Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Infrastructure.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

1 Welcome Summary - First visit Delhi Integra A/S Independent consultancy company Headquarter located in Copenhagen, Denmark Working worldwide.
1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
1 Welcome Safety Regulatory Function Handbook April 2006.
Opening up public data resources - PSI re-use within the open data strategy Luis Ferrão European Commission EVPSI and LAPSI Final Meeting Torino, 9 and.
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
PEPPOL is owned by OpenPEPPOL AISBL OpenPEPPOL – Making Procurement Better André Hoddevik Head of e-procurement unit, Agency for Public Management.
How to improve the technical and financial management of the TEN-T projects? Ioannis Giogkarakis-Argyropoulos, Head of Unit T2 – Road and Rail Transport,
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
ADQ – An ANSP/AISP Perspective
ADQ Implementation workshop Eurocontrol May 2013 Erika Billen.
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
ADQ Implementation Workshop Austro Control – Status and Issues
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Introduction Brussels, February 2013 Presented by: Manfred Unterreiner.
CAA UK Preparation Activities for the ADQ IR
ADQ IMPLEMENTATION WORKSHOP Summary, Conclusions
EASA ATM/ANS Standardisation “State Inspection”
IMPLEMENTING DQR A Practical View 19 February 2013 Danijela Maksimovic CAD Republic of Serbia.
ADQ Implementation Support Cell
The European Organisation for the Safety of Air Navigation Implementing DQR - A Practical View DAL/DQR Workshop Brussels, February 2013 Presented.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
National Public Health Performance Standards Program Orientation to the Essential Public Health Services.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
How to commence the IT Modernization Process?
Supporting National e-Health Roadmaps WHO-ITU-WB joint effort WSIS C7 e-Health Facilitation Meeting 13 th May 2010 Hani Eskandar ICT Applications, ITU.
Enhancing ICT development and connectivity in Africa Erik Habers Head of Cooperation EU Delegation Nairobi.
United Nations Economic Commission for Europe Transport Division United Nations Economic Commission for Europe Transport Division ITU - Inland Transport.
Responsible Resource Development April 17, Context Government focussed on responsible development of Canada’s natural resources to create jobs and.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Health Records Management Practitioner
Modular Urban Transport Safety and Security Analysis 1 SiT - Safety in Transportation 2012.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
1 Certification Chapter 14, Storey. 2 Topics  What is certification?  Various forms of certification  The process of system certification (the planning.
ISO Energy Management System Certification
International Civil Aviation Organization Features and Evolution of Regional Safety Oversight Organisations (RSOO) Comparative Analysis Mikołaj Ratajczyk.
5th INTERNATIONAL CONFERENCE Nicosia May 2014 Safety performance measurement in Air Navigation Services.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Technical Regulations – U.S. Procedures and Practices U.S.-Brazil Commercial Dialogue Digital Video Conference Series August 22, 2006 Mary Saunders Chief,
Electricity Infrastructure Workshop Brussels, 13 February 2007 The framework for a Single European Electricity Market Mrs Asta Sihvonen-Punkka, CEER EWG.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Suggestions for Speedy & Inexpensive Justice Presentation to the Committee of the Whole The Senate of Pakistan 19 August 2015.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
1 Harmonisation within a merger of two spot power exchanges - Experiences by EEX and Powernext APEX CONFERENCE 2008 IN SYDNEY | 13 October 2008 Dr. Wolfgang.
MODEL POLICY FRAMEWORK FOR E-WASTE MANAGEMENT IN THE EAST AFRICAN REGION Nakiguli Helen Cynthia, Uganda Communications Commission,
16-17 November 2005 COSCAP – NA Project Steering Group Guangzhou, China 1 Co-operating with the European Aviation safety Agency.
1 This project is co-financed by the European Union STATUS OF RENEWABLE ENERGY IN THE MEDITERRANEAN AND CURRENT CHALLENGES; MedReg Perspective By Prof.
European Aviation Safety Agency Head of Aircraft Product Certification
Kathy Corbiere Service Delivery and Performance Commission
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
PSI Scorecard Chris Corbin ePSIplus Analyst Prague, 31 October 2006 funded by eContentPlus.
Ensuring the Safety of Future Developments
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
19-20 October 2010 IT Directors’ Group meeting 1 Item 6 of the agenda ISA programme Pascal JACQUES Unit B2 - Methodology/Research Local Informatics Security.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
European (Sector) Social Dialogue overview & update
Ensuring the Safety of Future Developments
Co-operating with the European Aviation safety Agency
TOGETHER WE CAN MAKE A DIFFERENCE
PROGRESS & CHALLENGES ATCOS’ VIEWS
Circular Economy -Public Consultation – Results
Priority geospatial datasets for the European Commission
Road Infrastructure for Road Vehicles Automation
Incentives for electricity infrastructure – ERGEG view
Market surveillance cooperation at European level
Presentation transcript:

Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Infrastructure ADQ – Implementation Switzerland EC Regulation 73/2010 Markus Luginbühl – FOCA Section Policy & Rulemaking ANS

2 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Subjects 1. Implementation Switzerland – Status 2. Challenges and open issues a. Legal Issues – national high level law changes required b. Implementation Timeline c. Open issue with European Commission d. Cross border Data-processes e. Cost – Cost allocation – Cost recovery f. Data lifecycle management, Evidences for the required Traceability g. ADQ Oversight h. Technical systems and tools 3. National Transition Process - Enablers

