BNC Overview Ali Shakouri Director, Birck Nanotechnology Center January 16, 2013

Slides:



Advertisements
Similar presentations
By Stephen Hudson, M.Ed The Design and Technology Roosevelt High School North East ISD, San Antonio With Faculty Mentor Haiyan Wang, PhD Department.
Advertisements

Dry Etch and Thin films & Process Integration August 26, 2014 NNfC monthly admin committee meeting.
Dry Etch and Thin films & Process Integration Jan 6th, 2015 NNfC monthly admin committee meeting.
Birck Nanotechnology Center All-User Meeting January, 2013.
1 Uranium Oxide as a Highly Reflective Coating from 2.7 to 11.6 Nanometers William R. Evans, Richard L. Sandberg, David D. Allred*, Jed E. Johnson, R.
Angstrom Advanced Inc.. – 1056 Washington St., Canton, MA Tel. : Fax : Who we are: Angstrom.
John D. Williams, Wanjun Wang Dept. of Mechanical Engineering Louisiana State University 2508 CEBA Baton Rouge, LA Producing Ultra High Aspect Ratio.
INTEGRATED CIRCUITS Dr. Esam Yosry Lec. #6.
Optical Lithography Ghassan Malek Sr. Development Engineer October 6, 2010 Integrated Systems Nanofabrication Cleanroom.
1 Extreme Ultraviolet Polarimetry Utilizing Laser-Generated High- Order Harmonics N. Brimhall, M. Turner, N. Herrick, D. Allred, R. S. Turley, M. Ware,
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
ATI Cleanroom facilities Contact: T.E. Sale, Advanced Technology Institute, School of Electronics and Physical Sciences, University.
New Trends and Technologies for (N)MEMS
Presentation Outline Intro to Metamaterials Project Outline Recent Progress Recent Problems The Next Step.
Design and Implementation of VLSI Systems (EN1600) lecture04 Sherief Reda Division of Engineering, Brown University Spring 2008 [sources: Sedra/Prentice.
Process integration
Design and Implementation of VLSI Systems (EN0160) Sherief Reda Division of Engineering, Brown University Spring 2007 [sources: Sedra/Prentice Hall, Saint/McGrawHill,
Sample Devices for NAIL Thermal Imaging and Nanowire Projects Design and Fabrication Mead Mišić Selim Ünlü.
SOIMUMPs Process Flow Keith Miller Foundry Process Engineer.
The Deposition Process
YoHan Kim  Thin Film  Layer of material ranging from fractions of nanometer to several micro meters in thickness  Thin Film Process 
Thin Film Growth Applications -The Art of laying apples- ► Jarrod G Collins ► Klein Forest High School, Houston TX ► Klein ISD ► Faculty Mentor: Dr. Haiyan.
NIST Nanofabrication Facility. CNST Nanofab A state-of-the-art shared-use facility for the fabrication and measurement of nanostructures –19,000 sq ft.
Magnetic Nanofluidics ME342 Design Project Update 3 Abhishek Dhanda Kwan-Kyu Park Michael Pihulic Katherine Tsai July 27, 2006.
A.S. in Nanotechnology A new degree at Ivy Tech Community College.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
5x mixed with 25x Reduction 1.Draw mask, keeping 25x features within a 3mm square, within the traditional 14-15mm 5x die 2.When printing masks scale 25x.
McGill Nanotools Microfabrication Processes
Diliman – Katipunan “Silicon Alley” KATIPUNANAVEKATIPUNANAVE Ateneo de Manila University CP GARCIA AVE University of the Philippines ACADEMIC OVAL KEY.
Fabrication of Active Matrix (STEM) Detectors
반도체 제작 공정 재료공정실험실 동아대학교 신소재공학과 손 광 석 隨處作主立處開眞
Andrew Jacquier Brigham Young University
Integrated Circuit Devices Professor Ali Javey Summer 2009 Fabrication Technology.
Optical Constants of Uranium Nitride Thin Films in the EUV (7-15 nm) Marie K. Urry EUV Thin Film Group Brigham Young University.
Realization of an All-Dielectric Zero-Index Optical Metamaterial P. Moitra, Y. Yang, Z.Anderson, I.I.Kravchenko, D.B.Briggs, J.Valentine, Nature Photonics,
From Nano Structures to Quantum Information Processing: A Technology Incubator for the 21st Century MIKE LAZARIDIS Chancellor, UW and President and Co-CEO,
Chapter Extra-2 Micro-fabrication process
Virtual NanoFab A Silicon NanoFabrication Trainer
MST-11 Class 100/10,000 Cleanroom User Facility Catherine Mombourquette Brian Crone
Top Down Manufacturing
Modu-lab Low Cost Tools for High Tech Learning Electro-Mechanical Services, Inc. 109 Hermosa Dr. SE Albuquerque, NM Ph: Fx:
LITHOGRAPHY IN THE TOP-DOWN PROCESS - NEW CONCEPTS
PTC Proposal Seongjin Jang September 09, Submit Application To PTC All the users should submit their process-related information to Process Technology.
Top Down Method Etch Processes
University of Arkansas Fayetteville, Arkansas Plasma Diagnostics for the Deposition of Nanomaterials (Alumina) Jay Mehta Undergraduate.
IC Processing. Initial Steps: Forming an active region Si 3 N 4 is etched away using an F-plasma: Si3dN4 + 12F → 3SiF 4 + 2N 2 Or removed in hot.
Pran Mukherjee, Thomas H. Zurbuchen, L. Jay Guo, and Fred A. Herrero
The Birck Nanotechnology Center
Lithography in the Top Down Method New Concepts Lithography In the Top-Down Process New Concepts Learning Objectives –To identify issues in current photolithography.
MPRI Centralised Laboratories Gerrard Peters School of Physics 1.
Updates Support Survey (Jeff Goecker) Lab Staff updates (Jennifer Monahan) card reader defective BOE update (March) misc. facility info new equipment Birck.
LITHOGRAPHY IN THE TOP-DOWN PROCESS - BASICS
Atomic Layer Deposition for Microchannel Plate Fabrication at Argonne
Thin Film Deposition. Types of Thin Films Used in Semiconductor Processing Thermal Oxides Dielectric Layers Epitaxial Layers Polycrystalline Silicon Metal.
Bump Bonding Development
CORES Software User Training WVU Shared Research Facilities 2014 SRF CORES USER TRAINING
Process integration Wafer selection active role for the wafer ? passive role ? –thermal conductivity –optical transparency –flat,
RTDs: Resistance Temperature Detectors 1 Simone Traverso.
Saptarshi Das, PhD 2. Adjunct Birck Research Scholar Birck Nanotechnology Center Purdue University West Lafayette, Indiana Post-doctoral Research.
(860) | NATIONWIDE | 24/7 ON-SITE SERVICE EMERGENCY RESPONSE WITHIN 48 HRS New Vacuum Coating Equipment.
Process integration 2: double sided processing, design rules, measurements
CEITEC Nano Research Infrastructure
ALD Fiji for Conformality Test
Etching Processes for Microsystems Fabrication
Lithography.
Introduction Thin films of hydrogenated amorphous silicon (a-Si:H) are used widely in electronic, opto-electronic and photovoltaic devices such as thin.
E-beam Lithography for Optical Gratings and Waveguides
Chris Ober Director Don Tennant Director of Operations.
In Sutardja Dai Hall a Recharge Center of
Software description cosma pulse
Presentation transcript:

