Proprietary and Confidential to Rogers and Accenture 1 Fiber Plant Construction British Columbia Dynamic RFQ Information Session.

Slides:



Advertisements
Similar presentations
Welcome to Sourcing 3.0 Training!
Advertisements

Welcome to the Online Employment Applicant Tutorial Click here for next screen.
©2010 AECsoft USA Confidential External User Guide AECsoft USA, Inc Yorktown, Suite 435 Houston TX ©2010 AECsoft USA Confidential.
© 2007 Pantavanij Co., Ltd. All Rights Reserved Total Procurement Solution Presentation Online Auction (Sealed Auction)
WASTE MANAGEMENT ©2010 SciQuest USA Confidential 1 Powered by RFx User Guide.
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
1 Vendor ITB - Sourcing User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
All you need to know about Western Power’s Ariba e-Procurement System
1 Unit & District Tools Phase 1. 2 To access the new Unit and District Tools, you will need to click on the link embedded in the MyScouting Flash page.
The Applicant Perspective
SIS – NBS Online Specimen Tracking System Training
Do not put content within the brand signature/footer area Typeface: Arial Heading: 40pt white Subtitle: 20pt white Image height: 5.5cm Image widths: 8.00cm.
Open Internet Explorer, enter the website to get registered as a Supplier.
GSA eBuy Seller’s Tutorial
This basic tutorial will take vendors step by step through the RFQ process. The tutorial will also point out many of the exciting new.
Copyright Autoliv Inc., All Rights Reserved AEU Ariba Direct Material Suppliers training Offline version May 2011.
Procurement Card Training Strategic Account Management (SAM)
DuPont E-Sourcing Supplier Participation January 2012.
Oracle Sourcing Quick Start Guide.
Oracle Method | Group Delivery Together. Free your energies New Supplier Registration.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
Lawson System Foundation 9.0
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
11-01: Get Started with SCP Supply Chain Platform Training Presentation Updated April 2009.
1 Vendor ITB - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
School Forms for the Common Application Online.
National Transit Database Pilot Training Guide. 2 Pilot Guideline – Enter 2013 Report Year “Original Submission” Data Goal: Report year 2013 Close out.
Lead Management Tool Partner User Guide March 15, 2013
© 2011 BravoSolution - All rights Reserved Warwickshire County Council eAuction (Bus Operator Briefing) January 2012 eAuction January 2012.
1 July 11, 2013 © 2013 SIPX, Inc. Confidential SIPX Processes for Instructors Presented by Mary-Lynn Bragg July 2013.
Introducing the Common App Online For First-Year Admission Last updated:
Sourcing Event Guide Updated September 12, 2011 Sourcing Event Guide.
ESource Help and Step-by-Step Instructions for Honeywell Suppliers.
MyFloridaMarketPlace MyFloridaMarketPlace Vendor Teleconference Series July 9, 2008: “Solicitations” 12:00 noon – 1:00 p.m. EDT The toll free number is:
Open Internet Explorer, enter the website to get registered as a Supplier.
2013 Quality Systems Assessment Using the web-based self assessment application.
DuPont E-Sourcing Supplier Participation - RFX January 2012.
NYS Division of Homeland Security And Emergency Services (DHSES) E-Grants Tutorial Creating an Application for the EOC RFP To access DHSES E-Grants you.
How to Use GPS to Fill Out a Bid Document February 2007.
All you need to know about Western Power’s Ariba e-Procurement System
Public Purchase Vendor Registration & Responding to a Bid Copyright © The Public Group, LLC - This document is confidential and intended only for the use.
Contract Invoice Guide
1 ARRA Recipient Reporting FederalReporting.gov Briefing In-Bound Recipient Reporting April Reporting Cycle Enhancements March 30, 2010.
Submit a Response - Non Construction (First Time - No Addenda)
Proprietary + Confidential1 Supplier iPPAP Training.
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
Sourcing Event Tool Kit Matrix Pricing & Tiered Pricing User Guide
Supplier Performance Management (SPM): Responding to a Survey
Supplier Sourcing Guide
Bulk Fuel,Gasoline and Diesel Event User Guide
ERO Portal Overview & CFR Tool Training
Journal of Mountain Science
Welcome to the Cox Machine VIP Portal! cmivendorportal.com
Rogers Sourcing Supplier Login Process
I-Supplier Training Guide
Rogers Sourcing Supplier Login Process For Returning Users
Battelle Supplier Onboarding
Battelle Supplier Onboarding
Rogers Auctions Supplier Login Process
Vendor ITB - Event User Guide
Vendor Portal Registration Procedures
Responding to a Rogers Sourcing Event STEP Table of Contents Page
Welcome to WebEx Thanks to the NHS Institute for Innovation & Improvement for their contribution to this document.
Auctions 101 March 2019.
CFR Enhancement Session
GSA eBuy Seller’s Tutorial
Presentation transcript:

Proprietary and Confidential to Rogers and Accenture 1 Fiber Plant Construction British Columbia Dynamic RFQ Information Session

Proprietary and Confidential to Rogers and Accenture 22 Agenda  Introduction  Scope  Timeline  Dynamic RFQ Training  Dynamic RFQ Event Rules  Q & A

Proprietary and Confidential to Rogers and Accenture 33 Introduction Agenda ItemSpeakerTime IntroductionsEmil Thorose5 minutes ScopeWil Donovan5 minutes TimelineEmil Thorose5 minutes Award DecisionsEmil Thorose5 minutes Dynamic RFQ TrainingCam Patterson30 minutes Dynamic RFQ Event RulesCam Patterson5 minutes Q & A Cam Patterson / Emil Thorose 10 minutes

Proprietary and Confidential to Rogers and Accenture 44 Scope  British Columbia Regional Fiber Construction −2011 Forecast is at $16 M −Suppliers will be charging task code rates for projects less than $30K −This Dynamic RFQ is only for projects $30K and up: Project Tiers Projected Spend # of Projects**Incremental Discount $0K - $30K$ 0.39 M34 Projects executed with Task Code rates $30K - $60K$ 1.97 M43 $60K - $100K$ 2.71 M37 $100K +$ 10.94M46 $ M160 * All the projects less than $30 k will be executed under agreed upon task code prices

Proprietary and Confidential to Rogers and Accenture 55 A quick overview of the Scope of our Fiber Construction Projects  Fiber Construction Projects consist of construction only (permits, route selection, design, engineering are excluded in scope) −Our project volumes have increased by 6 times compared to last year −These projects, on an average, equal 2kms and are located in Vancouver, North Van, Richmond, Burnaby, Surrey and surrounding areas −Types of projects include Access, Backbone, NNI, Business or Commercial fiber builds 60% aerial (overlash or new strand) and 40% buried Some require Civil builds and others leverage 3 rd Party support structures −All 2011 projects are expected to be completed in 2011 −50% of the projects complete within 2 months of the year i.e. June/July or Sept/Oct and the remainder throughout the year

Proprietary and Confidential to Rogers and Accenture 66 Timeline 1.Online Bidding Event Training – May 4 th, 2011 (3pm EDT) 2.Pre-bidding Begins – May 4 th, 2011 (4pm EDT) 3.Pre-bidding closes – May 9 th, 2011 (3pm EDT) 4.Online Bidding Event – May 10 th, 2011 (3pm EDT) – British Columbia Region

Proprietary and Confidential to Rogers and Accenture 77 Award Decisions In the BC area, we believe we can deliver our business needs over the next few years with 4 primes. In exchange for providing us with attractive discounts during this event, we are prepared to provide additional volumes to the top ranked vendors. Our goal is to use the following allocation model across our chosen primes in BC: 1 st Place : 45% volume 2 nd Place : 30% volume 3 rd Place : 15% volume 4 th Place : 10% volume % Caveats:  Any new vendor will be brought in under pilot mode for the first 3 months, before being ramped up to the volume allocation committed.  Rogers Communication reserves the right to remove prime status from vendors under the following scenarios: -Undue delays in project timelines -Work quality not meeting Rogers standards -Undue cost over runs -Excessive change order

Proprietary and Confidential to Rogers and Accenture 88 The Invitation Invitation includes: 1)Your user name or ID 2)Hyperlink to access the website for bidding (just click on it to proceed) 3)Help Desk phone #

Proprietary and Confidential to Rogers and Accenture 99 Login 1)Enter your user name 2)Enter your password

Proprietary and Confidential to Rogers and Accenture 10 Creating a Password Create a permanent password

Proprietary and Confidential to Rogers and Accenture 11 Accept Terms and Agreement Ariba Terms & Conditions for use of the site must be accepted

Proprietary and Confidential to Rogers and Accenture 12 Create Personal Profile Create your personal Profile

Proprietary and Confidential to Rogers and Accenture 13 Open the Event 1)Find the online event in OPEN or PREVIEW status 2)Click to open

Proprietary and Confidential to Rogers and Accenture 14 Review Prerequisites 1)Click to proceed with answering required Pre- Bid questions

Proprietary and Confidential to Rogers and Accenture 15 Submit All 3 Prerequisites You must : 1)Accept the agreement 2)Agree to the process 3)Download then upload a revised Capability worksheet.

Proprietary and Confidential to Rogers and Accenture 16 Accept Rogers Online NDA Accept the online Rogers NDA

Proprietary and Confidential to Rogers and Accenture 17 Select Lots Before entering your opening bids, please select the appropriate lot you will be bidding for

Proprietary and Confidential to Rogers and Accenture 18 Phase 1 – Pre Bid : Enter Opening Bids (1 of 3) 1)Read each section of the event carefully 2)Enter your bids (discount percents) for the three highest $ groupings of projects

Proprietary and Confidential to Rogers and Accenture 19 Phase 1 – Pre Bid : Enter Opening Bids (2 of 3) 1)Click the link to download a file 2)Click update file to upload into the tool 3)Help is on every page!

