Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR 13.09.2013.

Slides:



Advertisements
Similar presentations
Overview of the interoperability Regulation
Advertisements

Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ENV02 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective SAF11 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective ATC 15 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective SRC-SLRD ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR

2 Comprehensive Explanation Target Date: 12/2018 SCOPE: ECAC – All States except SK Electronic dialogue as automated assistance to controller during coordination and transfer addresses the facilities and processes between ATC components serving ATC units. ATC17 complements ITY-COTR. Purpose: Co-ordination prior to the transfer of flights from one ATC unit to the next; Transfer of communication from one ATC unit to the next ATC unit of such flights; Support the exchange of OLDI messages related to the Basic procedure and, if applicable, SSR Code Assignment Message. ESSIP Plan 2013 / Objective ATC17

3 What is new or has changed for ESSIP Plan ed Change in the applicability area: removal of SK ESSIP Plan 2013 / Objective ATC17

4 Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan: [CM-0201] – Automated Assistance to Controller for Seamless Coordination, Transfer and Dialogue - ESSENTIAL IDP: WP 5.2 ESSIP Plan 2013 / Objective ATC17

5 Most important SLoA(s) All Note: whereas this objective is defined with an ECAC scope, it will be the decision of the individual ATS Provider to: define its local applicability in terms of relevant ATSUs, and identify the processes to be implemented (refer to ATC17 SLoAs and in particular, their finalisation criteria, for the complete list of processes). ESSIP Plan 2013 / Objective ATC17

6 Finalisation Criteria and Closed Questions For REG01: Formal acceptance by NSA of the proposed changes For ASP01: Deliver safety arguments for all changes related to implementation of electronic dialogue for Coordination and Transfer. For ASP02/3/4 (important to clearly identify ATSUs involved and which processes are implemented): Ground systems updated Technical File with evidences of compliance to EC Declaration of Verification; Functions (form the list in it he individual SLoAs) documented and in operational use. For ASP05: Training plans updated and training package developed by the ANSP for the use of electronic dialogue procedure. ESSIP Plan 2013 / Objective ATC17

7 Supporting Material EUROCONTROL-Specification for On-Line Data Interchange (OLDI) Edition 4.2 (OJEU Reference 2011/C 146/05) EUROCONTROL-System Supported Coordination (SYSCO) Implementation Guidelines ESSIP Plan 2013 / Objective ATC17

8 ESSIP Report 2012 Objective introduced in the ESSIP Plan in No ANSPs have reported it as completed; 6 reported it partially completed (functionalities available and ATCOs trained but not implemented operationally). This requires agreement with neighbouring ACCs where the same functionalities must be available. From the reported ANSP plans, the current estimate for achievement is 12/2016 for 80% of the applicable area. ESSIP Plan 2013 / Objective ATC15

9 Links and contacts Objective Coordinator: DellOrto Luca, EUROCONTROL Objective Expert: Stephen Morton, ESSIP Plan 2013 / Objective ATC17