MICE CMPB Alain Blondel 1 August 2007 1 spokesperson remarks CMPB MICE NEWS.

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

MICE VC Alain Blondel 2 August Summary of the MICO meeting 26 July 2007 Overview TargetTarget (CB) Beam line engineering & installationBeam line.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 MICE phase I - Project Status Richard Apsimon (Project Manager) & Andy Nichols (Technical Coordinator) … with considerable help from Ken Long! MICE Video.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
CMPB Alain Blondel 14 April STATUS OF MICE.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
Project report. Status: MICE Muon Beam Target: –Target presently installed ‘in-operative’: Optical connections removed (why?) –Implies realignment/set-up.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
Chris Booth Sheffield 29th March 2006
Target Installation Plan
MICE Target Report Video Conference 29/11/07
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

MICE CMPB Alain Blondel 1 August spokesperson remarks CMPB MICE NEWS

MICE CMPB Alain Blondel 1 August MAIN MESSAGES MICE is recovering from the major hickup (Project manager resignation) and associated collateral dammages (PSI solenoid, lapses of communication, delays in refurbishment of quads etc...) thanks to the dedication of many MICE and Ken Long and Chris Nelson in particular. -- Priority #1 is to ensure that full beam line is ready for step I data taking at the end of the christmas shutdown (20 January) -- It appears desirable and possible (though not certain at the moment) that beam provided by a simplified version of the beam line (target, Q1-Q3, B1, B2) could be operational in November together with a good fraction of detectors (CKOV, TOF, perhaps even the tracker) taking advantage of ISIS developments breaks in septembre and maintenance break on 4-8 November. -- this is a natural step in the debugging of the beam line and would allow major test of the part of the beam line that is installed in the ISIS vault (--> possible fixes in the Xmas shut down) -- calibration of pions/ISIS irradiation, a major unknown at the moment. -- shake-down of the detectors and DAQ, installation in the control room -- generally keeps the momentum rolling and avoids work pilup in february Meanwhile detectors will be integrated with Cosmics in R12 mezzanine Uncertainties concern target, PSI solenoid, controls and Hall installation; The rest of MICE is on schedule -->

MICE CMPB Alain Blondel 1 August FURTHER NEWS 1.Since March 25, Malcolm Ellis is keeping a MICE NEWS page. 2.MICE Installations/commissionning/operations group MICO is now operational. (last meeting on 26 July) 3. MICE is now an INFN recognized NTA (New Technologies for Accelerators) project: travel money from INFN and funds awarded by RAL end of year budget can be used. 4. EUROnu Design study proposal is very well ranked. 5. preparations for accelerator IA EU-proposal are underway with, for MICE -- access program to -- training program (students and postdocs???) -- work packages on RF cavities surface studies (R. Saviour at Liverpool), and 200 MHz power source (Montesinos at CERN)

MICE CMPB Alain Blondel 1 August Target (Sheffield; C. Booth and P. Smith) Target functioning reliably – 3.7 M actuations over 12 weeks. this is about what we expect from >1 year of operation of MICE Bearing wear considerably reduced with use of leaded bronze further studies to be done with Diamond-like Carbon aim to install in early november

MICE CMPB Alain Blondel 1 August Leaded bronze bearings after 1.5 M pulses <-- Brass bearing after x pulses

MICE CMPB Alain Blondel 1 August Dust at bottom of housing (after 1.5 M operations) Expect <1% of this to fall in ISIS vacuum pipe Is this acceptable to ISIS? proposal will be discussed with Steve Pin, writen up and sent to David Findlay for approval. Alternative – DLC (Diamond-like carbon) coated shaft & bearings received new shafts from Oxford. Will send off shaft & bearings for commercial coating Test will take at least 3 weeks (2 M pulses) once received. ready in october?

MICE CMPB Alain Blondel 1 August Tracker -- 9 tracker stations have been completed by now. (5 for one tracker) Still a few problems with the light validation bench. No dead channels seen and a few only have apparently a little less light. Main and urgent issues the need for specification of path of the low voltage cables and need to define the fire alarm system to have permission take the spares from D0. Fermilab will go ahead with a design using the VESDA system. Spectrometer solenoid on track and progressing well (See M. Zisman's talk) EXPECTED delivery of solenoid I at FNAL end december 2007 and at RAL 2 month later (late february) after magnetic measurements. ==> start step II in April. NB these are typical technical coordinator actions we stumble on those at the moment

MICE CMPB Alain Blondel 1 August PSI solenoid successful repair with help of Walter Gloor one of the tie-rods to the cold mass had also fallen off. Magnet is actually in good condition. Plan is to finish off repairs at front of solenoid, MLI insulation and replace the cover. Next is cold test and Linde refrigerator will be needed, but there is a legal issue as the certification of the whole assembly by Linde is missing (not just parts). next is collecting cold box etc... timescale is September mid October the latest. The position in the hall for cold testing is on the south side of the hall It does not interfere with possible test or installation of detectors on the beam line. Action keep pushing for the Linde contract to be signed. (Tom Bradshaw)

MICE CMPB Alain Blondel 1 August CKOV Parts of the first (of 2) detector have arrived at RAL (+ L.Cremaldi and David) Customs overcome with 'magic words' – not totally smooth, but getting there! Aerogel, box, mirrors (From USA) and phototubes (from Trieste) will be ready in september second CKOV could be there for November. Support being build under supervision by W. Lau (Oxford) TOF0/1 being built in Milano, delivery at RAL 1st November with laser calibration system DAQ delivered by JSGraulich and VVerguilov. All installed in R12. --> DAQ workshop July: -- interface with software and data storage -- transmission of knowledge to tracker group (James Leaver et al) -- empahsized need for Controls and Monitoring task (Daresbury) to begin (Target control, beam magnets, safety)

MICE CMPB Alain Blondel 1 August DAQ -- RAL In R12 (East) 2 VME Crates - 2 Interfaces - 2 Trg Receiver - TDC V Scaler V830 - fADC V PCs 2 NIM Crate 1 Network Switch 2 Scint. + PMT from IC

MICE CMPB Alain Blondel 1 August this shows cable routings, control room etc... and was sent to all MICE for verification (A. Oates)

MICE CMPB Alain Blondel 1 August THE DIPOLE B2 in place (recess position)

MICE CMPB Alain Blondel 1 August  Aspirational MICE Schedule as of july November 2007 Or January 2008 STEP I April 2008 STEP III July 2008 STEP II STEP IV Delivery of 1st FC May 2009 STEP V summer 2009 STEP VI end 2009 (or 2010) UK PHASE I UK PHASE II