Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
1 Item 2.7 ECIP developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008.
Advertisements

Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Mission Trajectory Step 1 From planning to deployment.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Traffic Management and FUA integration
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR

ESSIP Plan 2013 / Objective AOM 192 Objective AOM19 Comprehensive Explanation What is new or has changed since LSSIP 2012 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2012 Objective Coordinators Analysis, recommendations, tips & tricks Links and contacts

ESSIP Plan 2013 / Objective AOM 193 Comprehensive Explanation Area of applicability: All ECAC States Initial Operational Capability (IOC): 01/2011 Full Operational Capability (FOC): 12/2016 Establish a collaborative civil-military airspace planning at the European Network level by: Integrating ASM and ATFCM processes into the day of operations, Maximising use of capacity available and improved updates of the airspace status, Consistent application of FUA Concept across Europe, Developing and implementing of ASM/ATFCM processes and supporting tools at national, sub-regional and European levels. Objective related to the new AOP21 Note: This objective contributes also to the implementation of the FUA Regulatory Requirements (Regulation 2150/2005).

ESSIP Plan 2013 / Objective AOM 194 What is new or has changed since LSSIP 2012 New FOC date: 12/2016 (instead of 12/2015) No changes to existing SLoAs 2 new SLoAs (applicable to the Network Manager) AOM19-NM01 - Develop System and procedures for an improved ASM/ATFCM process – finalisation date 12/2015 AOM19-NM02 - Upgrade NM systems to allow exchange in real-time of ASM information – finalisation date 12/2016

ESSIP Plan 2013 / Objective AOM 195 Link to European ATM Master Plan The objective AOM19 covers the following SESAR OI steps: OI step - [AOM-0201] - Moving Airspace Management Into Day of Operation OI step - [AOM-0202] - Enhanced Real-time Civil-Military Coordination of Airspace Utilisation OI step - [AOM-0205] - Modular Temporary Airspace Structures and Reserved Areas OI step - [AOM-0401] - Multiple Route Options & Airspace Organisation Scenarios OI step - [DCB-0203] - Enhanced ASM/ATFCM Coordinated Process

ESSIP Plan 2013 / Objective AOM 196 Most important SLoA(s) AOM19-ASP02 - Implement CIAM Phase 1 should have been already completed (finalisation date 12/2010). AOM19-ASP03 – Implement CIAM Phase 2 should have been already completed (finalisation date 12/2011). Each SLoA should be fulfilled in accordance with the relevant provisions of the CFMU Handbook, the ERNIP Part 3 - Handbook for Airspace Management, the EUROCONTROL Specification for the application of the FUA

ESSIP Plan 2013 / Objective AOM 197 Finalisation Criteria and Closed Questions Finalisation criteria: Contact your subject matter expert to determine the deployment Status for each SloA Statements to be made based on Finalisation criteria Closed questions: Not yet developed

ESSIP Plan 2013 / Objective AOM 198 ESSIP Report 2012 More than three quarters of the States have plans to implement this objective according to the agreed timeframe. The implementation progresses well in the States with high traffic demand/complexity and/or high level of military airspace users activity. Interest in implementation of this objective is slightly lower in the states with low traffic demand/complexity and/or low level of military airspace users activity, notably with regard the implementation by the military stakeholders. Stakeholders reporting NO PLAN or NOT APPLICABLE should duly justify this status.

ESSIP Plan 2013 / Objective AOM 199 Objective Coordinators Analysis, recommendations, tips & tricks Ensure that your subject matter expert is involved once you make your statement. Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material. Next SLoA with finish date due is: AOM19-ASP07 – Optimise CDRs design and availability by 12/2013

ESSIP Plan 2013 / Objective AOM 1910 Links and contacts Objective Coordinator: Octavian CIOARA NMD Objective Expert(s): Giuseppe ACAMPORA Olivier MROWICKI