JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Status Argo TC, M. Belbeoch.

Slides:



Advertisements
Similar presentations
STRENGTHENING FINANCING FOR DEVELOPMENT: PROPOSALS FROM THE PRIVATE SECTOR Compiled by the UN-Sanctioned Business Interlocutors to the International Conference.
Advertisements

WMO WIGOS Implementation & (WIP) RA I Sub-Regional Workshops for WIGOS and WIS for West / North Africa Nov 2013 Dr I. Zahumensky, WIGOS-PO.
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
Overview of the Global Fund: Guiding Principles Grant Cycle / Processes & Role of Public Private Partnerships Johannesburg, South Africa Tatjana Peterson,
AST 16 March 2015 Deployment Opportunities Deployment Opportunities Update for AST 16 M. Kramp.
PERFORMANCE FOR ALL The Project & the System. A HE project co-ordinated by University of Bristol, open to HE internationally. Developing the requirements.
Data Buoy Cooperation Panel Hester Viola
JCOMM Observing Programme Support Centre Activities, future directions and opportunities. JCOMM III, Nov. 2009, Marrakech Mathieu Belbeoch & Hester Viola.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Argo Information Centre Report M. Belbeoch, Argo TC ADMT #10, Toulouse, France September 2009.
Argo September 2004 The status of the Argo project What is Argo trying to do How is it doing it? What have we achieved so far? What has happened since.
Argo Status & issues for ADMT Argo TC ADMT#13 November 2012, Hyderabad.
ICZM in Europe Anne Burrill
Argo & AIC Development Argo TC DBCP #22 La Jolla, California.
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status Argo TC, M. Belbeoch.
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B History of centralized ANSN website as well.
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
Argo Status Argo TC AST#13 March 2012, Paris nations maintain the global array and 20 more fill regional gaps 18 countries active in 2011 (16 inactive)
DBCP-21, Buenos Aires,17-21 October 2005, JCOMMOPS (1) JCOMM in situ Observing Platform Support Centre Most developments now achieved –Infrastructure in.
JCOMMOPS & Argo, DBCP, SOT, OceanSITES 2 nd GODAE Observing System Evaluation Workshop Toulouse, June 2009 Mathieu Belbeoch & Hester Viola.
JCOMM Observing Programme Support Centre International Coordination and Gliders EGO #4, Cyprus Yves Desaubies Mathieu Belbeoch Hester Viola.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch AST#13 Paris, March 2012.
The Data Buoy Cooperation Panel (DBCP) Joint Meeting of the International Program for Antarctic Buoys (IPAB) and the International Arctic Buoy Program.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
JCOMMOPS JCOMM Observing Program Support Centre M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden A Community Initiative concerning Transnational co-operation on spatial.
Deployment Opportunities M. Belbeoch DBCP #27 September 2011 Geneva, Switzerland.
1 Standard Float Cycle  Drifting Depth: 1000 m  Profiling Depth: 2000 m  10 Days Cycles.
Monitoring and management of ship logistics opportunities M. Belbeoch PMO IV December 2010 Orlando, USA.
Ministerul Mediului si Gospodaririi Apelor Session 6 - Enhancing National GEF Coordination, Communication and Outreach Developing the National Capacity.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
Bob Keeley Marine Environmental Data Service Dept. of Fisheries and Oceans Ottawa, Canada Jun, 2006 SeaDataNet Meeting.
Future Perspectives of Ocean Observatories in Germany [Name of the infrastructure / site / time series…] Contact person: [name, ] [Institution(s)
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
Argo & New Telecom. Systems Technical Workshop Introduction and Summary. ADMT#11 October 2010, Hamburg/Germany.
Kiichiro Fukasaku Development Centre
Silver Spring HRMM Workshop April Global Ocean Surface Underway Data project (GOSUD) Theirry Carval – Coriolis Ifremer Bob Keely – MEDS Thierry.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
DBCP 31 October 2015 Deployment Opportunities Deployment Opportunities Update for DBCP 31 JCOMMOPS.
IOC Assembly June 2015 JCOMM in-situ Observations Programme Support Centre.
The Argo Project: An International Partnership Dean Roemmich, International Argo Steering Team The role of partnerships in: Creating Argo Coordination.
JCOMM Observation Programmes Support Centre – Argo Information Centre September 2015 Argo Status Argo TC, M. Belbeoch.
1 The Argo project 21st Century in-situ Ocean Observing System M. Belbeoch, Argo Technical Coordinator with inputs from D. Roemmich, Argo Steering Team.
Argo Programme – activities in Japan – Keisuke Mizuno (JAMSTEC) Argo is a global array of 3,000 free-drifting profiling floats that measure temperature.
JCOMM Observation Programmes Support Centre – Argo Information Centre November 2014 Argo Status Argo TC, M. Belbeoch.
"Learning and achievements of SWA Global platform and its relevance to achieving Hygiene and Sanitation Development in India" India WASH Summit 17 th February.
2nd Workshop on WIGOS Data Quality Monitoring and Incident Management (Geneva, December 2015) JCOMM Quality Monitoring and the role of JCOMMOPS Etienne.
Status of the Global Ocean Observing System – April 2015 David Legler, Director Climate Obs Division NOAA Climate Program Office OOPC – April 2015 Sendai,
JCOMM in situ Observations Programme Support Centre 04 March 2016 Argo Status Argo TC, Mathieu Belbéoch.
M. Belbéoch, 8 June 2018 Global Argo Status M. Belbéoch,
JCOMM in-situ Observations Programme Support Centre www. jcommops
Bismark Mzubanzi Tyobeka
IBPIO Report 2015/2016 Intercessional Period
What is JCOMMOPS JCOMMOPS occupies a unique place as the focal point for the practical coordination of the in-situ ocean observing systems defined by JCOMM.
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
Technical Cooperation Section SEDI- Executive Office
JCOMM in-situ Observations Programme Support Centre www. jcommops
Scanning the environment: The global perspective on the integration of non-traditional data sources, administrative data and geospatial information Sub-regional.
Introduction on the outline and objectives of the workshop
Challenges & opportunities for developping regional cooperation
JCOMM in-situ Observations Programme Support Centre www. jcommops
WMO Global Campus: Open Educational Practice in Action
Argo Information Centre & Argo Users
Presentation transcript:

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Status Argo TC, M. Belbeoch

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Status International issues General status Metrics, Objectives, Performance Implementation: coverage status Instrumentation Conclusion & actions Conclusion

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 National contributions 30/38 participating countries 12 maintain 95% of the array News: Brazil, South Africa, Mexico, Indonesia, Russian Fed., Vietnam, Oman, Turkey, Oman, Maghreb, Lebanon, West. I. O.

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 National contributions Argo needs more floats to reach the global Can national contributions grow by 10 to 20% ? Donor programmes are important (foster participation on the long run, communicate to coastal states people, access maritime zones, enhance international political support to the program, raise educational actvities) … Can also take ages. JCOMMOPS/AIC is seeking floats to contribute (co-operations, education) (bilateral not always the best) and help national contributions: – Institutional funding, Industrial partners, foundations, sponsors, sailing world, crowd sourcing Possibilities are under exploited 146 IOC Member States … concerned by ocean issues.

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indices #0 Active Floats – Initial array sustained for 7 years – 2 last years above 3500 – Mid-way to the global Deployments – Light decrease but above initial target in average (~800) – 2009 CTD issue sequels ? Budget cuts ?

JCOMM Observation Programmes Support Centre – Argo Information Centre March Active Floats

JCOMM Observation Programmes Support Centre – Argo Information Centre March

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Deployments

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Deployments

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 National contributions Active national fleets stable or lightly increasing – USA, France, Australia, Italy, UK – Float lifetime, research projects, or punctual funding boost Some are decreasing: – Japan, Germany, Canada (-200 floats in 3 years) – Budget cut ? Hardware issues (e.g. CTD 2009)? Logistics ? Staff turnover? Float delivery or deployments – Temporary ? Array is anyway stable

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance of data flow To see ADMT Volume, delays, users

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Network Diversification Any limitation? Many positive outcomes – Grow « customers » community – Multidisciplinary applications – Medias interest – Resources sharing – Logistic sharing and why not instruments Argo has some leadership and experience New comers should fund DM and infrastructure properly See agenda 8.x

