1 CARE/ASAS Achievements and future activities Francis Casaux CARE/ASAS manager on behalf of EUROCONTROL.

Slides:



Advertisements
Similar presentations
TBT Special Meeting On Procedures For Information Exchange, 2-3rd November MALAYSIAS EXPERIENCE IN IMPLEMENTING CODE OF GOOD PRACTICE FOR THE PREPARATION,
Advertisements

ENQA’S CONSULTATIVE MEMBERSHIP IN THE BFUG - WHAT DOES IT ENTAIL
INTERREG III C: Past experiences and future expectations on Interregional Co-operation Brussels, Thomas Wobben Verbindungsbüro des Landes Sachsen-Anhalt.
Implications for the Regions EU-Regional Policy 1 Governance White Paper Introduction Adoption of White Paper on European Governance, July 25, 2001 Aim:
What is valorisation ? Growth €
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
1 CARE Innovative Actions Mick Van Gool CARE Manager, EUROCONTROL SD/ESC.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
TIM 8 and Action Plan 6 Colin Meckiff, Experimental Center Tom Proeschel, FAA Hdqtrs 30 October 2001.
COAT -TRIBUNALS' MODEL PRACTICE GUIDE - AIJA COAT TRIBUNALS MODEL PRACTICE MANUAL Livingston Armytage Centre for Judicial Studies
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Page 1 ASAS Thematic Network Second Workshop “Safety and ASAS Applications” Progress and contents Safety and ASAS Applications Progress and Contents Ken.
ASAS TN 2nd Workshop 6-8 October ADS-B Safety Analysis (ASA & GSA) Bob Darby EUROCONTROL ADS Programme ASAS Thematic Network Second Workshop 6-8.
MAMA - Network Project WP 7. MAMA-AWARE Coordinated by UNEP/MAP (MB 11) – MED POL Unit.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
What Is the Council’s Role in Program Implementation? County Extension Council Training Module Missouri Council Leadership Development — a partnership.
Korkeakoulujen arviointineuvosto — Rådet för utvärdering av högskolorna — The Finnish Higher Education Evaluation Council (FINHEEC) eLearning and Virtual.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
RIS LAUNCH CONFERENCE Ljublijana, June 6, 2005 Gains of the RIS West Romania Process throughout the IRE Secretariat Support Raluca CIBU-BUZAC Head of International.
SESAR Single European Sky Air traffic management Research
1 International/OECD Nanotechnology Activities EPA/DoD Meeting on Nanotechnology March 9, 2007 Jim Willis, EPA/OPPT.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
1 18 March 2010AGNA meeting EASAC update Yves Morier.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Action Plan and the Two-year NRN Operational Plans.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
European Organisation for the Safety of Air Navigation RFG ASPA-S&M Requirements Determination ASAS-TN th September Malmo, Sweden.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT ASAS-TN2 3rd Workshop – Glasgow 11 September 2006 ASAS-TN2 Third workshop Address by the Commission.
WP6 – Inter-operability with e-Infrastructures Sergio Andreozzi - WP6 Task Leader Strategy and Policy Manager, EGI.eu Helix Nebula - 1st Year Review 1.
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
ASSTAR Overview Jean-Marc Loscos, DSNA
Chris Shaw, EUROCONTROL Experimental Centre
Chris Shaw, EUROCONTROL Experimental Centre
ASSTAR Project Overview & User Forum Objectives
Marine Strategy Framework Directive (MSFD)
AP23 Introduction ASAS-TN2.5 workshop 13 Nov 08, Rome
Purpose and Structure of the Workshop
Marine Strategy Framework Directive (MSFD)
Directorate-General Energy and Transport
Presentation transcript:

1 CARE/ASAS Achievements and future activities Francis Casaux CARE/ASAS manager on behalf of EUROCONTROL

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November References CARE/ASAS Action Plan document –Version 5.0 – 6 November 2004 CARE website –

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November CARE/ASAS Initial Objectives Promote co-operative work on ASAS within Europe Establish a common view on ASAS applications Support the validation of the strategic line of action related to transfer of separation responsibility to the cockpit identified in the ATM Strategy for Make the best use of the wide range of competencies which are required to address all the issues Avoid the duplication of R&D efforts

