The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL 19 February, 2006 SESAR ATM Master Plan An introduction.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

1 Welcome Summary - First visit Delhi Integra A/S Independent consultancy company Headquarter located in Copenhagen, Denmark Working worldwide.
1 Welcome Safety Regulatory Function Handbook April 2006.
1 2 nd Shanghai, 19/02/06 Architecture for Next Generation Grids Kostas Tserpes, NTUA Shanghai, 20th of February 2006.
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
1 UAS INTEGRATION & FREQUENCY SPECTRUM Mike Lissone EUROCONTROL UAS FOCAL POINT 2nd EU UAS PANEL WORKSHOP 2011 September , 2011.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
REGIONAL POLICY EUROPEAN COMMISSION The urban dimension : State of play and perspectives Władysław Piskorz DIRECTORATE-GENERAL.
Global ATM Operational Concept
By: Michael A. Cirillo, Vice President, Air Traffic Organization, System Operations Services Date:March 27, 2007 Federal Aviation Administration Performance.
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
SESAR DEFINITION PHASE
The Single European Sky ATM Research (SESAR) initiative
Module N° 7 – Introduction to SMS
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
Project Appraisal Module 5 Session 6.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
Draft Change Management Strategy Framework and Toolkit An Overview TAU Workshop: Vulindlela Academy (DBSA) 12 April 2012 Presenter: Dr Patrick Sokhela.
Integrated Approach to Area Master Planning in Jubail Industrial City
14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Global Aviation Safety Plan
AIM Operational Concept
Introduction to Program Budgeting Katherine Barraclough Consultant, World Bank Fiscal Management Reform Workshop, Istanbul, Turkey, June 6-8, 2005.
Internal Control–Integrated Framework
Korkeakoulujen arviointineuvosto — Rådet för utvärdering av högskolorna — The Finnish Higher Education Evaluation Council (FINHEEC) eLearning and Virtual.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Future Challenges in Aviation Psychology
Course: e-Governance Project Lifecycle Day 1
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
<<Date>><<SDLC Phase>>
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
SESAR Single European Sky Air traffic management Research
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL Responding to the 2020 Challenge Introduction to SESAR DEFINING THE.
David Bowen Head of ATM Operations and Systems
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
Nigel Makins EUROCONTROL
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
© Services GmbH Proposal writing: Part B 2/1/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
Key factors in the transport policy to encourage better integration Sixty-Third Session of UNECE, Geneva, 30th March 2009 "Economic Integration in the.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
CEATS Central European Air Traffic Services
OptiFrame WP1: Project Management
ASSTAR Project Overview & User Forum Objectives
The Single European Sky Implementation Programme: SESAME
SPECTRUM STRATEGY & VISION
Directorate-General Energy and Transport
Presentation transcript:

The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL 19 February, 2006 SESAR ATM Master Plan An introduction

Page : 2 19 February, 2006 Where does the SESAR ATM Master Plan fit ? 2-year Definition Phase year Definition Phase SESAR Implementation Programme Phase 1: R&T/D, Validation Deployment SESAR Implementation Programme Phase 1: R&T/D, Validation Deployment Air transport industry unsolicited proposal to EC Air transport industry unsolicited proposal to EC SESAR Air Navigation Service Providers, Airlines, Airports, Manufacturing Industry, Military users/providers, Professional Associations, Regulators, EUROCONTROL and Research Organisations To the 2020 ATM concept SESAR is a European ATM Implementation Programme : SESAR ATM Master Plan SESAR ATM Master Plan

Page : 3 19 February, 2006 Develop Future ATM Target Concept M3 PRODUCT Deployment Sequence - Develop Options & Select Best M4 DEPLOYMENT Build the ATM Master Plan M5 ACTION PLAN Define Organisation & Programme of Work for M6 GO AHEAD Define Performance Requirements & Best Practice M2 SPECIFICATION Characterise & Understand Todays Situation plus Future Expectations M1 MARKET Milestones through Project Definition Phase D1 06 Jul 06 D2 06 Dec 06 D3 06 Jun 07 D4 06 Oct 07 D5 06 Jan 08 D6 06 Mar 08 MILESTONES DELIVERABLES

Page : 4 19 February, 2006 At M 1 –Status of Current Situation & Future Expectations (D1) Capture of Current Situation with clear identification of Rationale Strengths, Weaknesses, Deficiencies, Overview of Current Initiatives, etc. Expectations for Future At M 2 – will have Set of Requirements for Future ATM System Network (D2) Outline Vision of Future Air Transport Industry & Role of ATM Performance Requirements for Future Network Identification of Best Practice & Principles upon which to Build At M 3 – will have Definition of Future ATM Target Concept (D3) Concept of Operations Architecture for Future ATM System Network Set of Enabling Technologies Identified Outline of Total Cost & Preliminary Assurance that Target is Viable Key Objectives at each Milestone (1 of 2)

Page : 5 19 February, 2006 At M 4 – will have a Best Deployment Sequence (D4) Confirmation of Viability (Technical, Financial, Institutional, etc.) Options for Deployment Sequence & Recommended Best Approach Definition of Deployment Packages (Transition from Legacy Systems/Framework) At M 5 – will have the SESAR ATM Master Plan (D5) Detailed Plan of Actions which All Relevant Organisations need to undertake to Implement Changes Inputs to Future Business Plans, R&T/D Plans, Risk Assessment Régimes, Development of Future Management Processes, etc. At M 6 – will have Basis of SESAR Implementation Programme of Work for (D6) Proposed Management Structure for SESAR Implementation Phase Proposed Structured Lifecycle & Methods to Support Implementation Detailed Programme of Work for First 5 Years of Implementation Phase Key Objectives at each Milestone (2 of 2)

