040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
High gradient studies in simple setups (for discussion) T. Higo.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Report from Nextef IWLC10, Genève, Oct. 20 T. Higo (KEK)
Working Group 1: Microwave Acceleration Summary 10 July 2009.
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
Design of Standing-Wave Accelerator Structure
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
Results from Nextef Observations in high gradient tests of CLIC Prototype Structures and associated study activities CLIC2013, CERN 29 January, 2013 T.
Accelerating structure test results and what’s next Walter Wuensch CTF3 collaboration meeting
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
An Overview of the CLIC Testing Program W. Wuensch CLIC ACE
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
Marc Ross The Normal-Conducting Linear Collider preparation - status and plans.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
The NLC RF Pulse Compression and High Power RF Transport Systems Sami G. Tantawi, G.Bowden, K.Fant, Z.D.Farkas, W.R.Fowkes J.Irwin, N.M.Kroll, Z.H.Li,
CLIC Accelerating Structure R&D Introduction W. Wuensch X-band workshop
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
W. Wuensch CLIC project meeting High-power rf structure testing.
Linear Collider For Japan-US HEP Program Committee April 2004 Nobu Toge (Accelerator Lab., KEK)
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
Cell to cell alignment on GLC structures 24 Nov. 2014, CERN Toshi Higo (KEK) 2014/11/23CLIC Structure Review1.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Detuning of T18 after high power test Jiaru Shi
Some information from Nextef For poster session in IWLC T. Higo.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Test Accelerating Structures Designs, Objectives and Critical Issues
Odu/slac rf-dipole prototype
Effort to identify the critical issues for high gradient
Chris Adolphsen Sergei Nagaitsev
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Review of rf structure test results
Disk-damped versus Quadrant-damped from engineering view point
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Progress in the design of a damped an
Advanced Research Electron Accelerator Laboratory
5th X-Band Structure Collaboration Meeting
T18_VG2.4_Disk_#2 processing summary
Presentation transcript:

040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK

040220LCPAC 2004 Structure (T. Higo)2 The most essential problem to be solved in accelerator structure Stable operation at a high field is described in ICFA International Linear Collider Technical Review Committee Second Report 2003 Ranking 1 (R1) : R&D items needed for feasibility demonstration of the machine For JLC-X/NLC, the validation of the presently achieved performance (gradient and trip rate) of low group velocity structures—but with an acceptable average iris radius, dipole detuning and manifolds for damping— constitutes the most critical Ranking 1 R&D issue. Tests of structures with these features are forseen in 2003.

040220LCPAC 2004 Structure (T. Higo)3 Practical R&D target Gradient much more than 65MV/m was already obtained in a detuned structure but with very small a/ and without slots and manifolds. Stable operation (namely 0.1BD / 60Hz X 1hr) at 65MV/m should be proved in a structure –with a/ as large as about 0.18 –with all slotted cells

040220LCPAC 2004 Structure (T. Higo)4 FY2003 Target items In collaboration with SLAC Prove the high field performance to meet ITRC R1 requirement Prove wake field control in 60cm high-power structures By KEK Invoke high field test of structure at KEK Fabricate actual-size structure in Japan

040220LCPAC 2004 Structure (T. Higo)5 Evolution from RDDS1 to H60VG4S17 Until m  0.9m 2  /3  5  /6 In m  0.6m a/ 0.18  0.17

040220LCPAC 2004 Structure (T. Higo)6 Structure parameter evolution in 2003 L s a/  v g /c P in E nl Structure m % MW MV/m Reduce structure length(1.8  0.9) for low vg (12%  5~3%) 2003 Feb (H90VG5N etc.) Reduce structure length, reduce power & pulse heating 2003 ~Spring: H60VG3S18 Reduce a/ for R sh up to reduce power & reduce upstream field 2003 ~Fall: H60VG4S17

040220LCPAC 2004 Structure (T. Higo)7 Parameter evolution in 60cm structures for further improving high-field performance VG3A18 ILT Round iris VG3S18 Elliptical iris VG3S17 Elliptical iris VG4S17 Elliptical iris Naming for example on H60VG4S17 H High phase advance structure (150deg/cell) 60 60cm long VG Group velocity at upstream side 4 Percent of light speed S With slots and manifolds 17 a/ = H60VG3S18 2.Iris round  elliptical 3.a/ 0.18  V g /c 3%  start at 4% 4  5

040220LCPAC 2004 Structure (T. Higo)8 FY2003 Actual activities Refinement and production of HDDS cells for structures tested at NLCTA –H60VG3S18 and H75VG4S18 –H60VG4S17-I, II and H60VG4S17-III –Prepare for H60VG4SL17-A,B Fabrication of 60cm structure in Japan Setup of GLCTA high power test area by ATF Establishment of calculation of cell frequencies Initialization of HDDS cell production studies by parties other than KEK

040220LCPAC 2004 Structure (T. Higo)9 High field test of 60cm structures For HDDS evaluation 4 -- H60VG3N-6C 4 -- H60VG3S H60VG4S17-I 5 -- H60VG4S17-III For fabrication by FNAL 4-- H60VG3R18(FXB) 5-- H60VG3S17(FXC) High power test all at NLCTA Structures are SLAC/KEK SLAC made FNAL made For early tasting of a/ =0.17 H60VG3R17 H60VG4R17 Keep close collaboration with FNAL structure group in addition to SLAC

040220LCPAC 2004 Structure (T. Higo)10 High field studies of 60cm 5  /6-mode structures in which KEK cells are/were used Structure code In Coupler Results or status 4 H60VG3N-6C ILT High power test finished 4 H60VG3S18 MC High power test finished H75VG4S18 MC Completed 5 H60VG4S17-I MC High power test finished 5 H60VG4S17-II WG Cells were produced 5 H60VG4S17-III(1) WG Under assembly 5 H60VG4S17-III(2) WG Cell under production H60VG4SL17 A,B WG For wake field control suspended Input coupler type: ILT=in line taper, MC=mode converter, WG=waveguide

040220LCPAC 2004 Structure (T. Higo)11 HDDS cell production

040220LCPAC 2004 Structure (T. Higo)12 Basic specification for HDDS cell We design the fabrication based on precision milling + diamond turning. Turning precision is specified as 2 microns in diameter. Dimensions among milled 3D geometries are within 10 microns.  Frequencies can be controlled within a few MHz, meeting dipole frequency tolerance of  ~5MHz Concentricity better than 5 microns  Alignment tolerance of several microns becomes feasible.

040220LCPAC 2004 Structure (T. Higo)13 Electric field / Magnetic field We need to avoid additional local field enhancement due to non-smoothness especially at red areas. Special care is taken at points (2,3,4) where smooth junction is difficult due to the junction between milling and turning E surface H surface   T pulse

040220LCPAC 2004 Structure (T. Higo)14 Ensuring junction between milling and turning connecting at a small angle Use of tapered milling tool Precise vertical positioning Checking profile by stylus Established cell fabrication technique based on precision milling + diamond turning Profile measurement Junction

040220LCPAC 2004 Structure (T. Higo)15 Burrs are safely removed SEM from C. Pearson (SLAC) Not easy for the machining to be completely free from burrs but they are in low field area so that they can be hand deburred.

040220LCPAC 2004 Structure (T. Higo)16 Scratches are smoothed by chemical etching process SEM from C. Pearson (SLAC) Present quality on surface scratches: Scratches are smoothed by etching process as shown left. This example is much larger than our acceptance level inspected with a low magnification optical microscope. After chemical etching As of machined

040220LCPAC 2004 Structure (T. Higo)17 Summary of breakdown rate of recent structures Following page shows plots of the breakdown rates of structures tested in 2003 as function of accelerator field. The performance near the nominal field of 65MV/m without beam loading was studied. The pulse length is 400ns flat pulse, except for the point indicated as “design pulse shape” where the ramping pulse shape needed for the beam loading compensation. Requirement of 0.1 breakdown per hour is equivalent to 1 breakdown in 2 million pulses at the present repetition rate of 60Hz.

040220LCPAC 2004 Structure (T. Higo)18 C. Adolphsen (SLAC) Jan Structure High Gradient Performance Summary (Breakdown Rate -vs- Unloaded Gradient with 400 ns Square Pulses)

040220LCPAC 2004 Structure (T. Higo)19 H60VG3S18 Processing history First full-HDDS cell structure

040220LCPAC 2004 Structure (T. Higo)20 H60VG3S18 BD position 65MV/m 70MV/m Breakdowns located mainly at upstream cells Data from C. Adolphsen SLAC

040220LCPAC 2004 Structure (T. Higo)21 Reduce surface field at upstream end a/ 0.18  0.17 and v g /c 3%  4% H60VG3S18 H60VG4S17 Increase Rs 59  61M  /m Reduce power 69  59MW Reduce magnetic field Reduce pulse temperature rise

040220LCPAC 2004 Structure (T. Higo)22 C. Adolphsen SLAC H60VG4S17 Process history Data from C. Adolphsen SLAC Eacc [MV/m]

