Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Mission Trajectory Step 1 From planning to deployment.
ATM Modernisation & Network Manager Frank Brenner, Director General EUROCONTROL Airbus ProSky Symposium April 8 th – 10 th, 2014, Abu Dhabi.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Stakeholder Consultation Workshop on the draft implementing rule for Air-Ground Voice Channel Spacing II (below FL 195) 6th May 2011, Brussels, EUROCONTROL.
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR

ESSIP Plan 2013 / Objective ITY-AGVCS2L2 Objective ITY-AGVCS2 Explanation What is new or has changed since previous ESSIP edition Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2012 Objective Coordinators Analysis, recommendations, tips & tricks Conclusions Links and contacts

ESSIP Plan 2013 / Objective ITY-AGVCS23 Explanation The objective is based in Regulation (EU) No 1079/2012 and mandates: the conversion of all* 25 kHz frequency assignments to 8,33 kHz by 12/2018 all* radios and voice communication systems need to be 8,33 kHz- capable by 12/2017 * There are multiple exemptions and derogations and specific requirements for State aircraft (see field Derogations for each SLoA) The objective complements previous ITY-AGVCS which covered the requirements above FL195, this objective extends the mandate down to the ground. It has an interim target for frequency conversions for AT, DE, FR, IE, IT, LU, HU, NL and UK to be achieved by 12/2014 (see REG02 & ASP02) Applicable to EU+ States

ESSIP Plan 2013 / Objective ITY-AGVCS24 What is new or has changed since previous ESSIP edition N/A (New objective)

ESSIP Plan 2013 / Objective ITY-AGVCS25 Link to European ATM Master Plan [CTE-C5]- 8,33 kHz Voice communications Air-Ground: VHF 8.33 kHz is mandated in all continental airspace to support increases in traffic.

ESSIP Plan 2013 / Objective ITY-AGVCS26 Most important SLoA(s) N/A (all)

ESSIP Plan 2013 / Objective ITY-AGVCS27 Finalisation Criteria and Closed Questions N/A (See objective description) No additional closed questions other than the established finalisation criteria

ESSIP Plan 2013 / Objective ITY-AGVCS28 Supporting Material As specified in SLoAs detailed descriptions

ESSIP Plan 2013 / Objective ITY-AGVCS29 ESSIP Report 2012 N/A (new objective)

ESSIP Plan 2013 / Objective ITY-AGVCS210 Objective Coordinators Analysis, recommendations, tips & tricks Read carefully the SLoAs definitions and derogations Note that there are many instances where notifications to the European Commission are required Note that REG02/ASP02 apply only AT, DE, FR, IE, IT, LU, HU, NL and UK

ESSIP Plan 2013 / Objective ITY-AGVCS211 Conclusions N/A

ESSIP Plan 2013 / Objective ITY-AGVCS212 Conclusions Objective Coordinator: Oscar ALFARO; Octavian CIOARA;