Page : 6 19 February, 2006 SESAR Work Breakdown Structure (WBS) EURC RCT ARPT User Pilots US-IND ANSP MIL IND CTRL SR 1. Institutional Framework Definition2. Performance Requirements & System Definition4. Work Programme for Implementation Plan Definition Workpackage Task Institutional System Definition Implementation Plan Work Programme

Page : 7 19 February, 2006 D1 recommendations; Air Transport Framework & Air Traffic Management from a business perspective Integrated partners Link their businesses Amortise effects of sudden fall in demand Empowerment ATM industry to make own business decisions De-Fragmentation Performance framework: a basis for decision making Liberalised approach for the provision of Air Navigation

Page : 8 19 February, 2006 D1 recommendations: The Institutional View of ATM Consistent framework of legislation & regulation Constructive tension Between institutional & business frameworks Unambiguous ATM safety regulatory framework Across the whole air transport industry Global interoperability By performance-based regulation & a simplified approach to developing standards Overarching governance structure for implementation

Page : 9 19 February, 2006 Role of the Human in ATM Today PROACTIVE APPROACH TO CHANGE MANAGEMENT Collaboration, transparency & inclusiveness Involvement of staff at all levels Significant improvement Resource planning Licensing

Page : February, 2006 D1 recommenadtion:Safety, Environment, Security & Transition Aspects SAFETY Accurate measurement of current level of safety Stronger emphasis on safety design criteria Importance of human in ATM ENVIRONMENT Proactive management approach SECURITY Security of future ATM System matching the risk APPROACH TO TRANSITION Flexibility in Systems architectural design European ATM System design authority role must be central

Page : February, 2006 D1 Recommendations: Operational & Technical View of the current ATM System A- One Single design authority for European ATM System empowered to define, plan & manage the implementation of the System which has: One functional architecture An integrated ground-based and airborne systems design Separation of Services: ATM services Supporting (technical) services Physical assets Flexibility B- Focused R&D

Page : February, 2006 Work package 2.5 Working package 2.5 Technology Assessment The overall goals of this WP are: Identification and characterisation of candidate technologies (available and new / innovative ones) in order to support the concept of operation and the architecture options for mid & long-term objectives I dentification of risks and blocking points concerning the introduction of the candidate technologies (e.g. open technical issues or technology availability) Development of a strategy how to resolve the identified risks and blocking points A consensus is needed on a technology roadmap. The roadmap must: operationally support future ATS be applicable worldwide and institutionally accepted include supporting R&D themes

Page : February, 2006 D2 ATM Performance Targets Overall Scope An outline vision of the future air transport industry and the role of ATM within it. Framework of economic, safety, environmental and security regulation enabling a long term sustainable air transport Identification of performance gaps and the potential for improvements Flexibility to quickly adapt to market changes A viable transition path needs to be achievable Short term solutions to resolve the present urgent blocking points needs to be included Business model supported by all stakeholders to achieve optimum benefits

Page : February, 2006 MOP 2 Objectives OBJECTIVE 1 - Vision of the Air Transport Industry in A first vision for the future air transport industry ATM model in the long term Impact on stakeholders OBJECTIVE 2 - Performance Targets and requirements for the ATM Concept Short-, mid and long terms OBJECTIVE 3 - Best practice, ongoing activities and principles for the way forward Improvements of present mechanism to enable future performance targets A set of principles how changes to the conduct of ATM will be undertaken On-going initiatives and programmes already aligned which can contribute to meeting the performance targets in the short-term

Page : February, 2006 D2 Key messages Results First brain storming session Excom Future market environment- Growing but following effects need to be considered. Changes in market segments: UAV/VLJ/MIL/GA/BA Security measures/risks New traffic patterns within Europe and between continents Fleet composition ( I.e effect A 380) Open Sky Agreement Fuel costs Potential constraintsInfrastructure Environment

Page : February, 2006 D2 Key messages (Continued) ATM services- Providing maximum added value (performance) to European Air transport noting: Resolving fragmentation- Reduction ANSPs/Unbundling of services/Cost effectiveness Commitment and business objectives from each stakeholder Differential services/funding/financing/charging principles Ownership of assets Governance of R&D, network and services Potential for competition/market mechanisms ATM security Need to improve predictability/flexibility/ adaptability of services Changing human role in future ATM services

Page : February, 2006 D3 Scope: ATM target concept ATM target concept a concept being a combination of : Operational concept element The principles of operation The architectural principles The technical infrastructure The supporting technologies

Page : February, 2006 AGCFG - SESAR cooperation AGCFG can assist the SESAR project in particular to understand the Future Communication Study assessment, results and recommendations In contributing to create common SESAR/AGTF positions SESAR can assist AGCFG in particular by enlarging the dissemination of FCS work providing stakeholder feedback to AGTF endorsing through this feedback common reference positions AGCFG/SESAR cooperation is key to both projects Through this we could achieve : Consensus on key technologies Harmonised selection of aviation related technology, with no unjustified proliferation of multiple technologies addressing the same needs. Global interoperability

Page : February, 2006 Where can AGCFG assist? AGCFG experts support is needed on communications strategy : To disseminate,and to explain the initial communications strategy This is particularly scope of D1 phase of SESAR (Mar - June 06) To create full understanding & rationale between AGCFG & SESAR stakeholders on choices, methodology, candidate technologies, issues etc. related to the future communications strategy This is particularly the scope of D3/D4 phase of SESAR (Sep 06 - Oct 07); Openly respond to SESAR stakeholders questions