BNC Overview Ali Shakouri Director, Birck Nanotechnology Center January 16, 2013

2 Benchmarking and Recharge Analysis Ron Reger, Collin Steele, and Dave Lubelski

Birck has good total facility user base, but short of average in cleanroom Our external users are very low in both scenarios Our facility and tool use are both low compared to average Utilization PurdueAvg(6)MichHarvUMNPurdueAvg(5)MITUCSB Total # users Internal External (acad) External (other) # faculty groups Monthly users Total tool hours 42,39751,19663,90040,56617,200 19,14949,735N/A Internal 41,30745,30349,20031,41514,480 19,01439,787N/A External 1,0906,91514,7009,1512, ,948N/A Training hours 1,6243,1964,2005,8001,872 1,0361,848N/A 3 Cleanroom + External Lab Cleanroom only

Birck’s internal & external tool costs are competitive Tool Costs PurdueAvg(6)MichHarvUMNPurdueAvg(5)MITUCSB DRIE (e.g. STS) Internal (1 hr) $75$113$77$50$89 $75$82$128$35 Internal (16 hr, 4 entrances) $1,485$957$800$980$779 $1,485$1,007$510$560 E-beam Internal (1 hr) $140$141$114$48$155 $140$127$60$215 Internal (16 hr, 4 entrances) $1,405$1,367$768$948$971 $1,405$1,023$476$1,475 Contact Aligner (MA6) Internal (1 hr) $55$99$53$0$101 $55$58$51$35 Internal (16 hr, 4 entrances) $445$514$222$180$539 $445$406$408$35 Evap. 100nm Au Internal $175$160$114$100$162 $175$183$340$35 4 Cleanroom + External Lab Cleanroom only

Recharge Rates (Starting July 2013) – Rates haven’t been increased for over 3 years (inflation ~7-8%, salaries/benefit gone up), so we propose to increase Scifres and general lab equipment rates by 5% – We will move to a daily rate for Scifres, capped for the entire month after 8 days of entry ($40/day, capped at $320/month) 5

6 Fiji Atomic Layer Deposition Cleanroom Aluminum Oxide and Hafnium Oxide; ~ 1 Å/cycle Thermal & plasma capability Capable of alternate precursors, subject to approval EasyTube 3000 Lab 2221 Graphene CVD Single and multi-layer deposition Thermal and plasma capability New materials, subject to approval MA24 Aligner Cleanroom Refurbished and installed Start-up in February Front and backside alignment New Equipment

7 Heidelberg Direct Laser Writer Cleanroom Laser lithography 1  m, (future upgrade 0.6  m) Mask making and direct write Arrived, to be installed Nikon Microscopes Cleanroom Expensive parts: lenses, filters Training needed Lamps left on Filters removed and lost/broken STS ASE Cleanroom Back-up DRIE silicon etcher Bosch deep etch process Installation Spring 2013 New Equipment

8 Raman Lab 1227 Horiba LabRam Wavelengths 633 & 532 nm Manual sample stage Spectro- scopic Ellipsometer Lab 1263 Thin film characterization Multiple wavelengths & angles VASE: Variable Angle Spectroscopic Ellipsometry PVD Sputtering Cleanroom New, 2” targets Installation spring 2013 RF & DC capability Au and many other materials New Equipment

9 New Laboratories at BNC Total new laboratory space: 6,648 ft 2 John Weaver and Mark Voorhis

10 Areas Affected – Cleanroom 10

11 Areas Affected – First Floor

BNC Community Birck Coffee Hour (Fridays 3:30-4:30pm) Learn about recent advances in nanotechnology (BNC Seminars and Journal Club) New Center Initiatives Nano-Manufacturing In-vivo, in-vitro devices Electro thermal/ Power devices Imaging Nano Education (REU site) Topological materials/Solar Discovery to commercialization Always interested in new ideas: contact: