Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
THE CERTIFYING AUTHORITY
Overview of the interoperability Regulation
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
SAFETY REGULATION COMMISSION SAFETY REGULATION COMMISSION Harmonisation of ATM Safety Regulation & ESARRs SAFETY REGULATION COMMISSION SAFETY REGULATION.
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision CERTIFICATION PROCESS  Peter Stastny,
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision SAFETY ASPECTS SAFETY ASPECTS  Juan Vázquez,
Juan Vázquez Sanz EUROCONTROL SRU
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR

ESSIP Plan 2013 / Objective SRC-CHNG2 Comprehensive Explanation Scope/Applicability: Applicable to civil & military REG, incl. NSAs only REG/ MIL SLoAs Encompasses ANS plus the related ATFM and ASM functions (full ATM/ANS) Applicable Areas: 4 States: AM, AZ, TR, UA

ESSIP Plan 2013 / Objective SRC-CHNG3 Comprehensive Explanation 1.REG01: Ensure notification by ATM organisations of planned safety related changes (LAs & Comments must explain if a documented process and formal arrangements are in place, and if there are records of notifications at the NSA) 2.REG02: Establish a process for the review of safety arguments, in accordance with articles 9 & 10 of EU 1034/2011 (LAs & Comments must address: if a documented process is in place, appropriate NSA level; conformity with Article 10(1) of SO-IR; or ESARR 1 edition 2.0; if adequately trained NSA personnel conducting the reviews & supporting guidance are in place; if reviews assess the acceptability of the safety arguments; and if the introduction into operational use of a change subject to such review is conditioned by an acceptance by the NSA (article 10(3) SO-IR).) 3.REG03: NSA to implement the process (LAs to address: evidence/ records of safety reviews by the NSA of the safety arguments submitted by the ATM organisations and evidence of actions taken; notifications of acceptance by the NSA of introduction of a change into operational use subject to the safety review.)

ESSIP Plan 2013 / Objective SRC-CHNG4 What is new or has changed since LSSIP 2012 Minor changes in ESSIP Plan Edition 2013 (only modification of the numbers of Regulations applicable) No link with European ATM Master Plan

ESSIP Plan 2013 / Objective SRC-CHNG5 Supporting Material The most important: Commission Implementing Regulation (EU) 1034/2011 on Safety Oversight ESARR 1, Edition 2.0 EAM 1 / GUI 1 Explanatory Material on ESARR 1 Requirements

ESSIP Plan 2013 / Objective SRC-CHNG6 ESSIP Report 2012 Two out of four States reported Objective SRC-CHNG as Completed. Further 2 have reported delays in implementation due to lack of appropriate resources. Since last years report there has been no progress in the implementation of this Objective.

ESSIP Plan 2013 / Objective SRC-CHNG7 Objective Coordinators Analysis, recommendations, tips & tricks Processes or arrangements reported as Completed before Nov 2007 (EU) or Dec 2009 (non-EU) may hide non-compliance with current regulatory requirements. Request that REG/NSA specifies the legal references to the national implementing rules and other acts documenting their local arrangements for the safety oversight of changes (NSA procedures, manuals, guidelines to the safety auditors etc).

ESSIP Plan 2013 / Objective SRC-CHNG8 Links and contacts Objective Coordinator: Dybowska A., DSS Objective Expert(s): Deboeck, M.,