Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
1 Item 2.7 ECIP developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008.
Advertisements

Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Presentation to ADQ Implementation Workshop
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Mission Trajectory Step 1 From planning to deployment.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ENV02 ESSIP Plan 2015 Bernd HILL DPS/PEPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR

2 Objective AOM13.1 Harmonise Operational Air Traffic (OAT) and General Air Traffic (GAT) handling Comprehensive Explanation What is new or has changed since LSSIP 2012 Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions ESSIP Report 2012 Objective Coordinators Analysis, recommendations, tips & tricks Links and contacts ESSIP Plan 2013 / Objective AOM 13.1

3 Comprehensive Explanation Area of applicability: All ECAC States Initial Operational Capability (IOC): 01/2012 Full Operational Capability (FOC): 12/2018 Items to be implemented are: Common rules and principles for OAT and OAT/GAT interfaces Harmonised OAT FPL (ICAO format) Migration of Military AIS to EAD Implementing European OAT – IFR Transit Service (OATTS) AOM13.1 is: more than integrated (Civ-Mil) ATS provision and not only EUROAT Specification Main aim is to harmonise handling of OAT (traffic which can not /does not fly as GAT). Phased approach in implementation of harmonised handling of Operational Air Traffic (OAT) & General Air Traffic (GAT); ESSIP Plan 2013 / Objective AOM 13.1

4 What is new or has changed since LSSIP 2012 Nothing ESSIP Plan 2013 / Objective AOM 13.1

5 Link to European ATM Master Plan After the revision of the ATM Masterplan in 2012, the objective AOM13.1 now covers two SESAR OI steps: OI step - [AOM-0202] – Enhanced Real time Civil-Military Coordination of Aispace Utilisation OI step - [AOM-0301]-Harmonised EUROCONTROL ECAC Area Rules for OAT-IFR and GAT Interface ESSIP Plan 2013 / Objective AOM 13.1

6 Most important SLoA(s) Clarification of some SLoAs sequence : 1.The EUROCONTROL Specification for ECAC Area Rules for OAT-IFR has been published and distributed to the states which now act upon it (SLoA AOM13.1-REG01 and AOM13.1-MIL02). Finalisation of REG01 and MIL02 will enable production of implementation version of EUROAT (a single set of rules). Since OAT is a matter of national sovereignty, the intended achievement to conduct OAT-IFR in Europe under a single set of rules will depend on the magnitude of national implementation. The single set of rules can have published known national differences in it. The Specification can be downloaded from the following website: 2.The SLoAs ASP01 and MIL01 are to be implemented after completion of SLoAs REG01 and MIL02. ESSIP Plan 2013 / Objective AOM 13.1

7 Finalisation Criteria and Closed Questions Finalisation criteria: Contact your subject matter expert to determine the deployment Status for each SloA Statements to be made based on Finalisation criteria Closed questions: Not yet developed ESSIP Plan 2013 / Objective AOM 13.1

8 ESSIP Report 2012 Almost 1/3 of Stakeholders report either Not Applicable or No Plan with the argument of no operational need or that the objective is still under review. Some justifications for no operational need state: A level of OAT flights does not necessitate the application of such rules and procedure There is no fixed wing aircraft in the respective national Air Force However, Objective AOM13.1 sets harmonised rules for handling of OAT IFR flights in controlled national airspace of an FIR, but also at FAB level, regardless of the aircraft/ OAT flight nationality. As most of the ECAC States are NATO Member States, there are OAT IFR flights of foreign military aircraft through national airspaces/FAB airspaces. The national Air Forces need to know beforehand what set of rules to expect to pursue their operations/(joint) military exercises in another national/FAB airspace. ESSIP Plan 2013 / Objective AOM 13.1

9 Links and contacts Objective Coordinator: Octavian CIOARA Objective Expert(s): Edgar REUBER RazvanBUCUROIU Olivier MROWICKI