Proprietary and Confidential to Rogers and Accenture 20 Phase 1 – Pre Bid : Enter Opening Bids (3 of 3) 1)Need to talk with Rogers? Compose a message online 2)Save every 10 minutes or when you set away 3)Submit when ready, you can do revision.

Proprietary and Confidential to Rogers and Accenture 21 Revising your Pre-Bid 1)Your Pre-Bid has been submitted 2)Click Revise to make changes

Proprietary and Confidential to Rogers and Accenture 22 Login For Event Day 1)Enter your user name 2)Enter your password

Proprietary and Confidential to Rogers and Accenture 23 Event Day Screen Layout You must : 1)Enter Discount % 2)Update Total (optional) 3)Submit Current Lot to send bid to Rogers 4)Click on All Content to review other sections of this event.

Proprietary and Confidential to Rogers and Accenture 24 Phase 2 – Online Event: Enter Bids (1 of 4) You must : 1)Enter a Discount % in Line 1 – 2 – 3 2)Click Update Totals to see Extended Price 3)Click Submit Current Bid to send to Rogers (click OK if asked) 4)Review other parts of the event

Proprietary and Confidential to Rogers and Accenture 25 Phase 2 – Online Event: Enter Bids (2 of 4) You must : 1)After you click Submit Current Lot, you must SUBMIT for Rogers to receive the event

Proprietary and Confidential to Rogers and Accenture 26 Phase 2 – Online Event: Enter Bids (3 of 4) You must : 1)After you click Submit Current Lot, you must SUBMIT for Rogers to receive the event

Proprietary and Confidential to Rogers and Accenture 27 Phase 2 – Online Event: Enter Bids (4 of 4) If a bid is submitted within the last 3 minutes, the time will be extended an additional 3 minutes

Proprietary and Confidential to Rogers and Accenture 28 Repeat Bid if Applicable You can submit bids as many times as you want before the time runs out, and see how your rankings change

Proprietary and Confidential to Rogers and Accenture 29 Bid Increment Error To fix an increment error: 1)Your new bid must be at least 0.25% less than you previous bid on the overall spend 2)Actual increment changes with every bid

Proprietary and Confidential to Rogers and Accenture 30 Alternate Bidding Submission: Increment Selected Items (1 of 3) To fix an increment error: 1)Your new bid must be at least 0.25% less than you previous bid on the overall spend. 2)Actual increment changes with every bid

Proprietary and Confidential to Rogers and Accenture 31 Alternate Bidding Submission: Increment Selected Items (2 of 3) To Bid a % Increment: 1)Mark the Lines you want to bid 2)Enter the Increment % and click Apply 3)Submit Current Lot

Proprietary and Confidential to Rogers and Accenture 32 Alternate Bidding Submission: Increment Selected Items (3 of 3) To Bid a % Increment: 1)Click OK to actually submit to Rogers

Proprietary and Confidential to Rogers and Accenture 33 Compose Message (1 of 2) Need to communicate with Rogers? Click the Compose a Message button

Proprietary and Confidential to Rogers and Accenture 34 Compose Message (2 of 2) Type your message or attach a file, then click Send Type your message here.

Proprietary and Confidential to Rogers and Accenture 35 End of Bidding The online event is complete: 1)All participating suppliers must send a screen- shot of this page to the Rogers contact to confirm final bids. 2)Rogers will contact selected suppliers to finalize Awards.

Proprietary and Confidential to Rogers and Accenture 36 Review Period The event will go into Review mode once bidding ends

Proprietary and Confidential to Rogers and Accenture 37 Contact Info Problems? Call Rogers or Help Desk

Proprietary and Confidential to Rogers and Accenture 38 Dynamic RFQ Execution Rules ParameterValuesStrategy and Potential Options Dynamic RFQ TypeRank Rank – Participants see their current rank Duration30 minutes Event will be executed for 30 minutes Auto-Extension period3 minutes Auto-extension period is set to allow that any additional movement is allowed to take place by extending Dynamic RFQ timing (prevents last second movement without other suppliers being able to react) This extends the overall Dynamic RFQ length each time each time a trigger occurs Grace period for Auto-extension (Period in which extension are triggered) 3 minutes For bids placed near the end of the Dynamic RFQ, the extension period will apply Trigger for Auto-ExtensionMultiple Any Bid within the grace period Movement within top 4 participants Bid increments amounts (or percentage) 0.25% The minimum increment that is needed to be placed for successful increments

Proprietary and Confidential to Rogers and Accenture 39 Questions and Answers