Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
ICAO TEM/NOSS Symposium November 2005
Advertisements

Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Date: in 12 pts 28 th Meeting EQF Advisory Group Brussels 2 -3 December 2014.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Dr. Barry Kirwan, EUROCONTROL Safety Culture Seminar introduction.
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Nigel Makins EUROCONTROL
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
Gender Equality is key towards the eradication of Violence against Women.
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Eurojust cases involving crimes against children
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Programme adoptions Cohesion Policy:
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
LSSIP Objective AOP03.
State of Play RBMPs and WISE reporting (9/07/10)
Update on implementation WG F 27 April 2010 Maria Brättemark
Update on legal issues Strategic Coordination Group 23 February 2010
Update on legal issues Strategic Coordination Group
Update on status of reporting and validation process
LAMAS Working Group June 2015
DG Environment, Unit C.2 Marine Environment and Water Industry
Presentation transcript:

Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR

2 Comprehensive Explanation Scope: Multi-N (changed in ESSIP Plan ed to match the reports provided by individual ANSPs in the LSSIP 2012 exercise) Applicability area: AT / BA / BE / BG / CH / CZ / DE / DK / EE / ES / FI / FR / HR / HU / IE / IT / LU / LV / MAS / ME / NL / NO / PL / PT / RO / RS / SE / TR / UA / UK Requirements: Implement in En-Route operations in selected ACCs, information exchange mechanisms, tools and procedures in support of Basic AMAN operations in adjacent and/or subjacent TMAs. ESSIP Plan 2013 / Objective ATC15

3 What is new or has changed for ESSIP Plan ed Scope changed from ECAC to Multi-N ESSIP Plan 2013 / Objective ATC15

4 Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan: [TS-0305] - Arrival Management Extended to En Route Airspace – ESSENTIAL IDP: WP 5.2 ESSIP Plan 2013 / Objective ATC15

5 Most important SLoA(s) ASP01 – Develop safety assessment for the changes Followed by: REG01 – Conduct safety oversight of the changes REG02 – Approve the procedures for operation of AMAN tools in en route sectors supporting AMAN in adjacent/subjacent areas. …then: ASP02 – Adapt the ATC systems that will implement arrival management functionality (…) ASP03 – Implement ATC procedures in En-Route airspace/sectors (…) …then ASP05 – (AIS Providers) Revise and publish Aeronautical Information documents ESSIP Plan 2013 / Objective ATC15

6 Finalisation Criteria and Closed Questions Follows from what is said on slide before: REG01 / REG02 – The NSA provides an oversight of the changes and the introduction of the change into service was accepted and a notification of acceptance has been provided to the ANSP. ASP01 – ASP03 – assessed, adapted and implemented, documented and in operational use. ASP05 – AIS information is updated. NSA conducts oversight of changes? Safety assessment done by ASP and accepted by NSA? Notification of acceptance received from NSA? Information available in the AIP? ESSIP Plan 2013 / Objective ATC15

7 ESSIP Report 2012 It was a new objective in ANSPs have implemented it; another 4 have partially completed the actions and 11 reported as planned within the objective FOC date (12/2017). From the reported ANSP plans, the current estimate for achievement is 12/2016 for 80% of the applicable area. ESSIP Plan 2013 / Objective ATC15

8 Links and contacts Objective Coordinator: DellOrto Luca, EUROCONTROL Objective Expert(s): Paul Conroy Predrag Terzioski, ESSIP Plan 2013 / Objective ATC15