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November CARE/ASAS Management –CARE manager : Mick van Gool (EUROCONTROL SD/ESC) –CARE/ASAS manager : Francis Casaux (CENA) CARE/ASAS Management Board –composed of ASAS experts (EUROCONTROL HQ, EEC, ATS providers, R&D centres, Universities) –who advise the CARE/ASAS manager, initiate the work, follow the progress, evaluate the results –Observers : European Commission, IATA, Airbus, JAA –Coordination with EATM programmes and domains Eighteen meetings from October 1999 to November 2004

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November CARE/ASAS Management CARE/ASAS Action Plan (CA/99-001) –Activities: Description and status –Relationship with EATM programmes/domains –Relationship with EC and EC funded projects –Relationship with Action Plan 1 (and 18) of the FAA/EUROCONTROL R&D Committee Reference Document List (CA/00-010) –66 deliverables available through the CARE website lists (CA/01-026) –CARE/ASAS Management Board –CARE/ASAS Interest Group

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November CARE/ASAS Management Three levels of cooperation –Level 1 - Exchange : Organisations exchanged information on R&D work. There was no CARE/ASAS funding. –Level 2 - Cooperation : The objective was a more efficient use of the existing resources within each organisation. Calls for Interest were issued to define the work. There was no CARE/ASAS funding. –Level 3 - Collaboration : Organisations were working together on the same R&D project. A common funding was necessary. The work to be performed was defined and agreed at the CARE/ASAS Management Board level. Calls for Tender were issued. Four projects were conducted.

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 0 - Communications CARE Website: –Regularly updated –Vehicle for the four CARE/ASAS calls for tender Communication activities –Reporting within EUROCONTROL (e.g. R&D Review Group, ODIAC, etc.) and outside (e.g. SCRSP) –CARE/ASAS CD-Rom –Dissemination of CARE/ASAS deliverables –Dissemination of information related to ASAS (e.g. ATM R&D seminar, ANConf/11) Technical Interchange Meeting on ASAS (coordinated with AP1) –November NASA/Ames –November Brétigny –October NASA/Ames Activities continued through the ASAS Thematic Network

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 0 - Communications ASAS Thematic Network: ASAS-TN ( ) –Involving the industry (i.e. aircraft, avionics & ATM) and pilot/controller professional associations –ASAS-TN events: 1st workshop - Rome - April ASAS Operational improvements – Dream or Reality? 2nd workshop - Malmö - October ASAS what does it mean operationally? 3rd workshop - Toulouse - April ASAS Making it happen (Airborne and Ground Functions for ASAS Implementation) Seminar - Brighton - October ASAS Time for Decisions - The Way Forward –ASAS-TN website : ASAS-TN2 on ASAS and ADS-B applications ( )

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 1 - Problem Dimensions Initial objectives –Review of the existing work on ASAS –Analysis of the degree of validation achieved so far –Identification of areas needing further work Cooperative work –Call for tender issued in February 2000 –Consortium of nine organisations lead by NLR –Report (CA/00-012) delivered in November 2000 and disseminated in April 2001 via mail and internet –Main results presented at the ASAS TIM in November 2000 In stand-by since April 2001 –The yearly Tableaux de Bord from ASAS-TN2 should provide similar information on an annual basis

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 2 - Validation Framework Initial objectives –Comparison of studys results –Development of an approved validation framework (scenarios, metrics and tools) EEC was leading this activity –Several meetings and teleconference were held Cooperative work –EEC, CENA, Glasgow University –A report (CA/01-020) Towards a validation Framework for ASAS applications was delivered in June 2001

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 2 - Validation Framework Collaborative work –Call for tender issued in July 2001 –VF project - Consortium of five organisations lead by NATS –Several technical deliverables (e.g. scenarios, system and human performance metrics, validation framework) –Dissemination forum in October 2002 at EEC –Final report (CA/02-036) delivered in November 2002 and disseminated in March 2003 via internet In stand-by since May 2003 –ASAS applications are similar to any ATM applications –Validation work is conducted at project level (e.g. NUPII) –Validation Plan Drafting Group was set up by the EUROCONTROL ADS programme