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Label Delivered to PIs, then to manufacturers Do not order sparingly… 3 euros/units (1-2 years minimum) Do not use systematically Proposal: Charter for new customers. – Secure official Argo content and national programmes – Oversee all its components and new ones – Welcome and assist new float users – Promote and support existing services from the infrastructure in place Data management, AIC, deployments, etc. JCOMMOPS wish to develop such a « certification » for all its components Mutual interest to promote best practices (Argo being the larger float customer)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 ATTENTION: Use of the official Argo label Considering the diversity of profiling float users, Argo requires that its label must be used only for those floats which are officially part of the Argo program, and not automatically affixed on any profiling float. We are developing an “Argo charter” to be made available to profiling float customers. Until this is available, the Argo label should be used only in agreement with the Argo programme. Argo float operators should adhere to the Argo Best Practices, including: International cooperation within the Argo Steering and Data Management teams Transparent practices under UN framework, and respect of international regulations (UNCLOS, IOC/UNESCO Resolution XX-6 and EC-XLI.4) Free and unrestricted data exchange (in real-time and delayed mode) Standardized practices in data and metadata distribution Careful securing and retrieval of beached instruments Instrument registration at JCOMMOPS (including deployment plans) Harmonized practices in sampling and cycling * (*) Equivalent contributions to the Argo programme with specific research objectives are also welcome. In particular, manufacturers must inform the Argo Technical Coordinator of any new allocation of these labels. Send an to or “Customer X wishes to operate N floats under the Argo label”.

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo label Remark from one AST member Argo / non-Argo: different pricing to encourage more participation in Argo and best practices. Issue: real Argo floats cost more in reality

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Objectives What is the optimal Argo array? How to build simple performance indices for a complex question? How to consider scientific (various), and operational objectives How to communicate properly outside (public, agencies, etc) – critical but important Required within AST to optimize and balance the array and detect issues ? Required by JCOMM OPA, OOPC, etc for a « system perspective » Difficult for the TC to offer tools if objectives/results are not translated into clear « algorithms ». AST guidance required Meeting in Toulouse in April (NOOA/OSMC, OOPC, IOC, WMO) April 2014

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Objectives Base grid used to calculate rationally a number of metrics (AST 14) To allow tracking in time, comparisons, globally and regionally To consider Argo’s array evolution to the global and regional specificities It is not anticipated to populate each box with floats !

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Objectives Base grid to be refined reasonably ( boxes) Marginal seas, coastal areas, history, criteria ? AST to feedback A fixed grid permits to calculate routinely indices, perform « spatial analyses » Goal: build a dashboard style monitoring system

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Objectives Estimation in each area (basin, sub basin, specific density, custom) of: – active units, required units – yearly deployments needs – comparison to practices, plans, gaps – simple performance indices « Simple » calculations interesting to do Between the global, and the local (3X3), regional indices make more sense.

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #1 BASINBoxes (#)Initial (#) Global (#)Active(%) Initial Design Pacific Ocean Atlantic Ocean Indian Ocean Extensions Southern Ocean Arctic Ocean Carribean Sea Med. Sea Gulf of Mexico South China Sea Sea of Japan Banda Sea Black Sea Celebes Sea Makassar Strait Sea of Okhotsk Sulu Sea TOTAL Global Design

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #1 ~600 floats are operating outside the initial array ~600 floats are required for the global.

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #1 133%, 111%, %, 95%, 80 96%,76%, 234 N/A, 36%, 205 N/A, 45%, 77 %vs initial, % vs global, floats required for the global

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #1 Marginal Seas: 58%, 68 Equatorial: 63%,89 WBC: 53%, 410 TPOS: 93%, 40 Polar: 39%, 282

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #1 42%, %, %, 40 90%, 8 40%, 15 70%, 33 42%, 61

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #1: Active units Initial array is achieved in each basin Light excess in the Indian Ocean (but not where needed) Deficit for the global in the Atlantic (WBC but not only) Array enhancements implementation is well started.

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #2: Deployed units Deployments required vs practices Objective: 4.1 years lifetime (150 cycles) Reality with instruments (see later) ~720 units/year required for the initial Argo ~1000 units/year for the Global Argo. We need an extra 10-20%.

