ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

1 Reporting April Safety Policy Regulator Service Provider Service Provider Service Provider Regulator to established SRF to harmonize reporting.
1 Welcome Safety Regulatory Function Handbook April 2006.
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Eurocontrol HQ, Brussels September 13-14, 2011 Belgian Civil Aviation Auhtority General Directorate Aviation Belgian approach related to unmanned aircraft.
The European Organisation for the Safety of Air Navigation UAS Security Antonio Nogueras Head DSS/CM/ATM Security Unit EU UAS Panel Workshop, th.
Unmanned Aircraft Systems EUROCONTROL ATM Integration
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
Second Global Symposium on TEM and NOSS in Air Traffic Control February 7, 2007 NOSS and the ATS Provider A Perspective from Senior Management Kathy Fox.
ICAO AVIATION SAFETY PROGRAMMES
Future Communications Infrastructure – An update
Overview of the interoperability Regulation
Flexible Airborne Architecture
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
ESA Iris Programme: status
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
System of Systems (DRAFT) To be approved by the ICAO Council
Joint FAA/Eurocontrol Future Communications Study (FCS)
The Single European Sky ATM Research (SESAR) initiative
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
Phillipe Renaud and Nikos Fistas
1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Communication Domain Future Aeronautical Communications
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
1 © TriaGnoSys GmbH - All rights reserved The Role of Satellites and Passenger Communications for Future Air Traffic Management Markus Werner TriaGnoSys.
Comments and Tradeoffs for NexSAT
20 May 03NexSAT Steering Group Meeting 1 SATELLITE DATA LINK SYSTEM (SDLS) TOWARDS A DEDICATED MOBILE SATELLITE COMMUNICATION SYSTEM FOR A/G SAFETY COMMUNICATIONS.
Presentation to Nexsat steering group - 20 / 05 / 03 Tous droits réservés © Alcatel Space All rights reserved SDLS Current Activities Presentation to NexSat.
March 8th and 9th 2006 AGCFG / NEXSAT Meetings Toulouse 1 SATCOM FOR ATM ESA Initiative to promote an ATM dedicated Satcom.
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Introduction Brussels, February 2013 Presented by: Manfred Unterreiner.
Aerospace Division Anastasia Project Airborne Communication and Navigation Satellite Technologies And Techniques in a System Integrated Approach Presentation.
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
1 BNSC 3 Programme Aviation use of Broadband Satcom Paul Ravenhill Helios Technology.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Whole Airspace ATM System Safety Case - Preliminary Study
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Mission Trajectory Step 1 From planning to deployment.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
The European Organisation for the Safety of Air Navigation ARINC 424A specification and SESAR WP9.31 AIXM Procedure Modelling/Encoding seminar Brussels.
1 18 March 2010AGNA meeting EASAC update Yves Morier.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
1 EU funding for sustainable energy. 2 Standardisation Ivan Konaktchiev Certification Engineer.
Additional aviation spectrum allocation for AM®S
ESA Iris Programme: status
CEATS Central European Air Traffic Services
International Cooperation
Chris Shaw, EUROCONTROL Experimental Centre
Chris Shaw, EUROCONTROL Experimental Centre
Future Communications Infrastructure – An update
Joint FAA/Eurocontrol Future Communications Study (FCS)
Presentation transcript:

ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31

ANASTASIA European Commission Project, 6th framework programme Integrated project, aeronautical and space priority 20 ME Euro 31 partners Starting date: 1st of April 2005 Duration: 4 years Goal: To define the Future CNS Avionics beyond 2010

RATIONALE Rationale/Input : New needs : The foreseen increase of the traffic will request to improve operational capacity and safety of the air transport system New space based technologies : Satcom, satellite navigation Output : To propose new CNS systems and architectures to fit with these new needs, on the basis of the evaluation of these new technologies

Partners 31 Partners : 13 countries, Large Industrials, SME, universities, Research centers Core Team :THALES-AVIONICS, AIRBUS, DASSAULT-Aviation, DLR Cordinator : THALES-AVIONICS Expertise Airframers: Airbus ( F and G), Dassault Aviation (F) Satellite : Inmarsat(UK), Astrium(F) Research centres: DLR(G), NLR(NL), EADS research centers(F, G) ,Thales research center(UK), RISDE(R), Joanneum(A) Universities: INSA/ENAC(F), Tech univ Brauschweig(G), Vigo univ(SP), UCL(UK), Imperial college(UK), University of Surrey(UK) Suppliers : Skysoft(P), Data respons(N), Gatehouse(DK),Geozup (R), Triagnosys(G), Rhea systems(B), WIS(UK), Sirehna(F), EADS(F,G), Astrium(F), Selenia(I), THALES Avionics(F, UK), ASCOM (CH)

The ANASTASIA objectives ANASTASIA aims to carry out research, evaluation and cost benefit analysis to define future CNS avionics beyond 2010 Navigation Investigate Multiconstellation, multifrequency satellite positioning Antenna design Advanced signal processing Receiver integration Hybridisation techniques with low cost inertial sensors Communication To establish the requirements for an affordable aeronautical Satcom system for ATM To design, implement and demonstrate a preliminary such Satcom system Prototype Higher bandwidth services and Systems for future a/c Communication requirement Consolidate future needs of Surveillance with the requirements and key technologies from COM & NAV

Project Implementation

ANASTASIA WBS – SP level ANASTASIA Project SP2 Needs and Aircraft requirements AIRBUS-F SP3 Navigation Space Based Technologies THAV SP4 Communication Space Based Technologies THAUK SP6 Dissemination DASSAULT SP5 Operational characterisation and Evaluation DLR SP1 Management and technical coordination

SCHEDULE

SP 2 Objectives To identify the requirements for the new satellite based CN(S) functions for both business jets and commercial aircraft “Top – Down” analysis of the future needs foreseeable in 2020, and their associated performances “Top – Down” analysis of the airborne functional requirements foreseeable in 2020, for both navigation and communication “Bottom-up” assessment of the airborne opportunities introduced by foreseeable technological evolutions (identified in SP 3 and 4)

SP 3 Objectives To define the new space based navigation technologies that will fulfil the civil aviation needs and to validate their performance Design, development and validation with key technology mock-ups Advanced signal processing and navigation algorithms for Multiconstellation, Multifrequency satellite positioning Antenna Receiver Hybridised system with low cost inertial sensors (Micro Electro-Mechanical System - MEMS) Integration

SP 4 Objectives 1. To design, implement and demonstrate a prototype of an affordable aeronautical SATCOM system that will meet evolving European ATM requirements such as using satellites to complement the congested VHF spectrum. It shall be based on current or planned space segment and shall have maximum synergy with existing and planned non-ATM aeronautical SATCOM systems 2. To carry out research into higher bandwidth services, systems and airborne equipment to meet future SATCOM requirements in ATM such as delivering weather maps and electronic flight bag data – this work will concentrate on antenna issues since experience has shown that this is the key technical risk area.

SP4 ORGANISATION

SP 5 Objectives To assess the performances of key satellite Navigation and Communication technologies in actual environment Simulation Flight trials Data analysis

SP 6 Objectives To disseminate the results Use of the ANASTASIA results in a way which will allow future regulations to take into account the future generation of satellite based NAV and COM receivers ANASTASIA results will be presented to ICAO, RTCA, EUROCAE, ARINC,.. Contributions to standards and regulations, especially for performance and safety assessment, and certification issues will be proposed to the appropriate authorities

Overall Concept