040220LCPAC 2004 Structure (T. Higo)23 Pulse shapes for high power test at NLCTA Input power with ramp for Beam loading compensation Time (ns) Input power with flat pulse Time (ns) from C. Adolphsen SLAC Data from C. Adolphsen SLAC

040220LCPAC 2004 Structure (T. Higo)24 Dependence on input pulse shape Various pulse shapeRamped pulse shapeBack to flat 400ns BD rate significantly decreased with ramped pulse shape BD localized, BD position switched to another cell Many soft events, later than 100ns – similar to those due to pulse heating Need to study with a normal structure Data from C. Adolphsen SLAC

040220LCPAC 2004 Structure (T. Higo)25 C. Adolphsen (SLAC) Jan Structure High Gradient Performance Summary (Breakdown Rate -vs- Unloaded Gradient with 400 ns Square Pulses)

040220LCPAC 2004 Structure (T. Higo)26 High field test result summary Structure with present HDDS cells show similar performance to those of non-slotted structures. Low surface electric field at upstream cells seems effective to reduce BD rate. BD rate scales exponentially as accelerator field, roughly 5MV/m per decade. Pulse shaping for beam loading compensation is effective to reduce BD rate. Rates scatteres from structure-to-structure probably related to fabrication/installation processes. Ii is important to reproduce good ones by improving practical processes with more structures under the present structure design.

040220LCPAC 2004 Structure (T. Higo)27 Proof of wake field suppression Need to prove Wake field suppression by damped-detuned scheme  Frequency control Structure alignment based on HOM monitoring  Structure straightness and 3D geometry concentricity w.r.t. beam hole etc. The feasibility of wake field control was already proved in 1.8m structure. This was not in the high priority now and we suspended the wake- field program in After establishing high field performance, we should come back to this issue and actually prove in our latest structure design. But there are some related experiences acquired in HDDS cell production as shown in the following two pages.

040220LCPAC 2004 Structure (T. Higo)28 Frequency smoothness in H60VG4S17 production and feasibility to control F1 Std dev = ~0.5MHzStd dev = ~1MHz It seems that we have a feasibility to control within 1MHz sigma. To be confirmed in wake-field test structure.

040220LCPAC 2004 Structure (T. Higo)29 Fabrication of 60cm structure KX01 (H60VG3N) Diamond turning by an industry Chemical etching at KEK Diffusion bonding and brazing in hydrogen furnace at a company Vacuum baking in a klystron factory Now tuning and high-power test at KEK

040220LCPAC 2004 Structure (T. Higo)30 Actual-size structure fabrication Gain experience of fabrication of actual-size structure Study high-field performance at GLCTA Try to find a way to improve high-field performance through fabrication technology Made first 60cm HDS structure (KX01) with parameters H60VG3N and now under tuning

040220LCPAC 2004 Structure (T. Higo)31 GLCTA structure point of view Activities of 2003 –Moved high-field setup from AR-south to ATF area –Refurbished the system in control and data taking –Restarted high power study Goal of 2004 –Actually process structures to high field during long- term (>>100hours) –Breakdown related data are recorded and analyzed through operation –Various components will be developed and used, such as waveguide flanges, low-loss waveguides, RF load, etc.

040220LCPAC 2004 Structure (T. Higo)32 GLCTA at present Two klystrons are delivering ~60MW, 400ns to structure T53VG3F is sitting now Preparing control and measurement system Install KX01 soon SLAC helps such as acoustic meas.(now) low loss waveguides (in future) etc.

040220LCPAC 2004 Structure (T. Higo)33 Conclusion of 2003 structure development Established HDDS cell fabrication technique. Typically 60cm structures show BD rate at nominal field of 65MV/m within a factor of 5 or so w.r.t. the requirement. On the other hand, almost all structures met BD rate requirement at 60MV/m. We understand it is worthwhile to study the feasibility to start with a moderately low field operation. BD rate nearly met the requirement when operated with a pulse shape for beam-loading compensation. Prepared a high power test facility GLCTA.

040220LCPAC 2004 Structure (T. Higo)34 Developments in early 2004 Acquire more statistics with the present design (H60VG4S17) structures with SLAC to have a clear view of the present design. This process is pursued by applying any improvement of fabrication, installation and processing procedures. Develop and really make GLCTA serve as high field study facility.

040220LCPAC 2004 Structure (T. Higo)35 Developments in second half of 2004 Once foresee the establishment of high field performance, we discuss the next study items such as –Proving the wake field performance with SLAC in the present design structure. –Or going into studies on mass production of cells and structures. Otherwise, we focus on establishing good high field performance.