Comments and Tradeoffs for NexSAT

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
EMS Aviation Keeping Your World Connected™
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Hosted by Type your name here Choice1Choice 2Choice 3Choice
By D. Fisher. 1. a. The Soccer team is raising $800 for equipment. It is 50% of the way to the goal. How much money has been raised? 0 % 100% 50% 25%
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
Study Group 8 Seminar on Tomorrows Technological Innovations Related to WRC-07 Session 3 : Working Party 8D Introduction Overview of Activities in Working.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Presented by Philippe Renaud
Reproduction interdite © Alcatel Espace Reproduction forbidden SDLS (Satellite Data Link System) SYSTEM PRESENTATION ICAO ACP Working Group C - Toulouse.
U.S. Plans for ADS-B Briefing for
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 Satellite AIRCOM Infrastructure Reinforcement.
ESA Iris Programme: status
Phillipe Renaud and Nikos Fistas
Welcome to the Steering Group for a Next Generation Satellite System (NGSS) Eurocontrol, Brussels 20 May 2003.
Alan Schuster Bruce, Thales Avionics, 31 May 2005
26 Nov 2002 NexSAT Steering Group meeting 1 SATELLITE DATA LINK SYSTEM (SDLS) AN AERONAUTICAL MOBILE SATELLITE COMMUNICATION SYSTEM CONCEPT RESPONDING.
Inmarsat Aeronautical System Status
Satellites –part of the solution for global Air Traffic Management An Airbus view Peter Potocki de Montalk – Director, Air Traffic Systems 3 March 2006.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
1 © TriaGnoSys GmbH - All rights reserved The Role of Satellites and Passenger Communications for Future Air Traffic Management Markus Werner TriaGnoSys.
Assessment of Aero-BGAN Study Status NexSAT Steering Group 31st May 2005.
20 May 03NexSAT Steering Group Meeting 1 SATELLITE DATA LINK SYSTEM (SDLS) TOWARDS A DEDICATED MOBILE SATELLITE COMMUNICATION SYSTEM FOR A/G SAFETY COMMUNICATIONS.
Presentation to Nexsat steering group - 20 / 05 / 03 Tous droits réservés © Alcatel Space All rights reserved SDLS Current Activities Presentation to NexSat.
Aerospace Division Anastasia Project Airborne Communication and Navigation Satellite Technologies And Techniques in a System Integrated Approach Presentation.
ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
1 BNSC 3 Programme Aviation use of Broadband Satcom Paul Ravenhill Helios Technology.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Next Generation SATCOM
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Instructions for Playing Jeopardy Click on the question that you want to attempt, example $100 Read the question and click on the slide to advance to.
Category 1 Category 2 Category 3 Category 4 Category.
1/2, 1/6, 1/6, 1/6 1)If you spin once, what is the probability of getting each dollar amount (fractions)? 2) If you spin twice, what is the probability.
Dont Forget... Contestants …Always phrase your answers in the form of a question!
Category Category Category Category Category.
Science Jeopardy >>>> Topic 1 Topic 2 Topic 4 Topic Topic 5.
Outcome and Theme Comprehension Strategies
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Welcome. No.1 Global air con producer Extremely Powerful : Haili : Glee : Gree.
ESLS 04 Daresbury Laboratory
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Category Category 2Category 3Category 4Category
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Propagation Requirements for Broadband Fixed Wireless Access Dr M.J. Willis Radio Communications Research Unit Rutherford Appleton Laboratory
Category Heading Category Heading Category Heading.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Elasticity and its Application
Blank Jeopardy. Category #1 Category #2 Category #3 Category #4 Category #
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Team 4Team 5 Team 6 Team 1Team 2Team 3 Round 2 Final Jeopardy Round 1.
Inmarsat Aeronautical Communications
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Aeronautical Ku-band Satellite Communication Single Focus Workshop 25 March 2010 Peter Lemme.
Inmarsat current & future services - maritime November 2011 Chris Denny Business Development.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
1 WG-MISD Release of Radioactive Material (RRM) Work Stream Colin Hord, UK CAA Nigel Gait UK Met Office.
Global Aviation Test Equipment Market WEBSITE Single User License: US$ 2500 No of Pages: 76 Corporate User License:
ESA Iris Programme: status
Alan Schuster Bruce, Thales Avionics, 31 May 2005
Next Generation SATCOM
Broadband Satcom for Aeronautical Communications
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
Polyimide Film Market Research Report - Forecast to 2023 Industry Survey, Growth, Competitive Landscape and Forecasts to 2023 PREPARED BY Market Research.
Presentation transcript:

Comments and Tradeoffs for NexSAT Prepared by Alan Schuster Bruce - Presented by Andy Lovett Eurocontrol NexSAT Steering Group Brussels, 20 May 2003 Thales Avionics

Thales Avionics Satcom Activities 20 May 2003 Teamed With Honeywell In 1990 to: Develop Arinc 741/Inmarsat/AMSS terminals For airlines, business jets and military Over 2500 systems produced. Manufactured over 500 antennas for business jets The leading aero satcom terminal provider in Europe Thales Avionics

Thales Assessment for Eurocontrol of NexSAT 20 May 2003 What are the key issues? What are the tradeoffs? Recommendations? Are there any show stoppers? Thales Avionics

Services, Coverage Area and Channel Types 20 May 2003 Services Thales believe these should be: simultaneous 1 voice & 1 data but needs confirming based on operational requirements Investigate 2400 bps voice codecs Determine data rate/confirm 1000 bps is acceptable Coverage area Spot beam services should be included to allow simpler terminal - especially for smaller aircraft RF Channel types - Thales recommend Those available on existing Inmarsat equipped aircraft A type based on global beam A type based on spot beams Thales Avionics

Link Budgets Comprehensive link budgets must be produced 20 May 2003 Comprehensive link budgets must be produced The heart of any satellite system design Thales Avionics

Channel type 20 May 2003 Need to be optimised since link budget is always ‘under pressure’. Thales suggest: Use turbocoding to improve link budget User rate Coding Total Voice 2400 3/4 3200 Data 1000 1/2 2000 Control (est) 200 400 5600 RF Channel SR for QPSK 2800 Thales Avionics

HPA Issues 20 May 2003 HPA efficiency (inclusive of PSU and controller) will rise from 30% to 40% Aviation industry does not like uncooled boxes due to installation and reliability issues 100W electrical power is limit of uncooled technology which provides 40W RF power and 60W heat dissipation from But would not be popular and a hence a barrier to uptake. Only suitable on certain aircraft installations Thales Avionics

Key recommendations No showstoppers but: 20 May 2003 No showstoppers but: Define services and their coverage (spot/global beams) - clarify need for simultaneous voice and data Provide 2 or 3 services each with an associated channel type (global/spot/existing Inmarsat a/c) Produce comprehensive link budgets and define channel types Lower rate vocoders (2400bps) should be investigated HPA should be cooled for most aircraft Use a low gain antenna to keep cost low and fit on small a/c Thales Avionics

Thank you for your attention Question / Answer Comments and questions to: Alan.Schuster-Bruce@uk.thalesgroup.com +44 20 971 5407 Thank you for your attention Question / Answer Thales Avionics