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #2

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #2 133 / / / / / 0-27 AVG Deployments in / target initial-global 101, 0-39

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #2 Pacific: – No real deficit – Yearly increase required ~40 floats Atlantic: – deficit of 234 units – but excess in yearly deployment vs global objectives (60 units) – suggestion (EU / USA) ? Indian: – Excess ( floats ?) circulation? – Since that, recurrent deficit in deployments, even for the initial design – ?? Why budget ? International cooperation ? Southern ocean: – 200 units starting deficit – needs 25 more units per year Arctic ocean is okay Marginal seas: over sampled x2 (certainly the design is to be reviewed)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Deployments - History

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Observations

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Deployments Historical challenging areas: – No local and routine scientific interest – Logistics: dedicated ship time and resources required (see 5.3) – Geopolitics (specific zones to be addressed, see 9.3)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Maritime Zones

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Deployments / Maritime Zones

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Yearly Deployments: 2013

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Yearly Deployments

JCOMM Observation Programmes Support Centre – Argo Information Centre March Deployments vs 2013 Objectives Some areas have been implemented without clear gaps identified. Which means over sampling in 2014 in these zones Strategy (anticipating the drift) ? Update of the global design required? Lack of deployment opportunities? To send floats outside you area of scientific interest to balance the array. To ask M. Kramp assistance (see 5.3)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Density 6°x6° Argo Density 6°x6° to update to the new design ?

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Argo Density/Age Argo Density/Age (Floats weighted by their probability to survive a year, « decimal floats » - update G. Johnson)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Detect and highlight gaps Hot Spots spatial/statistical analyse

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice: #3 - try What proportion of our array is optimally implemented ? Calculation: Sum of boxes density over the grid (initial/global), without counting the excess when the target is reached. Using Observations 2013, active floats, active aged floats

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice: #3 BASIN(obs/2013) (%)(active floats) (%) (active /age) (%) Initial Design Pacific Ocean Atlantic Ocean Indian Ocean Extensions Southern Ocean TOTAL Global Design Marginal Polar WBC EQ403632

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #3 Over a year ¾ of the initial array worked optimally This is better than a random distribution (~60%) The Pacific Ocean has slightly better coverage than the other basins Metric not appropriate for the public. Can be interesting to track in time. The objective is certainly not 100%. 60 % ?

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #3 (%) Not sampled0 Under sampled<75 Well sampled Over sampled>125

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #3

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Needs?

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Needs Needs (less strict)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Performance Indice #3 Beyond the need for higher density in WBC or eq. regions: – Large gaps are developing in the SW I.O. (and in the piracy zone). – In the central North Pacific – In the South Atlantic

JCOMM Observation Programmes Support Centre – Argo Information Centre March planning Almost all programmes sent their plans thanks! But we need to progress. Proposal: yearly TXT file to maintain for an automatic synchonisation between all systems. ID;WMO;LAT;LON;DATE;SHIP;CRUISE;STATUS STATUS = Probable (0), Confirmed (1), Registered (2) active (3), inactive (4), closed (5) Can be useful internally for program monitoring across a team

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Planning

JCOMM Observation Programmes Support Centre – Argo Information Centre March Planning

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Planning Some plans have to be refined Routine opportunities implie oversampling on the long run Some areas can’t still be implemented  Send floats on colleagues cruises  Use new opportunities  Set up dedicated/chartered cruises  Address EEZ access and develop cooperation

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Network Age

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Network Age Use spatial analyse to determine geographical trends (feature, weight, neighboring) Central IO and PO getting old Not the Atlantic (not suprising excess/year)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Telecom. 30% Iridium

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Iridium vs Argos 60% dep./year : Slow turnover (R & D) : Take off (inflexion mid 2012)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Float models

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Float market

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Reliability CPF= (2005, 2006)

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 TO DO Conclusion TO DO Argo has demonstrated its capacity to sustain the array Its on his way to the global. IO: attention, gaps and old AO: maybe seeding elswhere (EU, USA), e..g SW IO PO: good coverage but getting old too. Float reliability looks good. But takes time to evaluate (low cost floats ? Less battery ? approrpiate) More intl cooperation, and slightly more resources (national, private, crowd) and we can reach the global We need better metrics to track its progress and build up the « Argo control dashboard ». Better planning and resources sharing required (shared cruises, charters, etc) Improve communication and cooperation with industry Communicate on the new targets and new challenges to keep Argo visible. Develop outreach …and democratize access to Argo information Clarify our position with regard to the « multidicsiplinary turn »

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Actions International cooperation targets for the TC and Director Label/charter proposal Planning proposal Metrics proposal Other tasks or issue for the TC ?

JCOMM Observation Programmes Support Centre – Argo Information Centre March 2014 Thanks.