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 3 - Safety Initial objectives: –Phase 1 - Influencing parameters for airborne separation minima and first attempt of quantification NLR was leading this activity –Several meetings and teleconference were held Cooperative work –Glasgow University, CENA, NLR –A report (CA/01-019) Investigation of Experience in Modelling and Determining Separation Minima was delivered in June 2001

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 3 - Safety Collaborative work –Call for tender issued in August 2000 –ASM (Airborne Separation Minima) project - Consortium of five organisations lead by Sofréavia –Several technical deliverables (e.g. OSEDs and OHAs for two ASAS applications, Estimation of safe separation criteria) –Dissemination forum in December 2001 at EEC –Final report (CA/01-018) delivered in April 2002 –The ASM project extension study delivered its report (CA/ ) Lessons learnt from the OSED/OHA activities and hazard brainstorm in September 2002 –All results disseminated in March 2003 via Internet

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 3 - Safety In stand-by since May 2003 –Work done within AP1 on Safety and ASAS applications –The EUROCONTROL ACAS programme launched the IAPA (Implication on ACAS Performances due to ASAS implementation) project –The EUROCONTROL ADS programme launched: The ASFA (Airborne Surveillance Functional Architecture) project A safety analysis project on six Package I applications A project on the definition of separation minima using ADS-B –The MFF (Mediterranean Free Flight) project released some safety work and a safety workshop was planned

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 4 - ASAS Application Definition Initial objectives –Support the definition of ASAS applications –Started in October 2001 Cooperative work –Document on terminology (CA/02-039) Applications and Services delivered on February 2002 –CENA developed the document (CA/02-037) Review of ASAS applications studied in Europe which was delivered on February 2002 –Support to the OSED Drafting Group created by the EUROCONTROL ADS programme (2003) –Support to the RFG (Requirement Focus Group) activities ( ) European co-chair for RFG/2, RFG/3 and RFG/4 Working papers related to ANConf/11 (CA/04-064) and ICAO standards (CA/04-065)

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 4 - ASAS Application Definition Collaborative work –Call for tender issued in April 2003 –FALBALA project - Consortium of five organisations (including three ANSPs) supported by three airlines and lead by Sofréavia –Several technical deliverables (e.g. TMA traffic analysis, airborne perspective analysis, operational workshop and operational benefits) –Dissemination forum in July 2004 in Haren –Final report (CA/04-061) delivered in July 2004 –All results disseminated in September 2004 via Internet –FALBALA extension study proposed to the EUROCONTROL CASCADE programme

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November Activity 5 - ASAS Application Implementation Initial objectives –Support the implementation of ASAS applications –Started in September 2001 Cooperative work –Participation to the IATA/NLR initiative called Free Flight Working Group – Operational –Participation to EUROCAE/WG51 and RTCA/SC186 –Elaboration of a consensus and development of the document (CA/02-040) Description of a first package of GS/AS applications endorsed by JCB (Joint Coordination Board) in September 2002 –Elaboration of a consensus and development of the document (CA/02-042) Proposal for working arrangements to develop Package I applications delivered to JCB in July 2003

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November FAA/EUROCONTROL Action Plans related to ASAS R&D co-operation between the USA and Europe –FAA, MITRE, NASA –EUROCONTROL, R&D centres, ANSPs Action Plan 1 was dedicated to ASAS applications since 1999 AP1 Deliverables –Technical Interchange Meetings –Document Principles for the Use of ASAS applications (PO-ASAS) delivered in June 2001 –Document Safety and ASAS applications (SAF-ASAS) delivered in March 2004 AP1 successfully terminated in March 2004

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November FAA/EUROCONTROL Action Plans related to ASAS AP18 terms of reference (ToRs) –Result of the merge of AP1 on ASAS and AP10 on ADS-B –Planned deliverables: Development of a document ASAS Concept of Use (CoU-ASAS) Support to RFG activities –Signature of ToRs started in June 2004 Future organisation? –AP18 focused on one or two Package I applications –AP22 focused on ASAS R&D activities

Eighteenth CARE/ASAS Management Board meeting – Haren - 26 November CARE/ASAS Achievements Creation of a community from R&D to industry with a communication tool: the ASAS Thematic Network Significant work on the definition, the validation, the safe design and the safety assessment of ASAS applications European contribution to the PO-ASAS and the SAF-ASAS documents Elaboration of an international consensus on Package I