ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations (ConOps) ACG Workshop, 17 February 2004 Jose Varela and Ian Ramsay, SD/ESC.

Slides:



Advertisements
Similar presentations
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Advertisements

1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Advanced Piloting Cruise Plot.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Requirements Engineering Process
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
ALGEBRA Number Walls
David Burdett May 11, 2004 Package Binding for WS CDL.
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Role of Requirements in Operational Concept Validation (RORI-OCV) Requirement Development Strategy Ir. Y.A.J.R. van de Vijver (NLR), AP5 Working Meeting,
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
1 Performance indicators, targets, steering Technical Interchange meeting Toulouse, May 2002 Xavier FRON Head Performance Review Unit.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
ZMQS ZMQS
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
Pearls of Functional Algorithm Design Chapter 1 1 Roger L. Costello June 2011.
ABC Technology Project
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Mission Trajectory Step 1 From planning to deployment.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'….
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
SIMOCODE-DP Software.
The European Organisation for the Safety of Air Navigation AIRM Review Forum AIRM Status Report.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
Week 1.
Let’s take a 15 minute break Please be back on time.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Future Challenges in Aviation Psychology
Ensuring a 'Flexible Use of Airspace'….
Presentation transcript:

ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations (ConOps) ACG Workshop, 17 February 2004 Jose Varela and Ian Ramsay, SD/ESC

ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations Background The OCD Development Process The CONOPS Scenarios Use Cases

ACG Workshop, 17 Feb 2004 – OATA project OCD (ConOps) Vol. 2 OCD (The Vision) Vol. 1 Background

ACG Workshop, 17 Feb 2004 – OATA project OCD The Vision ConOps 2020 Issue 1 ConOps 2007 Issue 1 ConOps 2020 Issue 2 ConOps 2011 Issue 2 ConOps 2007 Issue 2 ConOps 2011 Issue n ConOps 2020 Issue... V1V2V3V4V5 V3V4V5 OI x validation lifecycle V1V2V3V4V5 OI x validation lifecycle ATM Strategy OATA 2011 ConOps 2020 Issue n ConOps 2011 Issue 1

ACG Workshop, 17 Feb 2004 – OATA project ConOps 2020 ConOps 2007 ConOps 2011 OATA OCD Vol. 2 (CONOPS) Concept of Operations (CONOPS)

ACG Workshop, 17 Feb 2004 – OATA project A detailed description of how an operational concept is applied. It identifies the functions and processes, and their corresponding interactions and information flows, concerned actors, their roles and responsibilities. Concept of Operations (Definition)

ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations 2011: Description of the ATM System in 2011 The Layered Planning Process The Actors The Actors Roles and Responsibilities The Scenarios The Use Cases The Impact Statements The Operational Improvements Introduction: Scope Need for Change Assumptions Concept of Operations (CONOPS)

ACG Workshop, 17 Feb 2004 – OATA project Description of the ATM System in 2011 Planned Route Structure User Preferred Trajectory Free Route Operations Harmonised Airspace Categories Dynamic Sectorisation Enhanced FUA Airspace 2011 Integrated AMAN/DMAN is used in some DMAN is used in many AMAN is used Standard MTCD is used Standard MONA is used Standard Initial CORA 2 is used in some Controller Tools 2011

ACG Workshop, 17 Feb 2004 – OATA project > 1 Year> 1 Week> 1 Day> 1 Hour ASM Airspace structure design & Modus Operandi ATFCM Optimised Capacity Management Daily Operations Plan Capacity Plans Aeronautical Information data Decision ~ RPL ATFCM FPL X Days before Operation CPL Decision Updated Airspace User Plan Tactical Flow & Capacity Management X Hours before EOBT or Operation X Months before Operation Actual Status Mil. ATSUs ACCs CP L Airspace User Plan Decision ASMASM / ATFCM Airspace re-allocation/Re-consider scenarios FPL re-processed FPL Airspace Users ~RPL IFPS FPL PLANNING ANTICIPATING REACTIN G EXECUTING ATC Update Current Flight Plan Airspace activation/de-activation Implement scenarios StrategicPre-TacticalTactical ATC Strategic Flow & Capacity Planning Airspace allocation Allocate (scenarios) OPERATION Airspace Users CDM AIRPORTS Layered Planning Process

