CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas 10.10.2002 CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.

Slides:



Advertisements
Similar presentations
Conducting your own Data Life Cycle Audit
Advertisements

4.1- Plot Points in a Coordinate Plane
Slide 1 Insert your own content. Slide 2 Insert your own content.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
María Muñoz General Directorate for Community Funds Ministry of Economy and Finance SPAIN María Muñoz General Directorate for Community Funds Ministry.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Validation & Measurement Methods for the PHARE Demonstrations R A Whitaker Validation Project Leader.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A Slot Swapping Applications for CDM P.R. de Waal, NLR M.H. van den.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 CARE-ASAS Activity 3: ASM Estimating safe separations.
CARE ASAS Validation Framework. Partners CARE ASAS Board - Francis Casaux EURCONTROL - Mick van Gool, Ulrich Borkenhagen Consortium Partners Aena, Isdefe,
Whole Airspace ATM System Safety Case - Preliminary Study
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OHA CARE-ASAS Activity 3: ASM Autonomous Aircraft OHA.
© 2002 EUROCONTROL 1 One Sky for Europe EUROCONTROL CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION FRAMEWORK DISSEMINATION FORUM Validation Data Repository.
CARE ASAS Validation Framework System Performance Metrics 10th October 2002 M F (Mike) Sharples.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Introduction to the ASM project CARE-ASAS Activity 3: Airborne Separation Minima Final.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
0 - 0.
Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
The Performance Framework Episode 3 - CAATS II Final Dissemination Event Laurent Tabernier EUROCONTROL Project Episode 3 Brussels, 13 & 14 Oct 2009.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Overview of NLR Free Flight project ‘97 - ‘99 Jacco Hoekstra
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Page 1 The ONESKY (Single-Sky) project and what it means for ASAS.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Operational applications enabled by ADS-B
ASAS Thematic Network Workshop #2: TAGA - Traffic Awareness for General Aviation DFS Research and Development October 2003 TAGA - Traffic Awareness for.
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
Page 1 ASAS Thematic Network Second Workshop “Safety and ASAS Applications” Progress and contents Safety and ASAS Applications Progress and Contents Ken.
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
A centre of expertise in digital information managementwww.ukoln.ac.uk QA for Web Sites Brian Kelly UKOLN University of Bath Bath, BA2 7AY
1 EUROPEAN TOPIC CENTRE ON WATER WATERBASE Rivers Content and structure of Waterbase Rivers Update procedure Products based on Waterbase Rivers Future.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
Applications from packages I to III
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
IFly project: Airborne Self Separation as basis for advanced en route ATM Henk A.P. Blom iFly coordinator National Aerospace Laboratory NLR
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
Develop Project Charter
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Federal Aviation Administration AP23 briefing on D3: ASAS Concept of operations ASAS-GN Seminar 13 Nov 08, Rome By Ken Carpenter, QinetiQ.
CARE/ASAS Validation Framework Ros Eveleigh Activity 2 Project Manager NATS.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
ASSTAR Overview Jean-Marc Loscos, DSNA
Chris Shaw, EUROCONTROL Experimental Centre
Sectoral Qualification Framework
Chris Shaw, EUROCONTROL Experimental Centre
Presentation transcript:

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION FRAMEWORK DISSEMINATION FORUM Isdefe Ingeniería de Sistemas

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas Isdefe: Juan Alberto Herrería García Bretigny, 10/10/2002 CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION FRAMEWORK DISSEMINATION FORUM WP 1: SCENARIO FRAMEWORK ASAS SCENARIO REPOSITORY

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas ASAS Scenario Repository OBJECTIVE CONCLUSIONS CONTENTS INTEGRATION ON VDR

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas Objectives OBJECTIVES

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas MAIN GOAL: TO CREATE A DATABASE OF VALIDATION SCENARIOS PREVIOUSLY USED TO VALIDATE ASAS APPLICATIONS COLLECTION OF REPRESENTATIVE, PREVIOUS SCENARIOS USED IN ASAS EXPERIMENTS FROM –THE ORGANISATIONS OF THE CONSORTIUM –ORGANISATIONS EXTERNAL TO THE CONSORTIUM TO DISSEMINATE THE DATA COLLECTED Objectives

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas Contents CONTENTS

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas ORGANISATIONS INTERNAL TO THE CONSORTIUM NATS NLR QinetiQ ORGANISATIONS EXTERNAL TO THE CONSORTIUM CENA EUROCONTROL EXPERIMENTAL CENTRE (EEC) UNIVERSITY OF GLASGOW Contents (I) ORGANISATIONS CONTRIBUTING

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas SCENARIOS FOR AIRBORNE TRAFFIC SITUATIONAL AWARENESS Enhanced Visual Acquisition, from University of Glasgow (COAST) Enhanced Visual Acquisition (EMERALD) TOTAL: 2 scenarios SCENARIOS FOR AIRBORNE SPACING NONE TOTAL: 0 scenarios Contents (II) SCENARIOS GATHERED

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas SCENARIOS FOR AIRBORNE SEPARATION Station Keeping in TMA, from EEC (EACAC JUN 99, JUN 00, NOV 00, NOV 01) Longitudinal Station Keeping, from NATS Longitudinal Station Keeping (EMERALD) Station Keeping on Approach (EMERTA) Lateral and Vertical Crossing and Passing in En-route, from EEC (EACAC JUN 99, JUN 00, NOV 00, NOV 01) ASAS Crossing Procedure, from CENA (ACP, ASAS_MBB99) –Strategic ASAS through flight plans. Merging ASAS equipped aircraft with non ASAS aircraft in MAS, from University of Glasgow Closely Space Parallel Approaches (EMERALD) TOTAL: 15 scenarios Contents (III) SCENARIOS GATHERED

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas SCENARIOS FOR AIRBORNE SELF-SEPARATION Autonomous Aircraft, from EEC, (FAST, FREER-3) Autonomous Aircraft in TMA, from NLR Autonomous Aircraft (EMERALD) Basic Cruise Free Flight, from NLR TOTAL: 5 scenarios Contents (IV) SCENARIOS GATHERED

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas GENERAL DATA Validation Framework Identification (ID) Validation Framework Version Author Organisation Creation Date Execution Date Name of the Project/Study Validation Methodology Validation Tool ASAS CATEGORY AND APPLICATION HIGH LEVEL OBJECTIVES DEDICATED TEMPLATE FOR EACH SCENARIO (SCENARIO COMPONENTS) DOCUMENTS DEVELOPING THE SCENARIO Contents (V) SCENARIOS DATA

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas Integration on VDR INTEGRATION ON VDR

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas Integration on VDR (I) CONTENTS GENERAL DATA Validation Framework Identification (ID) Validation Framework Version Author Organisation Creation Date Execution Date Name of the Project/Study Validation Methodology Validation Tool ASAS CATEGORY AND APPLICATION HIGH LEVEL OBJECTIVES LINK TO THE DEDICATED TEMPLATE FOR EACH SCENARIO LINKS TO THE DOCUMENTS DEVELOPING THE SCENARIO

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas FOUR POSSIBILITIES TO QUERY THE ASAS REPOSITORY Currently ASAS Applications & Associated Phase of Flight High Level Objectives Projects In the near future Validation Technique Judgmental/Survey Analytical Fast Time Simulation Real Time Simulation Integration on VDR (II) QUERIES

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas Conclusions CONCLUSIONS

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas THE ASAS REPOSITORY IS AN EXCELLENT TOOL TO TRACE THE VALIDATION EXERCISES OF ASAS APPLICATIONS ITS INTEGRATION WITHIN THE VDR IMPROVES THE POWER AND FURTHER DISSEMINATES ITS INFORMATION ALL THE EXPERTS PERFORMING EXPERIMENTS WITH ASAS APPLICATIONS ARE REQUESTED TO POPULATE THE VDR WITH THE DATA OFTHE EXPERIMENTS THIS WAY, THE WHOLE EXPERTS COMMUNITY WILL BENEFIT OF A POWERFUL TOOL SUCH AS VDR, DISSEMINATING THEIR EXPERIENCES AND RESULTS ASAS SCENARIO REPOSITORY FORMS THE DELIVERABLE 2 Conclusions

CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas THANK YOU VERY MUCH CENA EEC UNIVERSITY OF GLASGOW EUROCONTROL VDR TEAM FOR CONTRIBUTING TO THE SUCCESS OF THIS TASK Conclusions