The University of Greenwich Teaching excellence for 100 years Is new nuclear build justified? Press Conference on the need for an Independent Inquiry March.

Slides:



Advertisements
Similar presentations
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Advertisements

Is a single European energy market possible? Steve Thomas Professor of Energy Policy and Director of Research PSIRU (
1 Capacity mechanisms - IFIEC position June 12 th 2012.
New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.
The University of Greenwich Teaching excellence for 100 years The Economics of Nuclear Power Myths of nuclear power: A guide Moscow 5 April 2011 Steve.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
UK Nuclear Policy Andrew Beirne
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
Darden School Social Responsibility and Entrepreneurship April 2, 2007 Recycling Energy: Profitably Mitigating Climate Change Tom Casten Chair, Recycled.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
1. What Do We Know About Our Energy and Climate Policy? John W. Rowe Chairman and CEO, Exelon Corporation Grand Challenges of the 21 st Century Conference.
E3G - Third Generation Environmentalism 1 Decarbonising the European power sector: Is there a role for the EU ETS? European Parliament, 31 May, 2011 Sanjeev.
What is killing the Nuclear Renaissance? Presentation at 10th IAEE European Conference Vienna, September 7-10, 2009 Steve Thomas
Slide 1 Policy Alternatives to Stimulate Private Sector Investment in Domestic Alternative Fuels Wally Tyner with assistance from Dileep Birur, Justin.
Chapter 11.1 Saving and Investing
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Dr Marek Porzycki Chair for Economic Policy.  Euro area quantitative easing – ECB announcement of an expanded asset purchase programme, 22 January 2015.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
CHAPTER 8.  Import tariffs  Export subsidies  Import quotas  Voluntary export restraints (VER)  Local content requirements Copyright © 2009 Pearson.
 400 new jobs  300% >90% ROI Greener  40MW SSE Ireland Better Energy Supply 600,000 gas and electricity customers Sustainability Making energy better.
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Electricity Supply in the New Century Dr Malcolm Kennedy Chairman PB Power Ltd including the power businesses of Merz and McLellan and Kennedy & Donkin.
Financing New Nuclear: The Government’s Role in the Nuclear Renaissance John Hanson The Ohio State University American Nuclear Society, WISE Intern August.
Electric Restructuring In Pennsylvania Sonny Popowsky Pennsylvania Consumer Advocate May 10, 2007 Institute for Regulatory Policy Studies Transforming.
NUCLEAR POWER PLANT FINANCING IAEA - Infrastructure Technical Meeting Vienna, November 2007 Fanny Bazile Forecast Director Nuclear Energy Division.
The University of Greenwich Teaching excellence for 100 years A comparison of the Hinkley Point and Paks projects March 2015 Steve Thomas
GB Electricity Market Reform: The implementation challenges ahead IAEE International Conference Stockholm, June 20 – Dorcas Batstone
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Managed by UT-Battelle for the Department of Energy THE IMPACT OF A CARBON CONTROL PROGRAM ON LOW-INCOME CONSUMERS Joel Eisenberg ORNL
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 5 Energy Regulation Module 5: STRUCTURE, COMPOSITION AND ROLE OF AN ENERGY REGULATOR.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Michael R. Walker Research Director IGCC Financing Project Kennedy School of Government, Harvard University PH: , FX:
Designing Utility Regulation to Promote Investment in Cost-Effective Energy Efficiency Dale S. Bryk Natural Resources Defense Council Pennsylvania.
Economics of electricity production and competitiveness of nuclear energy Prof. Dr.-Ing. Alfred Voß Institute of Energy Economics and the Rational Use.
Low Energy Contemporary Lighting Solutions The Need for Financially Viable Low Energy Lighting Solutions Low Energy Lighting Limited
Nuclear power: A cheap option? Westminster Keynote Seminar October 19 th 2009, Portcullis House Steve Thomas PSIRU (
ENERGY FOR THE 21 ST CENTURY the Potential for Nuclear Power Luis Echávarri Director-General, OECD Nuclear Energy Agency IAEA Scientific Forum at the General.
IFIEC Europe International Federation of Industrial Energy Consumers 1 Promotion of Renewable Energies in the EU Member States Consequences on the Price.
Analyzing Financial Statements
Entrepreneurship Business Plan Utilizing Financial Documents.
Principles of Working Capital Management
The Energy Package:– The New Regulatory Framework for Europe International Energy Conference, 12 March 2008 David Halldearn Senior Advisor European Affairs.
Sussex Energy Group SPRU - Science and Technology Policy Research The Economics of New Nuclear Build Presentation at the Nuclear Consultation Group Westminster.
Extra electricity slides
CAFE Baseline dissemination workshop 27/09/2004 Dr. Leonidas Mantzos E3M-LAB/ICCS NTUA contact: Energy projections as input to the.
Redefining the housing sector December 2011 Kathy Hanson Head of Learning.
Budget Presentation 2010/2011 – 2013/2014 All Communities 28 January 2010.
Update on the status of the UK nuclear power programme Presentation to INRAG 27 February 2016, Vienna Steve Thomas Professor.
Ratio Analysis…. Types of ratios…  Performance Ratios: Return on capital employed. (Income Statement and Balance Sheet) Gross profit margin (Income Statement)
Electricity Market Game Review 13ELP044&644 CREST, Loughborough University.
Renewables in the UK 21 st March 2016 Nikki Brain and Ben Pearce, Power Up North London.
Consumer Economics Credit Credit Investing Investing.
Trading Futures proposals for emissions trading in the UK Chris Hewett Research Fellow Institute for Public Policy Research.
UCL ENERGY INSTITUTE UK Energy Policy: Late Lessons from Fukushima Westminster, Dr Paul Dorfman.
Nuclear Power Economics and Project Structuring 2017 Edition
The cost of nuclear power plants l
Green taxes: a critique
Lauri Myllyvirta energy campaigner (Finland)
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
NS4960 Spring Term 2018 Nuclear Rebound?
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
Generation Expansion Daniel Kirschen
Time to cancel Hinkley Point C
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Wind Development & Policy Options
Presentation transcript:

the University of Greenwich Teaching excellence for 100 years Is new nuclear build justified? Press Conference on the need for an Independent Inquiry March 11 th 2010, Westminster Steve Thomas PSIRU ( Business Schoolwww.psiru.org University of Greenwich

the University of Greenwich Teaching excellence for 100 years National policy statement on nuclear  Nuclear would yield economic benefits to the UK in terms of reduced carbon emissions and improved security of supply  the White Paper concluded that nuclear power was likely to be an attractive economic proposition to them [investors]  Committee on Climate Change: Nuclear power is competitive with both coal and gas-fired generation in the central fossil fuel price scenario even without a carbon price. Under the high and high-high fuel price scenarios, nuclear is a clearly lower cost solution  The Secretary of State is satisfied that nuclear is a low- cost form of electricity generation which can yield economic benefits to the UK.  the risk of economic detriment is very remote

the University of Greenwich Teaching excellence for 100 years Issues arising  Is the government’s rosy view of nuclear economics justified?  Is the government’s claim plants can be built without subsidies and guarantees credible?  If nuclear orders are not placed, what will government do?  If things go wrong, who will pay?

the University of Greenwich Teaching excellence for 100 years What do companies care about?  Construction cost & time, cost of borrowing, reliability, electricity price  Repaying construction cost & interest accounts for 70% of the cost of power. Cheap loans & low capital cost essential  Reliability. The reliability, how many kWh of power it produces, determines how thinly fixed costs can be spread  A power sale price insulated from market risk is important

the University of Greenwich Teaching excellence for 100 years Construction costs  10 years ago industry forecast cost $1000/kW. Cost of 1600MW plant like EPR $1.6bn  2004: Olkiluoto ~$3000/kW  2007/08: US utility estimates ca $5000/kW  2008/09: Areva/Westinghouse bids for Ontario, S Africa, UAE >$6000/kW  2008 White Paper & NPS assume £1250/kW or $2000/kW  In 2008, E.ON said cost 70% higher than government  Estimates before construction always under-estimate  Why does government assume vendors will sell to UK at 40% of price charged elsewhere?

the University of Greenwich Teaching excellence for 100 years Cost of borrowing  If consumers always pay for errors, risk to banks low so cost of borrowing low - ~5% real  If electricity market competitive, extra costs not passed on, they come from profits  Investment analysts, credit rating agencies may penalise companies that try to build nuclear because of this risk  Government credit guarantees protect banks: if project fails, taxpayers pay the bill  US programme to build 15 nuclear plants needs ca $100bn loan guarantees (80% cost coverage)  First loan guarantees granted Feb US$8.33bn for only two plants

the University of Greenwich Teaching excellence for 100 years Olkiluoto and Flamanville  Olkiluto cost: €3bn ($2800/kW) fixed price contract  €1.95bn provided by loan at 2.6% interest. Export credit guarantee provided by French & Swedish governments  Plant build to take 4 years, but after 4 years, 4 years late  Costs at least 75% over contract price. Who pays?  Fixed price contract in dispute: TVO suing Areva for €1.4bn, Areva suing TVO for €2bn  EDF has built three times as many nuclear plants as any other utility (~60)  After a year, Flamanville, >20% over budget. After 2 years, construction at least 2 years late  Regulators in UK, Finland & France threatening not to license if design issues not sorted

the University of Greenwich Teaching excellence for 100 years Are subsidies needed?  NPS: it will be for companies to fund & build any new nuclear power stations. There will be no burden on the tax payer  To the extent that the electricity market is competitive and the economic cost of the class or type of practice is lower than for alternative electricity generating technologies, consumers can also expect to benefit on average via downward pressure on energy prices.

the University of Greenwich Teaching excellence for 100 years Are subsidies needed?  Ofgem wants to abandon the wholesale market in favour of a more planned approach  Ed Miliband 2/2010: ‘We are going to need a more interventionist energy policy, ‘[we need] capacity payments to guarantee returns to developers of low-carbon sources of power’ & ‘The idea of such payments is to give greater certainty to investors in renewable and nuclear energy.’  David Kidney 3/2010: UK government announcing measures to ‘drive up’ price of carbon  Proposals to be published April in ‘Roadmap to 2050’,  EDF: a minimum floor price for carbon permits under the European cap-and-trade system is a prerequisite before investors will consider building nuclear plants in the UK

the University of Greenwich Teaching excellence for 100 years If no orders, what does government do?  NPS: [Investors will decide if] the financing characteristics of nuclear power provided sufficiently attractive returns. Investment decisions remain for companies to take  But  NPS: New nuclear power should be free to contribute as much as possible towards meeting the need for 25GW of new non-renewable capacity. The Government expects that a significant proportion will be filled by nuclear power  NAO: EDF has a central position in new nuclear in the UK and a potentially significant influence over Government's aims for the construction of new nuclear power stations. [DECC must have] contingency plans should EDF be unwilling to build new nuclear power stations."

the University of Greenwich Teaching excellence for 100 years If things go wrong, who pays?  Taxpayers are always the last recourse if things go wrong  British Energy was privatised but rescued at a cost to future taxpayers of more than £10bn when it went bankrupt  Electricity consumers contributed for 25 years for decommissioning. In 2003, found to be no money. Future taxpayers now face a bill of £80bn and rising  Taxpayers always pay to clear up after accidents

the University of Greenwich Teaching excellence for 100 years Conclusions  Nuclear cost assumptions behind the White Paper and the NPS are gross under-estimates  More realistic assumptions on construction cost and cost of borrowing would triple the expected kWh cost  If there are no subsidies and guarantees, nuclear is not financeable. Already signs of government pledge on subsidies weakening  If companies are unwilling to build without subsidies, government may be forced to give in  Taxpayers are always the last recourse if things go wrong with nuclear