3 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Implementation Switzerland - Status Getting High level attention on the issues Ressources Attention for needed legal changes Getting Regulator/NSA and Parties in Charge Ressources Attention for needed changes START Impl. Alignement Impl. on Timeline National International Analyses; Implementation Doc; Implementation Roadmap

4 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Implementation Switzerland - Status Required high level aviation law changes are in progress The establishment of the implementation documents are in progress Regulator together with ANSP, Airports and Military Engagement of Airports is demanding A number of open questions e.g.: Cost recovery Issues and missing legal baseline do not support efficient implementation Quick fix to meet timeline vs. Lasting solution. Airport Briefings on ADQ have started – to engage them in the process Engagement of Surveyors overhead organisations is in place legal changes in their domain as well as guidance material for them is being established. Origination Services Discussions are ongoing Implementation is late regarding timeline July 2013! We expect a delay of about 18 month. Status

5 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Challenges and open issues Needs for national legal changes Institutional aspects Cost allocation to aviation-outsiders is very difficult Cost-recovery model Requirements towards Originators or Parties outside of the aviation system Interface issues (e.g. direct electronic connection, data format, etc.) Liability Questions Change Process is ongoing Started early 2011 Will in best case be enforced beginning 2016 Implementation without legal baseline in place Missing legal baseline is hindering efficient implementation Legal Situation Planned enforcement of high level Law:

6 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Challenges and open issues Missing clear answer (ref. SSC 46 and SSC 47) from the commission regarding the delay-request of several states Switzerland will inform the commission on the Implementation delay and handing in our implementation roadmap and plan Implementation monitoring process across Europe is still missing it would show a very clear picture towards the commission Cross border Data-processes There are huge difficulties to be resolved on Cross border Data issues e.G.: Processes regarding cross border Airspace Structure or processes for Obstacles – which do heavily depend on national legal framework. Data origination and State responsibilities vs. Originator responsibilities Open issue with the commission; Cross Border Issues

7 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Challenges and open issues SES Performance Scheme requirements vs. huge aviation system enhancement-Cost European Performance Targets require great cost saving on ANSP Side – this is contradictory with the increasing demands on changes ADQ neither guidance material does not include any Cost allocation models, neither does eTOD Expectation that States would come up for the Cost or would allocate them to aviation outsiders (e.G.: private non- aviation obstacle owners) is not really realistic. Cost allocation and recovery models are to be established European-wide harmonized! The commission is urged to establish cost allocation and cost recovery models for all regulatory changes making sure, that the aviation sector can afford what is being planned and Performance target setting and comparison must be based on aligned cost allocation and recovery models! Otherwise it is non sense. Cost – Cost allocation – Cost recovery

8 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Challenges and open issues The Requirements as well as the available guidance material leave this issue wide open How is it to be done – what does fulfil the ADQ Requirement really What are the responsibilities How far goes the task of an ANSP regarding traceability? Data could last unchanged for very long time periods what does this mean for the Data lifecycle management and traceability? Only to assure readability over long time periods can be very demanding and costly. Guidance material to establish a harmonised approach across Europe would be very much appreciated! Data lifecycle management

9 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Challenges and open issues Switzerland does believe, that some sort of Data-origination services are needed To ensure digital processes without interference To enable smaller and smallest or even private originators to conform with ADQ Requirements For Data Quality assurance For efficient (incl. cost efficient) Aeronautical Information Management Processes and to not increase the since years growing Publication lead times Cost and cost recovery Responsibilities – ANSP? Technical solution is not available really Data Origination

10 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Challenges and open issues Oversight of Airports Established oversight processes towards airports are being expanded on ADQ Oversight for Airports Oversight of ANSP Established oversight processes (SES Requirements) towards ANSP will suit for ADQ oversight However some adjustments in existing processes are needed PANS OPS and AS Designers are today part of the monopoly ANSP and are therefore in the oversight process on ANSP included Oversight of Surveyors Switzerland will establish an acceptance process for surveyors and publish approved surveyors transparent an clear requirements for surveyors to reach such approval will be published. Re-approval will be required after defined time-period Oversight

11 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, Challenges and open issues How can we reach compliance regarding technical Systems and tools Surveyors or PANS OPS Tools and Software Data Origination or transfer tools of other parties We look for a Process involving the national geodetic institute and the Government Body of the Surveyors to get a generic process of acceptance or a list of accepted tools and software on existing and today used tools and software in place. This issue is not yet solved and finalised - Guidance on this issue would much appreciated! Requirements for technical systems and tools

12 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, National Transition Process The transition process is a very demanding and challenging issue Engage high level management amongst involved Regulators must engage – it will not happen otherwise National Policy and Legal baseline is very important Raise as early as possible appropriate awareness and get things moving Missing or little know how build up know how, networking Establish a harmonized understanding and approach amongst involved Get Originators to align their processes appropriate and in time Cost: Implementation cost to get all data ADQ Compliant and cost for the technical system changes or evolutions are high solve the processes e.G.: Obstacles Area 1 – huge effort is needed – cost allocation to private non aviation organisations or individuals Get Surveyors ready and aligned (they are non aviation organisations and there is no big market) there could be legal changes required?! Enablers

13 ADQ WS BRU Markus Luginbühl, ANS/AIM Policy & Rulemaking, End Questions / Remarks