ACG Workshop, 17 Feb 2004 – OATA project Aeronautical Information Data Scenario & Modus Operand i SectorsRoutesAreas Daily Operations Plan Forecast Demand Sectorisation Planning Traffic Demand ASM Military Operations Airspace Users Airspace Requirements Flight Requirements ~ RPL* Capacity Plans Data Forecast Traffic Demand Airspace Demand OrganisationManagement ACCs Military ATSUs ATS Air Traffic Demand CDM Airports CFMUFMPs ATFCM Strategic Flow & Capacity Planning Capacity Planning Sectorisation Planning Strategic

ACG Workshop, 17 Feb 2004 – OATA project 2011 Strategy ATM OCD (Vision) Volume 1 Operational Scenarios Use Cases 2020 Logical Architecture OCD (ConOps) Volume 2 OCD - OATA Relationship

ACG Workshop, 17 Feb 2004 – OATA project Flight Phases considered as described in the OCD

ACG Workshop, 17 Feb 2004 – OATA project Example of Actors Matrix for Planning and Execution of Flight Phases

ACG Workshop, 17 Feb 2004 – OATA project Example of Actors Matrix for En-route Scenario

ACG Workshop, 17 Feb 2004 – OATA project Scenario (Definition) Within the context of an operational concept, scenarios are a description of how a future system should work. Each scenario describes the behavior of Users and the future System, interaction between the two, and the wider context of use. From a detailed scenario a user should be able to identify user requirements and potential business cases.

ACG Workshop, 17 Feb 2004 – OATA project MTCD Sector A 245-UNL Sector A 245-UNL Sector B 245-UNL Sector B 245-UNL Sector C 245-UNL Sector C 245-UNL DLH0002 FL 270 cleared FL 350 Fix C1 Fix B1 Fix B3 Fix B2 Fix C2 IBE0001 FL 330 cruise JKK0003 FL 270 cruise MTCD R/T DLH0002 FL 350 cruise IBE0001 FL 330 cruise Sector A 245-UNL Sector A 245-UNL Sector B 245-UNL Sector B 245-UNL Sector C 245-UNL Sector C 245-UNL DLH0002 FL 270 cleared FL 350 Fix C1 Fix B1 Fix B3 Fix B2 Fix C2 IBE0001 FL 330 cruise JKK0003 FL 270 cruise DLH0002 FL 350 cruise IBE0001 FL 330 cruise FL 350 CFL = 320 FL Proposed Solution: Stop climb at FL 320. AFR0004 FL 320 cruise 10:28 10:24 10:25 10:29 FL :24 MTCD warning disappears 10:22 Ellbow Communication 10:24 No conflict with proposed solution 10:22 DLH 0002 Stop climb at FL :50 09:51 09:52 09:53 09:54 09:55 09:56 09:57 09:58 09:59 10:00 10:01 10:02 10:03 10:04 10:05 10:06 10:07 10:08 10:09 10:10 10:11 10:12 10:13 10:14 10:15 10:16 10:17 10:18 10:19 10:20 10:21 10:22 10:23 10:24 10:25 10:26 10:27 10:28 10:29 10:30

ACG Workshop, 17 Feb 2004 – OATA project A Use Case captures a contract between the stakeholders (actors) of a system about its behaviour. It describes the systems behaviour under various conditions as the system responds to a request from one of the stakeholders (the primary actor). The primary actor initiates an interaction with the system to accomplish some goal. The system responds protecting the interests of all stakeholders. Use Case (Definition)

ACG Workshop, 17 Feb 2004 – OATA project Content of a Use Case A formal and rigid template comprising: Scope Level Summary Actors Pre- and Post-conditions Notes Trigger Main flow Alternative and Failure flows

ACG Workshop, 17 Feb 2004 – OATA project Use Case Realisation

ACG Workshop, 17 Feb 2004 – OATA project European ATM Strategy Strategic Objectives: Safety; Capacity; Efficiency; Environment Airports Human Aspects; Procedures; Systems; Institutional Issues; Environment Business Impact Business Impact and Benefits Illustration

ACG Workshop, 17 Feb 2004 – OATA project Questions?