 days last weekend. Not acceptable. Experts must be available Experts must be available

21Coney - CM34 - Oct 2012 General Operations SS1, SS2, Tracker1, Tracker2, FC, solid absorbers, LH2 absorber & system SS1, SS2, Tracker1, Tracker2, FC, solid absorbers, LH2 absorber & system SS commissioning SS commissioning How will this work? How long? How will this work? How long? Access needed to magnet? How often? Access needed to magnet? How often? Tracker commissioning Tracker commissioning How done? How long? Plan for alignment? How done? How long? Plan for alignment? Analysis immediate? Or delayed? Analysis immediate? Or delayed? What access required? What access required? LH2 + FC system commissioning LH2 + FC system commissioning Needs 1 month Needs 1 month Once LH2 system in place – not coming out again Once LH2 system in place – not coming out again

22Coney - CM34 - Oct 2012 Operations Organization Overall Operations Manager Overall Operations Manager Local, familiar with STFC safety and operational systems Local, familiar with STFC safety and operational systems Provide oversight, link between MOMS, safety responsibility from project manager Provide oversight, link between MOMS, safety responsibility from project manager Monthly MOMs Monthly MOMs On call for 1 month – Daily running duties as now On call for 1 month – Daily running duties as now MICE Shift personnel MICE Shift personnel Currently 2 shifters for ~8 hour shift Currently 2 shifters for ~8 hour shift Prefer to move to 1 MICE shifter Prefer to move to 1 MICE shifter Current on-call experts – BLOC, SOC, TROC Current on-call experts – BLOC, SOC, TROC New system-specific experts – 3 per system – not necessarily current MICE New system-specific experts – 3 per system – not necessarily current MICE Magnet & cryo experts – maintenance of magnet systems, manage cryogens and vac pumping rigs & instrumentation, cooling and powering expert, quench behavior expert Magnet & cryo experts – maintenance of magnet systems, manage cryogens and vac pumping rigs & instrumentation, cooling and powering expert, quench behavior expert LH2 expert – control engineering knowledge, safety procedures LH2 expert – control engineering knowledge, safety procedures

23Coney - CM34 - Oct 2012 Step IV Operations Given current MICE schedule for Step IV equipment and installation… Given current MICE schedule for Step IV equipment and installation… We must be prepared for 24/7 running in order to get Step IV data before ISIS shutdown in August 2014 We must be prepared for 24/7 running in order to get Step IV data before ISIS shutdown in August 2014 Can our systems handle this? Can our systems handle this? Target ok? Magnets ok? Target ok? Magnets ok? DAQ ok? Controls ok? Datamover ok? DAQ ok? Controls ok? Datamover ok? Shift coverage ok? Shift coverage ok? Another reason to limit Hall access. Another reason to limit Hall access.

24Coney - CM34 - Oct 2012 Floor Open.. Questions? Questions? Suggestions? Suggestions? Volunteers? Volunteers?

25Coney - CM34 - Oct 2012

26Coney - CM34 - Oct 2012 Step IV: Operations & Online Functional Functional DAQ – incorporate all detectors – improve rate DAQ – incorporate all detectors – improve rate DAQ upgrades DAQ upgrades All C&M for each element All C&M for each element Alarm Handler values set appropriately Alarm Handler values set appropriately Add capability to Online Reco/Analysis Add capability to Online Reco/Analysis Automate run infrastructure – Run Control Automate run infrastructure – Run Control Automatic use – read/write to Configuration Database Automatic use – read/write to Configuration Database Safe/Secure Safe/Secure Incorporated fully commissioned PPS Incorporated fully commissioned PPS Implemented formal shifter training Implemented formal shifter training Updated Operations/Online documentation & instructions Updated Operations/Online documentation & instructions Developing comprehensive list of safety-critical maintenance Developing comprehensive list of safety-critical maintenance Updating safety paperwork – developing overall system for MICE Updating safety paperwork – developing overall system for MICE Using new target controller with all necessary interlocks & BPS Using new target controller with all necessary interlocks & BPS Online system security reviewed – improvements made Online system security reviewed – improvements made Access limited to micenet Access limited to micenet

27Coney - CM34 - Oct 2012 Step IV: Operations & Online Easy to use Easy to use Simplified Ops procedures – single key exchange ISIS Simplified Ops procedures – single key exchange ISIS MICE control access to Hall MICE control access to Hall Improving Online Reconstruction/Data Quality plots Improving Online Reconstruction/Data Quality plots Need add Online Reco for KL/EMR/Accel Analysis Need add Online Reco for KL/EMR/Accel Analysis Run Control Run Control Mature Alarm Handler Mature Alarm Handler Reliable Reliable New OS implemented – automatic updates New OS implemented – automatic updates Automatic/systematic backups in place Automatic/systematic backups in place New DAQ and C&M computers installed New DAQ and C&M computers installed UPS coverage for critical systems UPS coverage for critical systems Developing “stockroom” of spares – crates/computers/etc Developing “stockroom” of spares – crates/computers/etc Automatic write to EPICS Archiver Automatic write to EPICS Archiver Extensive remote monitoring of equipment/computers/hardware/environment in EPICS Extensive remote monitoring of equipment/computers/hardware/environment in EPICS Archive of all software – Launchpad repository Archive of all software – Launchpad repository