© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

Slides:



Advertisements
Similar presentations
TCM - Tactical Capacity Management Maastricht UAC European Organisation for the Safety of Air Navigation.
Advertisements

Presentation to the ICAO IVATF Montréal, 27 th – 30 th July 2010 EUROCONTROL/CFMU VOLCANIC ASH CRISIS REPORT European Organisation for the Safety of Air.
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
David Gamper, Director, Safety and Technical Affairs ACI World PRE-CONFERENCE WORKSHOP for the ICAO AIR NAVIGATION CONFERENCE ICAO HEADQUARTERS MONTREAL.
IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSVÖTN European Organisation for the Safety of Air Navigation Žarko SIVČEV EUROCONTROL.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
GENSPACE Air Traffic Management
DPI Messages Short Overview for AOs and Ground Handlers
FLIGHT ACTIVATION MONITORING (FAM)
© EUROCONTROL 2012 – Network Management Operations Centre (NMOC/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Hans Koolen EDITION 12/11/2012 WHY.
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
Draft Concept of Operations (CONOPS) for CS#1- FAS Centralised service on Flight Plan and Airport Slot Consistency (FAS) Matthis Birenheide Project Manager.
FLIGHT ACTIVATION MONITORING (FAM)
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
© EUROCONTROL 2013 – Network Manager Operations Centre (NMOC/CFMU) BENEFITS OF FLIGHT ACTIVATION MONITORING Hans Koolen EDITION 16/01/2013.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A Slot Swapping Applications for CDM P.R. de Waal, NLR M.H. van den.
BRUSSELS AIRPORT CDM PROJECT
ATFM Priorities Evaluation Study Alison Hudgell QinetiQ
European ATFM From current operation towards the future Patrick Ky
Hans Koolen NMOC/CFMU Network Operations Services
LSSIP Objective AOP01.2.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
Introduction Cooperative Traffic Management (CTM) NM USER FORUM 2014
08/06/04, Bruxelles Michel Namy LEONARDO ADP CDGT IA Vision for operational implementation An airport perspective.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
- European CDM - Collaborative Departures Sequencing Optimising departure sequence according to the priorities of Airline and Airport as well as Tower.
Volcanic Ash Crisis 2010 Seminar Belgrade, 7 th September 2010 European Organisation for the Safety of Air Navigation Brian FLYNN EUROCONTROL/CFMU Network.
Network Manager User Forum 2014 A-CDM Challenges & Perspectives Lessons learnt at Paris-CDG 29th January 2014.
Mission Trajectory Step 1 From planning to deployment.
Nicky Cooper Head Network Operations Management
Ensuring a 'Flexible Use of Airspace'….
NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.
ATM Modernisation & Network Manager Frank Brenner, Director General EUROCONTROL Airbus ProSky Symposium April 8 th – 10 th, 2014, Abu Dhabi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
DPI Messages Short Overview for AOs and Ground Handlers
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Why Flight Plan and ATFCM adherence?
Brussels December 5,20021 New Technologies and Airport Management Presented by Cesare Bernabei Università di Piacenza & Politecnico di Milano January.
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
Regional ATFM in Europe
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
Can our ATM systems cope?
NM USER FORUM 2014 Brian Flynn Head Performance, Forecasts and Relations 30/01/2014 N etwork Performance: addressing more challenging targets.
CANSO Role in ATFM/CDM in APAC
Distributed Multi-Nodal ATFM Operational Trial
ICAO-IATA Cross-Border ATFM Workshop
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
The European Organisation for the Safety of Air Navigation Brian Flynn Directorate of Network Management Head Network Operations unit EUROCONTROL What.
The European Organisation for the Safety of Air Navigation Objective AOP05.
© EUROCONTROL 2016 – Network Manager Operations Centre (NMOC) Integration of Airport and the Network Benefits Hans Koolen NMOC Network Operations Services.
CEATS Central European Air Traffic Services
Collaborative Decision Making Module 8 “Collaborative Leadership”
The Role of Air Traffic Control in A CDM ENVIRONMENT
Workshop on preparations for ANConf/12 − ASBU methodology
Airport-ANSP Growth & Efficiency ACDM-CATFM
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Nikola Ivanov, Fedja Netjasov, Radosav Jovanovic
Documentation (1/4) Airport CDM Manual
CANSO Role in ATFM/CDM in APAC
Documentation (1/4) Airport CDM Manual
Presentation transcript:

© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network Operations Services Edition January 2013

2 © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Improved TOT Prediction – normal operations 60min before take-off TOT accuracy=9.7 TOT accuracy=8.4 Improvement: 13% Improvement: 23% 30min before take-off TOT accuracy 4min

3 © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Improved TOT Prediction – adverse conditions 90 min before take-off TOT accuracy=33.3 TOT accuracy=23.6 Improvement: 29% Improvement: 54% 30min before take-off TOT accuracy 5min EGLL 10/07/2012

4 © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Improved TOT predictions lead to: For the network/NMOC: Improved traffic count predictions Better use of available capacity Improved adjustment of CTOT to requested TOT For AOs: Better suitable CTOT Improved Estimated Landing Time prediction For Airports: More accurate estimated landing times for inbound flights For ANSPs: More accurate traffic count predictions via NMOC data distribution services ©2011 The European Organisation for the Safety of Air Navigation (EUROCONTROL)

5 © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Variable taxi-times ©2011 The European Organisation for the Safety of Air Navigation (EUROCONTROL) The accurate taxi-time per flight

6 © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Other Benefits of A-CDM… For the Network: Better use of available capacity Improved adherence to ATFM Slots For AOs: Better adjustment of CTOT to local constraints Improved visibility of flights at the outstation Assistance to updating flight plans Enabler for improved flight and fleet planning Reduced risk of suspension by Flight Activation Monitoring Allow to delay and advance the TOBT No more DLA required if flight is delayed by ATC (ground) CTOT freezing from Actual Off-block onwards Improved management of adverse conditions ©2011 The European Organisation for the Safety of Air Navigation (EUROCONTROL)