Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Advertisements

Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
© EUROCONTROL 2012 – Network Management Operations Centre (NMOC/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Hans Koolen EDITION 12/11/2012 WHY.
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
© EUROCONTROL 2013 – Network Manager Operations Centre (NMOC/CFMU) BENEFITS OF FLIGHT ACTIVATION MONITORING Hans Koolen EDITION 16/01/2013.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Marc Deboeck ADQ Implementation Workshop 29 May 2013 Directorate Single Sky (SES) Support to CAA-NSA Single Sky Implementation Support to NSAs.
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Mission Trajectory Step 1 From planning to deployment.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR

ESSIP Plan 2013 / Objective FCM012 Objective FCM01 Comprehensive Explanation What is new or has changed since LSSIP 2012 Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions ESSIP Report 2012 Objective Coordinators Analysis, recommendations, tips & tricks Conclusions Links and contacts

Comprehensive Explanation ESSIP Plan 2013 / Overview LSSIP This Pan-European objective aims at enhancing tactical flow management services through the introduction of real-time aircraft position and meteorological data to optimise Air Traffic Flow and Capacity Management (ATFCM). Area of applicability: All ECAC States Initial Operational Capability (IOC): 08/2001 Full Operational Capability (FOC): 12/2006

What is new or has changed since LSSIP 2012 ESSIP Plan 2013 / Overview LSSIP Due to its relationship with the EUR ATM MP, the type of the objective has changed from ECIP to SESAR

Link to European ATM Master Plan ESSIP Plan 2013 / Overview LSSIP OI Step [IS-0102] – Improved Management of Flight Plan after Departure

Most important SLoA(s) ESSIP Plan 2013 / Overview LSSIP ASP01 Supply ETFMS with Basic Correlated Position Data ASP02 Supply ETFMS with Standard Correlated Position Data ASP03 Receive and process ATFM data from the CFMU ASP04 Inform CFMU of flight activations and estimates for ATFM purposes Each SLoA should be fulfilled in accordance with the relevant provisions of the CFMU Flight Progress Messages document

Finalisation Criteria and Closed Questions ESSIP Plan 2013 / Overview LSSIP Reception by CFMU of CPRs (in ASTERIX Category 062 format) ATFM messages received from the CFMU are: automatically correlated to the ATC Flight Plan data presented to the Air Traffic Controllers Reception by CFMU of the FSA messages No closed questions available

ESSIP Report 2012 ESSIP Plan 2013 / Overview LSSIP Objective late, but with a good level of implementation of the priority SLoAs. The States yet to implement the priority SLoAs of this objective have shown a sound commitment to do so. However, the likelihood of implementing all SLoAs still remains very low. The main reason for delaying the implementation is of a technical nature and lack of operational justification. Implementation is mostly linked to the deployment of new systems or to major upgrades of existing ones, therefore the stand alone implementation of the objective was not considered beneficial. Sometimes the objective is perceived as not being operationally justified at local level. However the implementation decisions shall also take into account the network benefits.

Objective Coordinators Analysis, recommendations, tips & tricks ESSIP Plan 2013 / Overview LSSIP Implement the most important SLoA(s) ASP01 ASP02 ASP03 ASP04 When reporting, be more specific on what has been completed and the prospects for the rest of the SLoAs. Ensure that there is an effective link with the NMD and the information on the implementation originates from a ODSG member.

Conclusions ESSIP Plan 2013 / Overview LSSIP The implementation of this objective has a positive impact on: The reduction of wasted capacity; The reduction of delays The reduction of unexpected overload situations Note that the delivery to the NM of Correlated Position Reports containing the SSR transponder code assignments for GAT/IFR is an obligation on the Air Navigation Service Providers, under the NM IR (Commission Regulation (EU) No 677/2011)

Links and contacts ESSIP Plan 2013 / Overview LSSIP Objective Coordinator: Octavian Cioara NMD Objective Expert: J. Koolen